under-compression of head & tail from 3rd-order term. L2 wakes induce new 3rd-order correlation ... 1st, and 2nd-order correctable with S-band and X-band RF...
LCLS Timing Outline Scope SLC Master Pattern Generator Introducing the PNET VME receiver Status of the PNET VME receiver System diagram Timing pulse to pulse
Takes as input: 360 Hz fiducial from SLC PDU is the signal to create a ... Outputs PNET buffers to all micros and PNET VME receiver on the next 1/360 s fiducial ...
LCLS Magnet Control Challenging Design Issues How to integrate the legacy system with the new Subsystem architecture Magnet IOC Design Interface to legacy ...
System requirements (speed and content) are known: receive 128 bit PNET data at ... Driver and device support (bi, mbbiDirect to access each variable in ...
LCLS Photon Systems Status John Arthur LCLS Photon Systems Manager Technical status and accomplishments Response to FY2007 continuing resolution LCLS/LUSI coordination
LCLS Extruded Vacuum Chamber (current status) Emil Trakhtenberg Greg Wiemerslage Mark Erdmann Patrick Den Hartog Changes in LCLS VC design after production of the ...
Stephanie Allison. LCLS Event System. saa@slac.stanford.edu. 14 ... Stephanie Allison and Mark Crane coming up to speed. Test stands for HW folks not yet ready ...
Y. Ding, Z. Huang. CSR energy loss after BC1 measured with BPM ... J. Craft, V. Pacak, et al. RF Feedback Running. Paul Emma, et al. LCLS DOE Review ...
stay away from windows, downed power lines. In the event of an ... FAC Review. scharf@slac.stanford.edu. 24 - 28 October 2005. 7. Recent Accomplishments ...
... with emphasis on ultrafast dynamics, nonlinear optics, x-ray imaging ... determinations for large biomolecules or nanocyrstals via x-ray imaging ...
Injector Transverse Deflector Cavity Station 20-5 and Station 24-8 will be connected to the new control system and used to drive the L0 and Sector 25 transverse ...
LCLS Injector Intermediate Power Supply Design Review ... Injector Bend, Solenoid, and QB Power Supplies. Power Supply Controllers and Transductors ...
LCLS Gun Commissioning Status & Plans David H. Dowell LCLS Injector Commissioning Workshop October 9, 2006 Status of gun fabrication and testing Gun test results
LCLS Photon Systems ETC and Methodology John Arthur LCLS Photon Systems Manager LCLS Photon Systems Schedule Overview Milestones ETC Risks Photon Systems WBS 1.05, 2 ...
It received internal review and review from safety committee chairs and safety officers. ... and acceptance was through the Director's office. 4. ARR 3/14/07. D. ...
Cable Plant Davis Bacon Phase IV & Phase V Contracts. Fiber ... Fiber Trunks support ethernet switches and MPS. T. Lahey, M. de Salvo, SCCS networking ...
Spells out our plan for turning on the LCLS systems. Currently working on rev-1. ... low emittance tuning, gain curve measurement, precision x-ray measurements ...
Report to the LCLS Facilities Advisory Committee Mark Reichanadter LCLS Deputy Project Director Project Management Status Cost and Schedule Performance
LCLS Diagnostics and Commissioning Workshop Injector, Linac and Undulator Diagnostics and Beam Position Monitors P. Krejcik Context of Diagnostics in Commissioning ...
General Properties. Resonant wavelength: ... The noise signal for spatial cuts can be lower, ... Requires some spatial and/or spectral cut to select FEL signal. ...
... Georo Braze Results: ... 1 Lower temperature braze (Orotin) and Induction heating ... Option 3 Braze window into a frame (Kovar) with similar expansion coef and ...
Spontaneous and FEL signals in Direct and Indirect Imager Diagnostics ... 60 Angstrom period. Gamma = 0.2. On 0.5 mm thick Si. 10 cm diameter. 2.90068 degrees. 1 m ...
LCLS has 33 undulator segments, each segment has a positioning ... Potentiometer Readout. Motor setup (7) 11. MEDM User Interface. 12. MEDM User Interface ...
Determines the Feedback Gain needed for control. Effects are driven by . Q. L. and the available klystron power for lightly loaded cavities. JLAB Upgrade Cavity ...
TRC Rate 4.04 (3 Incidents) LCLS Collaboration. 1,546 K Hours worked. DART Rate 0.26 ... DOE/SC Goal is a Reportable Case (TRC) rate of 0.25 and a Days Away, ...
facilities for production and transport of a bright, high-current ... EPICS based system is preferred because interface between experiments and FELis CRITICAL ...
... be used for Two Purposes: ... time shot to shot signal levels and record integrated values up ... Cerenkov medium coupled to a high gain photomultiplier tube ...
Office of Science Laboratory. Operated by The University of Chicago. Argonne National Laboratory ... in staffing has support of ANL management. Organization ...
Not yet mature - Require expensive. femtosecond lasers. Possible Solutions ... Also see: http://www.rijnh.nl/users/berden/ebunch.html. G. Travish. FAC Meeting ...
The beam sees 3.5uS of RF from SLED cavity which the klystron fills and is then ... Phase fast time plots show pulse to pulse variation. at 30Hz. ... 1fS The Day After ...