Title: AMS 02 THERMAL CONTROL SYSTEM Status report
1AMS 02 THERMAL CONTROL SYSTEMStatus report
2OPEN ISSUES FROM THE JANUARY TIM1) TRACKER
RADIATOR2) ZENITH RADIATOR
3(No Transcript)
4Flat Radiator (1.6 m2) Jan 2003
WAKE
RAM
5Flat Radiator (78 area)
WAKE
RAM
6Flat Radiator (78 area)
7TRACKER RADIATORCDR BASELINE (78 area)
8Tracker radiators for CDR
- Area1.26 m2
- Mass2 X (13 Kg 5.5 Kg for the brackets)
- 2 condensers per radiator
- Tracker nominal dissipation 144 W (was 192 W)
- Nominal mass flow rate 3 g/s
- Pre-heating power 50 W
9Curved Radiators
WAKE
RAM
10Curved Radiator
11Beta 0-2-101_hot
12Beta 75-15-20-15_hot
13Zenith radiator
14CRYOS radiator 4.8 sq(m)
CRYOS radiator 4.1 sq(m)
15Zenith radiator
166 Samples
17Radiator Position Relative to AMS02 Coordinate
System (Position is presently 1613,3 mm. Should
be 1600 mm)
18MAIN RADIATORS
19Main radiators MID BRACKETS
20Softer mount larger enforced
displacements Stiffer mount
smaller enforced displacements
21MID BRACKET CDR
- Current design shows negative margins
- Updated FEM model was sent to LMSO to generate
new I/F displacements (current loads are based on
out-of-date model and could be too cconservative) - Direct attachment to the crates columns under
evaluation
22(No Transcript)
23MID BRACKET CDR
- Current design shows negative margins
- Updated model was sent to LMSO to generate new
I/F displacements (current approach too
conservative) - Direct attachment to the crates columns
24Heat Transfer Areas between CRATES and Face Sheet
WAKE
RAM
25Heat Pipe Layout CRATES RAM Radiator
26Heat Pipe Layout CRATES WAKE Radiator
27RECOMMENDATIONS
- To improve the thermal perfomance of the
radiators vertical heat pipes will be considered. - This choice is partially affecting the
possibility to test the system on ground - hottest levels will not be tested in
Thermal-Vacuum test
28TURNING ON AMS (activation sequence)ANDHEATERS
29Heaters architecture
WAKE
RAM
Zone heaters 7
Zone heaters 4
Zone heaters 1
Tracker Radiator
Feed A
Main Radiator
Zone heaters 8
Zone heaters 5
Zone heaters 2
Feed B
PDB
Available heater line
Rich/Ecal Radiator
Zone heaters 9
Zone heaters 3
Zone heaters 6
30AMS installation on the ISS
- AMS is removed from Shuttle cargo bay by a
robotic arm. - During the transfer phase to the ISS, it will be
powered (1800 W available) through the robotic
arm grapple fixture - As soon as it gets installed on the ISS, the
following activation steps are foreseen
31Heaters Operational Sequence(PDB heaters and
Zone heaters)ON THE ISS
- Start assumption we are at -40C
- 1) PDB heater ON
- 2) When T(PDB)gt-25C
- gt PDB ON (assumption 150W dissipated for
heaters feeding) - gt Zone Heaters ON
32Tot900W
33Tot900W
34Tot1800W
35Tot1800W
36Operational heaters
- DEDICATED HEATERS LINE (fed at 120V DC) are
currently foreseen for some subdetectors - TRD GAS BOX
- 6 W 50 W
- TTCS
- 100 W
- CAB?
- LOWER TOF?
37Does anybody else need heaters?
- This is the right time to ask for!
38Who is responsible for MLI?
- CGS
- Radiators backside (Tracker, RAM, WAKE, RE)
- Cryocoolers
- LMSO/NASA
- Vacuum case (external side, flanges, upper and
lower skirts) - Tracker upper and lower Tracker group
- TRD lateral
- RICH Mirror
- ECAL bottom
- RWTH Aachen
- TRD-zenith radiator
- Below TOF
- INFN BO
- RICH-ECAL
39Thermal ICD
- New issue of the Thermal ICD needs urgently
inputs from the following people
A.Woering- M.Capell- M.Pohl- B.Verlaat- A.Posada
J.Ulbricht- R.Henning- L.DeFranchis- G.Viertel
W.Wallraff- P.Nemeth- P.Trampus- HPVonGunten
C.GargiuloG.Laurenti- J.L.Issler
- Goal get the inputs and release issue 5 of
Thermal ICD by Mid May 2003 - If on the list you will be contacted
40Schedule
- Thermal CDR September 2003
- STA manufacturing start November 2003
41BACKUP SLIDES
42Weight update
43Thermal control structure mass budget(total
was 310.9 since January 2002)
44Radiator Section with Main Dimensions
45(No Transcript)