Title: AMS02 tracker meeting


1
AMS02 tracker meeting
  • SAFETY and Quality Assurance
  • July 20, 2005

2
Summary
  • Safety Phase II
  • Payload Flight Hazard Report
  • Hazard summary (tracker, star tracker, ttcs)
  • Integration schedule

3
TIM vs Safety
  • After the next TIM we will go to the
  • SAFETY-Phase II
  • The updated information from the next TIM will be
    used by Jacobs-Sverdrup in order to transfer in
    the closed status all the hazards.

4
Safety Phase II
  • News from Jacobs-Sverdrup (Leland Hill)
  • The latest schedule shows a September-October
    time frame for the phase II
  • But the program management is considering a
    slight delay for the safety panel

5
Safety Control Panel
  • The last revision of the Payload Flight Hazard
    Report
  • May 25, 2005
  • But during the last month many action has been
    taken to provide information to Jacobs.

6
Payload Flight Hazard Report (PFHR)
  • As you know, generally, two kind of hazard can be
    identify
  • the standard hazard (are common hazard from a
    generic payload, like structural failure or high
    voltage)
  • the unique hazard (specific hazard for the
    payload, like a cryogenic pressure system.

7
Hazard Management
  • Each hazard is identify by a code number
    AMS-02-Fxx where xx is the hazard assigned number
    and by an Hazard title first classification of
    the hazard
  • The hazard management is done by xx main steps
  • Causes to identify the causes of the hazard
  • Control to identify the hazard control method
  • Verification to identify the verification
    method
  • The step status must be OPEN or CLOSED

8
brief Hazard Summary
  • NOTE in the following slides only the hazard
    directly related to the our sub-component has
    been collected.
  • In the PFHR we can find all the general hazard,
    causes control method and status.

9
Tracker
  • AMS-02-F01/ Structural Failure of Hardware
  • The step1 of bolts analysis has been started we
    are waiting for the results
  • Status OPEN

10
Tracker
  • AMS-02-F01/ Structural Failure of Hardware
  • Fracture control for composites
  • available a draft report already submitted to
    Jacobs
  • Action _at_ TIM splinter meeting with Bruce Sommers
    for the Fracture Control for Composite
  • Status OPEN

11
Tracker
  • AMS-02-F01/ Structural Failure of Hardware
  • Acoustic analysis in work
  • Status OPEN

12
Tracker
  • AMS-02-F08/ Electric Shock/Discharge
  • No mate/demate connectors hazard
  • Status CLOSED

13
Tracker
  • AMS-02-F16/ Shatterable Material Release
  • Vibration testing of Tracker sensor
  • Status OPEN
  • NOTE a vibration test to a single ladder has
    been performed!?

14
Tracker
  • AMS-02-F20/ Crew Exposure to Coherent Light
  • Tracker alignment system
  • Status OPEN

15
Star Tracker
  • AMS-02-F01/ Structural Failure of Hardware
  • Fracture control for composites
  • available the fracture classification from
    Jacobs
  • available a control report already submitted to
    Jacobs
  • Status OPEN
  • NOTE we are waiting comments for the control
    report

16
Star Tracker
  • AMS-02-F14/ Sharp edge/Corners
  • Baffle subsytem the Star Tracker baffles will be
    noted as no touch zones.
  • Inspection of design for sharp edges, corners,
    etc
  • Status OPEN
  • NOTE hazard assessment probably in the next
    safety phaseII

17
Star Tracker
  • AMS-02-F16/ Shatterable Material Release
  • Vibration testing of Star Tracker lenses a
    vibration test has been performed
  • Status OPEN

18
Star Tracker
  • AMS-02-F16/ Shatterable Material Release
  • Star Tracker Lenses will be pressure decay tested
    to confirm venting performance without damage or
    release
  • Status OPEN
  • NOTE test has been performed and result already
    send to Jacobs.

19
Star Tracker
  • AMS-02-F16/ Shatterable Material Release
  • Review of Design to confirm mass of optical
    components
  • Status OPEN
  • NOTE optical mass list already send to Jacobs.

20
Star Tracker
  • AMS-02-STD-02/ Vented Container
  • Review of DesignInspection of as built hardware
  • Status OPEN
  • NOTE report on venting system already send to
    Jacobs.

21
Star Tracker
  • AMS-02-STD-02/ Vented Container
  • Review of Design Inspection of as built hardware
  • Status OPEN
  • NOTE report on venting system already send to
    Jacobs.

22
TTCS
  • AMS-02-F04/ Overpressurization of Orbiter Payload
    Bay
  • Review of Design
  • Status OPEN

23
TTCS
  • AMS-02-F05/ Rupture of AMS-02 Pressurized Systems
  • 5.4.1 SVM Testing of carbon dioxide
    freezing/heating cycles
  • 5.4.2 SVM Thermal Analysis
  • 5.4.3 SVM Analysis based on worst case thermal
    profiles and two failures (if applicable)
  • Status OPEN

24
TTCS
  • AMS-02-F05/ Rupture of AMS-02 Pressurized Systems
  • 6.1.3 SVM Review of Tracker Thermal Control
    System Filling Procedures
  • Status OPEN

25
TTCS
  • AMS-02-F10/ Flammable Materials in the Payload
    Bay
  • 2.1.1 SVM Review of design and as built
    hardware for proper design, fill and construction
    of heat pipes.
  • 2.1.2 SVM Flammability assessment on the use of
    ammonia in the payload bay.
  • Status OPEN

26
Quality Assurance
  • Main issue integration hardware schedule and
    procedure.
  • For Star Tracker and TTCS the Project plan is
    available and already send to Jacobs
  • For Tracker is available a draft version, and we
    work during TIM to translate in a MS version.