Title: Presentazione di PowerPoint
1SPECTROMETER(S) Prospects for a New Neutrino
CERN-PS Experiment
NESSiE
Neutrino Experiment with SpectrometerS in Europe
Technical Proposal jointly submitted to SPS-C
arXiv1230.3432, April 2012
2Experimental motivations
- In the last decade a set of experimental results
challenged the 3 n framework? no one conclusive,
but all pointing toward the same direction
LSND
MiniBooNE n and n-bar
Gallium MCi exposure
Cosmology
Reactor n-bar anomaly
3A conclusive experiment
- A coupled system of LAr detector muon
spectrometer for - Observation ofall reaction channels(nm, ne CC,
NC)through the uniqueLAr-TPC imagingcapabilitie
s - Charge separationand muon momentumextension
with amagnetized ironspectrometer - Different sitesnear (300 m) far (1600 m)
4Where CERN North Area
- 100 GeV primary beam fast extracted from SPS
- Target station next to TCC2
- Decay pipe L 100 m, ø 3 m
- Beam dump 15 m of Fe with graphite core,
followed by µ stations - Neutrino beam angle pointing upwards, at -3m in
the far detector, 5 mrad slope
5The ICARUS-NESSIE Collaborators
- M. Antonello1, D. Bagliani2, B. Baibussinov5, M.
Benettoni5, P. Bernardini25,26, A. Bertolin5, H.
Bilokon6, F. Boffelli8, M. Bonesini9, C. Bozza31,
R. Brugnera4,5, E. Calligarich8, N. Canci1, A.
Cecchetti6, S. Cecchini24, S. Centro4,5, A.
Cesana10, K. Cieslik11, D. B. Cline12, A. G.
Cocco14, G. Collazuol5,6, P. Creti26, F. Dal
Corso5, I. De Mitri25,26, D. Dequal4,5, A.
Dermenev15, G. De Robertis22, M. De Serio22, L.
Degli Esposti24, D. Di Ferdinando24,R.
Dolfini7,8, M. De Gerone2,3, U. Dore28,29, S.
Dusini5, S. Dussoni2,3, P. Fabbricatore3, C.
Fanin5, C. Farnese4, A. Fava5, A. Ferrari16, R.
A. Fini22, G. Fiore26, G. Fiorillo13,14, A.
Garfagnini4,5, G. T. Garvey17, F. Gatti2,3, G.
Giacomelli23,24, R. Giacomelli24, D. Gibin4,5, S.
Gninenko15, G. Grella30, C. Guandalini24, F.
Guber15, M. Guerzoni24, A. Guglielmi5, M.
Haranczyk11, J. Holeczek18, A. Ivashkin15, M.
Kirsanov15, J. Kisiel18, I. Kochanek18, U. Kose5,
A. Kurepin15, J. Lagoda19, G. Laurenti24, M.
Laveder4,5, I. Lippi5, F. Loddo22, A. Longhin6,
P. Loverre28,29, G. Lucchini9, W. C. Louis17, G.
Mancarella25,26, G. Mandrioli24, S. Mania18, G.
Mannocchi6, S. Marchini5, A. Margiotta23,24, G.
Marsella26,27, V. Matveev15, N. Mauri6, E.
Medinaceli4,5, A. Menegolli7,8, G. Meng5, A.
Mengucci6, M. Mezzetto5, R. Michinelli24, G. B.
Mills17, C. Montanari8, M. T. Muciaccia21,22, M.
Nicoletto5, D. Orecchini6, S. Otwinowski12, T. J.
Palczewski19, A. Paoloni6, G. Passardi16, A.
Pastore21,22, L. Patrizii24, F. Perfetto13,14, P.
Picchi6, F. Pietropaolo5, P. Plonski20, M.
Pozzato23,24, A. Rappoldi8, G. L. Raselli8, R.
Rescigno30, G. Rosa28,29, M. Rossella8, C.
Rubbia1,16, P. Sala10, A. Scaramelli10, E.
Segreto1, S. Simone21,22, M. Sioli23,24, G.
Sirri24, M. Spurio23,24, L. Stanco5, S.
Stellacci30, D. Stefan1, J. Stepaniak19, R.
Sulej19, A. Surdo26, O. Suvorova15, M.
Tenti23,24, M. Terrani10, D. Tlisov15, V. Togo24,
R. G. Van de Water17, G. Trinchero6, M. Turcato5,
F. Varanini4, M. Ventura6, S. Ventura5, C.
Vignoli1, H. G. Wang12, X. Yang12, M. Zago5, A.
Zani8 and K. Zaremba20.
6 Produced documentation so far
- Relevant documents sent to SPS Committee by the
ICARUS and NESSiE Collaborations - a Memorandum from the ICARUS collaboration
(SPSC-M-773) of March 9, 2011 - Proposal A comprehensive search for
ltltanomaliesgtgt from neutrino and anti-neutrino
oscillations at large mass differences (Dm2
1eV2) with two LArTPC imaging detectors at
different distances from the CERN-PS
(SPSC-P-345) of Oct. 14th, 2011 - Proposal Prospect for Charge Current Neutrino
Interactions Measurements at the CERN-PS with
two magnetic spectrometers for measuring CC
neutrino interactions (SPSC-P-343) of Oct. 11th,
2011 - Joint Technical proposal Search for anomalies
from neutrino and anti-neutrino oscillations at
Dm2 1eV2 with muon spectrometers and large
LArTPC imaging detectors (SPSC-P-347) of March
15th, 2012.
7Beam Studies at SPS
- 100 GeV proton, Fast Extraction (10.5 ms),
Luminosity as at CNGS (conservative)
On-Axis !!
CC muons
CC electrons
Scenario defined for DATA Taking 2 years of
anti-n followed by 1 year n
8NESSiE detector concept
- NESSiE (Neutrino Experiment with SpectrometerS in
Europe) - Goal
- Allow charge separation and momentummeasurement
of as many muons as possibleescaping from LAr
(large statistics ? low sin22q) - Go as low as possible in muon momentum(low
momenta ? low Dm2) - Possibility to also study (NESSiE) internal
events(coarser resolution w.r.t. LAr) - Solution
- Air-core magnets for low momentum muons escaping
from LAr(Em lt 0.5 GeV/c in NESSiE ? ?En? lt 1 GeV
in LAr) - Downstream massive iron dipolar magnets for
higher momenta extension
Dm2
Statistics
Spectrun
sin22q
9Muon disappearance signal
Measured muon momenta in Far detector for anti-nm
CC and nm CC with oscillation (red) compared
to the non-oscillated distribution. Event rates
are for 4.5x1019 pot at 100 GeV, negative
polarity reconstructed in the fiducial volumes of
the Spectrometer alone
9
10Comparison with MINOS limits
11Air-core magnet
- New concept for a largetransverse area magnetic
fieldin air (40 m2) - B 0.15 T
- Power lt 2 MW
- To be coupled to a mm detector(different
possibilities under study)
12NESSiE iron dipolar magnets
Coils
B 1.5 T
1800 700 m2 of RPC 20000 12000 digital
channels
detector layers
B
B
FAR
NEAR
13Detector configuration (far position)
ACM
dipolar (1 arm) dipolar (2 arms)
Charge mis-reconstructionat few percent level in
alldynamical range of interest (full simulation
includingselection, efficiency andrecontruction)
n
Picture credits G. Sirri
14NESSiE time schedule
- Physics proposal submitted to SPSC in Oct 2011
arXiv 1111.2242v1 - In the meanwhile
- Request to switch PS ? SPS
- Joint technical proposal submitted to SPSC in
March 2012 arXiv1203.3432 - From green-light, we expect 3 years of
prototyping and construction? run in 2016
15Actions in the near future
SEPTEMBER evaluation at European Strategy Group
(CERN) evaluation at Research
Board evaluation at
CN-II OCTOBER submission to CTS JANUARY
requests s.j. (A) for Prototypes and Technical
Studies End 2013 requests s.j. (B, extra CN-II)
for starting tenders
16NESSiE
Collaboration
Bari 0.6 FTE/3 Bologna 2.0/5 Frascati
0.5/2 Lecce 3.2/7 TOTAL
10.7 FTE / 29 people Padova 3.8/9 Roma1
0.6/3 almost factor 3 in FTE with respect last
year
- In the near future
- joint submission to European Strategy for
- RD for far future LBL
- enlarge Physics investigation in case of discovery
17Coinvolgimenti BARI Simulazione, Front-End
BOLOGNA Simulazione, Software, DAQ, Disegno,
Meccanica FRASCATI Simulazioni, Disegno,
Rivelatori, Meccanica LECCE Rivelatori,
Meccanica, Front-End, DAQ PADOVA Simulazione,
Disegno, DAQ, Meccanica ROMA-1 Simulazione e
Software
18NESSiE
Gruppo di Padova
M. Benettoni (30) A.Bertolin (60).
Responsabile Locale F.Dal Corso (10) S. Dusini
(40) C.Fanin (10) U.Kose (30) M. Laveder
(20) I.Lippi(60) E.Medinaceli(40) M.Mezzetto
(20) C.Sirignano (20) L.Stanco (40).
Responsabile Nazionale
3.8 FTE
- Riferimenti nella collaborazione
- Stefano Dusini Simulazione Detector e DAQ
- - Luca Stanco Supervisione Collaborazione
Nel 2013 dovranno partire con le gare, test di
rivelatori, allestimento sale sp. A Padova si
chiedono 6 mesi-uomo di Ingegnere e 12 mesi-uomo
di disegnatore
19NESSiE
Richieste finanziarie 2013
(Richieste molto corpose, modulo lapprovazione)
Missioni Interne 14655(s.j.) (3020 a PD)
Missioni Estero 10920(s.j) (4520 a PD)
Consumo 142860(s.j.) (250 a PD)
Inventario 15 (0 a PD)
? Tot 412 K 935(s.j.), di cui a Padova
10040(s.j.)
? Inoltre, per fine 2013 chiesti 2000 K
Richieste ai servizi PADOVA per il 2013
Elettronica 2 m.u. per consulenza DAQ
2 m.u. per consulenza
Front-End Meccanica 12 mesi uomo
prototipizzazione Uffico Tecnico 612 mesi per
Struttura meccanica