LCLS Linac Meeting
  • General meeting to integrate systems
  • More details in system meetings (e.g., RF or ESD)
  • Review status and schedule, provide communication
  • Once per two weeks Wed. at 930 here in
    Alexander?
  • Linac Introduction (P. Emma)
  • Construction and Installation Schedule (E. Bong)
  • Corrector Upgrade (P. Emma, W. Linebarger)
  • Linac BPM upgrade ? (R. Johnson)
  • Bunch Length Monitors ? (P. Krejcik)
  • Questions, comments, ideas ?

2
LCLS Linac Design
  • New injection point at 21-1a
  • Two new chicanes (at 21-2 and 24-7)
  • Rebuild FFTB using existing magnets

3
L1-Linac and BC1 Optics
  • Remove five 10-ft RF sections (21-2a,b,c,d
    21-3a)
  • Cut down two 10-ft long acc. sections to 9.4-ft
  • 9 new quads, 4 bends, 8 BPMs (plus correctors)
  • New 60-cm long X-band RF section at 21-2a
  • 4 new wire scanners, two new screens (OTR?), 1
    x-collimator

4
L2-Linac Optics
4 new wire-scanners
  • No new magnets in L2 (except corrector upgrade)
  • One new 25-A bulk quadrupole supply in each of
    sectors 23 24
  • 4 new wire scanners

5
BC2 Optics
  • Remove eight 10-ft RF sections (24-7a,b,c,d
    24-8a,b,c,d)
  • 4 new quads, 4 bends, 4 BPMs (plus correctors)
  • New 2-m long super-conducting wiggler magnet at
    24-7a
  • 1 new screen and x-collimator in chicane

6
Optics in L3-Linac
move 2 existing sector-28 wire-scanners
Transverse Deflector (25-5a)
screen (Q25-901)
  • No new magnets in L3 (except corrector upgrade)
  • One new 25-A bulk quadrupole supply in each of
    sectors 25-29
  • move two existing wire scanners
  • Move transverse RF deflector from 29-4 to 25-5a
    and add screen at 25-901

7
Optics Through DL2
(uses existing FFTB bends and quads)
undulator
  • Rebuild FFTB using existing FFTB magnets and BPMs
  • 5 new wire scanners 2 screens
  • 2 new vertical bend magnets
  • Move single-beam dumper magnet dump to FFTB or
    BSY

8
Proposed Responsibilities
  • RF systems (R. Akre, A. Hill)
  • Mech. engineering for L1/BC1 (L. Eriksson, E.
    Bong)
  • Diagnostics, e.g., bunch-length monitors (P.
    Krejcik)
  • Power conversion controls? (W. Linebarger)
  • BPMs upgrade (R. Johnson)
  • Magnets BC1 1Q5.6 (C. Spencer)
  • S.C. Wiggler (J. Welch)
  • e- dump (M. Woodley)
  • Operations liaison (M. Stanek)