2 LCLS vacuum chamber current status
- All 41 chambers are fully machined.
- 41 chambers have been welded.
- 35 chambers were inspected, baked, certified and
shipped to SLAC. - The rest of the chambers will be shipped to SLAC
before 05/10/08.
3 Changes in LCLS VC design after production of
the first six chamber to simplify its alignment
First six chambers
All other chambers
4 LCLS vacuum chamber adjustment and wall thickness
inspection
- After changing of the chamber design and
adjusting system design - chamber alignment usually took about 4 hours.
- Wall thickness variation for the most of the
chambers is within 40µ. - Some results of the vacuum chamber inspection
are shown on - the next slides
5 6 7LCLS VC alignment and thickness inspection
8Graphical Display of Surface finish Data
Should be Avoided
Acceptable
Very Desirable
9Surface Finish Summary
- The average of all vacuum chambers is 14.86 mrad
in Z' and 35.14 mrad in X' - Extrusions 7, 10, 16, 28 and 35 were sacrificed
to verify surface finish in the middle of the
extrusions
10LCLS VC on the weldment table
Flange installation fixture
11 End bi-metal flange welding
All bi-metal flanges were polished, inspected and
welded
12Inspection and correction of the LCLS VC end
flange perpendicularity (.003 - .004 precision)
13Inspection of the total length of the LCLS VC
Initial attempt to inspect the vacuum chamber
length using caliper, gage block and filler gage
failed.
Finally length of the all vacuum chambers after
welding was measured successfully using laser
tracker.
14Summary of the Inspection of the total length of
the LCLS VC
15LCLS VC on the baking stands
16LCLS VC on the baking stands
Note Ion-pumps are still off
17 LCLS vacuum chambers in the shipping crate
18CONCLUSION
- Manufacturing and certification of the LCLS
vacuum chambers is proceeding with the full
agreement with our schedule and within the
allocated budget. - We plan to deliver all LCLS VC to SLAC before
05/10/2008
19ACKNOWLEDGMENTS
- A special thank you to
- Joe Gagliano, George Goeppner,
- Dana Capatina, Scott Doran, Esiquio Salazar,
Kevin Knoerzer, Russel Otto, Dan Nocher, Mike
Bosek, Dan VanLannan, - Wayne Michalek, Mark Martens, Paul Aguirre,
Aaron Lopez, - Lahsen Assoufid, Jun Qian, Albert Macrander
- Frank Bock (Cardinal aluminum Co.),
- Don Fulcher (Engineered Finishing Co.),
- Simon Sorsher (Hi-Tech Mfg.).