LCLS Undulator Week@SLAC - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

LCLS Undulator Week@SLAC

Description:

Cable Plant Davis Bacon Phase IV & Phase V Contracts. Fiber ... Fiber Trunks support ethernet switches and MPS. T. Lahey, M. de Salvo, SCCS networking ... – PowerPoint PPT presentation

Number of Views:23
Avg rating:3.0/5.0
Slides: 8
Provided by: carle8
Category:
Tags: lcls | slac | trunks | undulator | week

less

Transcript and Presenter's Notes

Title: LCLS Undulator Week@SLAC


1
LCLS Undulator Week_at_SLAC
  • Undulator Network Status
  • Controls
  • (1300 hrs, Redwood Rm A/B)

2
Agenda
  • Accelerator Network Infrastructure supports IC
    Ethernet and MPS
  • Design Overview
  • Cable Plant Davis Bacon Phase IV Phase V
    Contracts
  • Fiber Termination Contract
  • Integrating with other networks
  • Alignment Diagnostics System Network G. Gassner
  • Conventional Facilities J. Sevilla
  • Photon Sections G. Haller
  • SLAC Scientific Computing and Computing Services
    (SCCS) centralized networking groups are helping
    with all networks

3
Network Design
  • Accelerator Switches reside in service buildings
    913 and 921 to reduce heatload
  • B913 UIR 1-15
  • B921 UIR 16-33
  • 3 cat6 cables to each UIR CA ethernet, power
    reset, console port
  • Cat6 longhauls between service building patch
    panels and cat6 boxes at racks
  • 4 walkup stations one each COW and wireless
  • Other IOCs are located in service buildings MPS,
    BPM, etc.
  • Fiber Trunks support ethernet switches and MPS

4
Davis Bacon Fiber Contracts
  • Phase IV install and test cat6 longhauls
  • LNET14 is UIR cables
  • Phase V fiber pull
  • Fiber Termination Contract terminate and test
    fibers

5
Phase IV Cable Plant Schedule
6
(No Transcript)
7
Activate Connections
  • Commission Switches
  • Install jumper cables
Write a Comment