Title: Perspectivas del Desarrollo Regional: Estructura y Rentas
1Investment status and perspective in the region
of Piura
PIURA
A region that has everything.
Dr. César Trelles Lara Regional President
2- Piura is located in the north of Peru, exactly at
1000 kilometers from Lima city. s - It has coastal, highland and mountainous
rainforest ecosystems. It limits in the north
with Tumbes with and our neighbor country
Ecuador, in the south with Lambayeque , in the
east with Cajamarca and in the west with the
Pacific Ocean. - This is one of the most potentially rich in the
country because of its agriculture, agribusiness,
tourism, mining resources , marine and dry forest
biodiversity. - It has an area of 36 403 km2 and a total
population of1700,000 inhabitants. (2008). - Its is politically divided in 8 provinces and 64
districts.
Piura
LOCATION
3- Productive specialization
- Agribusiness (mango, lime, grapes, sugar cane and
fruits) - Oil products gas y petroleum
- Services and Trading.
- Fishing and aquaculture.
- Mining Phosphates, copper , molybdenum, etc.
- Beach, historical and gastronomic tourism.
- Economic and population concentration
- Highly populated areas are Piura, Sullana, Talara
and Paita. - Population is very young
- Sanitary risks in the rural zones particularly in
the highlands called Sierra. - Limitations or constrains
- Rights of property of lands and water usage
(small areas called mini fundios) and risk of
water scarcity duet to Poechos reservoir silting. - Recurrent El Nino effects (heavy rains and
droughts). - Limited access to export services (Finance,
updated information and others) - Not much diversification of exporting goods.
ECONOMIC DYNAMICS OF PIURA
Oil production and Tourist Zone
Río Blanco
Tambogrande
Fishing Zone
Agribusiness Zone
Area of Poverty
Main Trading Routes.
Non Metalic Mininga Bayovar zone
ECONOMIC DYNAMICS
4VISION DEL DESARROLLO REGIONAL
Piura development depends on a coherent promotion
policy of the private investors in all the
sectors of the economic activity in harmony with
the rest of strategic objectives like i) to
have a sustainable and environmentally clean
region, ii) the development of capacities, iii)
effective fighting against poverty, iv) the
regional productive development and, iv)
efficient public management, with solid
agreement policy, strengthen citizens
involvement and participation.
REGIONAL DEVELOPMENT
5DESARROLLO SOCIAL Reducción de la pobreza,
inequidad, discriminación Económica social y
política
Economic Development Diversifying
production, Developing capacities, Economic
articulation
Central Axe
Capacities Development Count with
competitive human resources necessary to cover
the unsatisfied demand generated by the
regional economical activity.
Territorial Ordering Occupation, conditioning and
use of the land with environmental responsibility
and risk management.
Inter sectorial and inter institutional effort
to achieve a higher degree of competitiveness
Governamental stability Institutional
strengthening, transparency, citizen agreement y
city vigilance
STRATEGIC AXES 2007-2021
6ESTRATEGY IN PROMOTING INVESTEMENT
- It is centered in 04 policies and basic working
lines - Communications, based on the investment promotion
on the ways of communication, airports, ports,
roads, and internet connections. - Competitiveness, improving the regional
production, the productivity, and the capacity of
business management in agriculture, agribusiness
and tourism. - Hydrology and Hydraulics, developing products of
irrigation infrastructure dams, technological
irrigation systems with a potential of more than
500 thousand hectares under irrigation for
agricultural products to be exported. - Basic and social services infrastructure and
social projects (education, health care,
sanitation).
PROMOTING INVESTMENTS
7ESTRATEGY IN PROMOTING INVESTMENTS
PROMOTING INVESTMENTS
8PROTECTING OUR INVESTORS
- The Regional Government of Piura has been
committed to develop in a sustainable way and
effective competitiveness in promoting private
investment in our region, giving assurance to our
investors by providing - Economic and legal stability within the framework
of their competencies. - Transparency and clear rules.
- Development the energetic infrastructure, and
communication by roads, ports and airports. - Concessions, Adjudications, Public and Private
Participation and Strategic Alliances.
PROMOTING INVESTMENTS
9INVESTMENT OPPORTUNITIES
- Water
- Development of irrigation projects and
infrastructure - development Poechos, Alto Piura, Vilcazan
and others. - 2. Water system management.
- Agriculture
- Climatic advantage that allows to produce more
than 60 products for domestic and foreign
consumers. - Nowadays there is 180 thousand hectares under
irrigation, which are very important for our
organic production. - Mining
- Deposit of copper, silver, molybdenum y
phosphate, diatomite, calcareous, silica and
others. - Oil and gas deposit.
- Aeolic energy 1600 MW of power
- Hydroelectric Energy Alto Piura
PROMOTING INVESTEMENT
10INVESTMENT OPPORTUNITIES
- Fishing
- Great biodiversity of species in the sea and
inland - (land and water availability).
- Public infrastructure and services
- Building roads.
- Building schools and health centers.
- Alliances with private investors
- Roads and ports concessions.
- Energy production.
- Services of gas providers and others.
- Services of international logistics and market
access (clusters). - Integration with economic paths domestically and
internationally. - Important interregional integration with the
north and east regions. - Integration with the south part of Ecuador and
eastern Brazil.
PROMOTING INVESTEMENTS
11There is a policy and strategy in the use of
water resources according to the objectives of
the regional development.
Variant e) buildin Golondrina dam in Quiroz
river, 89.5 MD, 300 MMC
Variant c) building of a dam Shashahal in river
Macará 134.8 MD, 440 MMC
Variant d) San Francisco 151.3 MD, for 135 MMC
Espíndola y Anchalay 30 MD,
Variant a) elevation NAMO to the altitude 106,0
m no elevated dam 25 MD, 197 MMC
Variant f) bulding Vilcazan dam, 80 MD, 150 MMC.
Variant b) elevation del NAMO to the altitude
111,0 m 91.5 MD, 587 MMC.
PEIHAP 664MD, 335 MMC.
12Water Resource
- Water Piura, has four main rivers
- Average Annual
Storage - Mass
Capacity - Río Chira River 3600 MMC 480 MMC
- Río Quiroz River 207 220
- Río Piura River 700 0
- Huancabamba River 840 335()
- Underground water 450
300() - TOTAL 5797MMC
700 MMC - () Hydro energetic project de El Alto Piura
(PEIHAP). - () Valley del Alto Piura (Morropón) y (upriver)
Piura (Sechura). - Present water storage capacity is 700 MMC,
- Storage future potential plus the rehabilitation
work of Poechos dam, San Lorenzo dam,
and building PEIHAP and Vilcazan is of 1,800 MMC
to irrigate more than 350 thousand hectares. A
private investment of a bit more than US 900
million.
HYDROLOGY AND HYDRAULICS
13Main Hydroenergetic Projects
- Hydro energetic Project del Alto Piura 702 MD
- Recovering of Poechos dam storage capacity 89 MD
- Buffer watersheds from Poechos dam 11 MD
- Vilcazan reservoir 50 a 80 MD
- Small reservoir of Espíndola
- Small reservoir of Anchalay - Suyo 26 MD
- Satellite reservoirs of Poechos Vilcazan,
Shashasal (440), Golondrina (300), San Francisco
(135). - Management of aquifers of Alto Piura (15 MD) and
Sechura. - Rehabilitation of San Lorenzo irrigation system
(5 MD). - Rehabilitation of the drainage system in the
valleys of Piura and Chira. 70 MD. - TOTAL US 1500 MILLION
HYDROLOGY AND HYDRAULICS
14Agricultural Private Investment
- Propuestas de Siembras a 2010
SOURCE DIRECCION REGIONAL DE AGRICULTURA
-GRP-2008
AGRICULTURAL INVESTMENT
15- BENEFITS
- Employment increases in 50 thousand vacancies ,
from which15 thousand are direct. - Increment of regional exports in more than US
250 million - Increase of domestic food production
- Increase of total regional taxation
MAIN PRIVATE INVESTMENT ACHIEVED
16Other Private Investments June 2008-09
OTHER PRIVATE INVESTMENTS
17En promoción
Private Investment in Portfolio
PROMOTING INVESTEMENTS PROJECTS IN PORTFOLIO
18En promoción
Completed Public Investment in 2008 -2009
PUBLIC INVESTMENT 2008-2009
19En promoción
Executed Public Investmentn 2008 -2009
PUBLIC INVESTMENT 2008-2009
20Private Hydro energetic Component
HUANCABAMBA
IMPROVING OLD AREAS
RIVER HUANCABAMBA
NEW AREAS 19.000 ha
CH CASHAPITE
Private Agriculture Component
Publicly Financed Componente
GENERAL SCHEMA OF ALTO PIURA PROJECT
21- Direct Benefits
- Increasing agricultural land in 19,000
hectares (Has.) and improvement of 31,000 Has. - Generating 75 thousand direct job positions.
- US 400 million of Gross Value of Agricultural
Production. - Increasing exporting capacity of electric energy
in the region 850 GW/h/año - Reactivation of land market for agricultural use.
- Increasing land and water productivity.
- Increasing the export offer of agricultural
products.
- Beneficios Indirectos
- Improving the income of the population in the
area of the project with 150 thousand of indirect
job positions - Improving the standard and quality of life in the
local population. - More productive infrastructure in the region.
- More technical in the agriculture and livestock
production. - Increasing the tax collection due to the increase
in productivity. - Assuring food supply in the region and in the
country taking into account the future climatic
changes.
ALTO PIURA PROJECT BENEFITS
22FINANCING COMPONENT
- The main works of collecting and changing the
course of water (Public Component) will be
financed by public investment to eliminate the
implementation risk. So that it will be
attractive for the private investment the
development of the productive infrastructure in
the hydro energetic component and agricultural
production as well.
Component I compromises Public works of
collecting and changing the water course of
Huancabamba river to the Valley of Piura river.
COMPONENT FINANCING
23WATERWORKS IN POECHOS DAM
- This Dam presents serious problems of silting
(440 MMC), and it wasdeeply affected by el Nino
that occured in the years 83 y 97-98, its
capacity has been reduced the storage capacity in
45 - Objetive recovering the water storage capacity
of Poechos. - The level SNIP has been approved in a
pre-feasibility study. There is support from CAF
for a feasibility study (US 0.5 Millones). - At the same time we consider options of
investment from private source and PPP to
execute at least the first stage of the
waterworks.
WATERWORKS FOR POECHOS DAM
24WATERWORKS FOR POECHOS Pre Feasibility study
Altitude 111,0 year 2011, US 90 M, 1070
MMC Altitude 106,0 year 2008, US 24 M, 680
MMC Altitude 104,5 year 2006, without cost, 580
MMC
Future ? 10 años
WATERWORKS OF POECHOS DAM
25Present status of Poechos Dam
- BENEFITS
- Recovering the storage capacity up to 1070 MMC.
- Assuring irrigation of at least 120 thousand
hectares. - Assuring 240 thousand direct jobs.
- Increasing the exporting production of Piura.
- Assuring enough food for local and national
consumption.
WATERWORKS OF POECHOS DAM
26VILCAZAN PROJECT
- OBJECTIVE Improving irrigation in San Lorenzo
valley and controlling silting in Poechos.
- Benefits
- Increasing regional water storage in 200 MMC.
- Irrigation regulation in San Lorenzo Valley.
- Obtaining two harvests a year in the present
area, doubling the land productivity, obtaining
more annual income per hectare by exporting the
products. - This will allow us to incorporate between 2,600
and 4,200 new hectares depending of irrigation
system and kind of crops in the valley. - Production of about 20 to 24 MW of electric
energy. - Assuring 50 thousand direct jobs and 150 thousand
indirect jobs.
- Present status
- There is a tempora concession requested by the
users of San Lorenzo. - GORE Piura elaborates Pre investment studies.
Estimated investment US 80 MILLION
VILCAZAN PROJECT
27ETHANOL PROJECT
- Being developed MAPLE ETHANOL Y PALMA DEL ESPINO.
- Initial private investment more than US 220
million. - MAPLE ETANOL first stage in 10,684 ha. The
target is 30,000 hectares approximately, with a
plant installed capacity of 300,000 liters a day. - Generating 2000 dirct jobs and 7000 indirect
jobs. - Port and airport installations in the storage
area are being considered. - Marketing Exporting Ethanol valued in 50
million. In the first stage. - PALMA DEL ESPINO Initial investment of US 50
million, based on an area of 5000 hectares, and
associations with small local producers. At the
present has more than 7000 hectares, generating
3 thousand direct jobs and and more than 7
thousand indirect jobs. - Production of sugar and ethanol.
Developments applying Law Nº 28059, of
promoting investment, barren lands have been
given by the Regional Government
Fomenting private investment to generate
dignifying employement in the region
28CLAB
Talara Airport
Talara
INTERNATIONAL AIRPORTS
CETICOS PAITA (free tax zone)
Piura aìrport
Paita
PORTS
Bayóvar
ZONES OF LOGISTIC AGGREGATION
LEADING LOGISTIC BIOCEANIC CENTER
29Paita Port Bayovar Talara andPiura y Talara
Airports
- Modernization of Paita port, with the
construction a wharf and loading crane allow - Speed up the logistic and the competitiveness of
the port. - Approximate investment US 127.8 million.
- It is being promoted
- Private investment to build a multipurpose port
in Bayovar and update the facilities of the port
of liquids in Talara.
PORT INFRASTRUCTURE
30Aerial Bridge Piura Manaos LEADING LOGISTIC
BIOCEANIC CENTER IN THE SOUTHPACIFIC
ASIA-PACIFICO MARKET 52 DEL PBI MUNDIAL 50 DEL
COMERCIO MUNDIAL 40 DE LA POBLACION MUNDIAL
BRASIL
Piura has a strategically location and the
natural conditions of its ports offer great
opportunities to trade with Austral and South
East Pacific Region and also gives opportunities
to Brazilian producers to access these potential
markets back and forth to reinforce its
Industrial Zone of Manaus.
31- Aeolic Energy
- Required Potential 1,600 MW.
- Project Nor wind in execution present amount of
US 220 million. - Problem referential price to the producer of
aeolic energy. - Hydro electric Energy
- Hydroelectric Centers (HCs) in the Poechos
system Curumuy (10 MW), Poechos I (17.5 MW) y II
(12.5 MW) - HCs in Quiroz Zamba (12 MW),
- Potential HCs.
- Alto Piura (300 MW)
- Vilcazan (24 MW).
ENERGY RESOURCES AND POTENTIALS
32MINING MAP
More than 474 thousand Has in 510 mining claims.
Metallic (copper, molybdenum, gold, etc.) non
metallic (phosphates, diatomite, calcareous,
etc.) fossil fuel and gas.
MINES RIO BLANCO - BAYOVAR
33Resources and potentialities.
- Great mining potential, at the present there are
more than 500 mining claims (metallic and non
metallic) based on an area of more than 474
thousand hectares (hás). - Main mineral resources evaluated.
- Tambogrande Gold 8.18 TM, Silver10.26 million
ounces, Copper 39.3 Million of Tm (metric tons).
Zinc 18.5 Million Tm. - Huancabamba Río Blanco 1,293 Million of Tm of
copper, with a grade of mineral of 0.71 , plus
molybdenum presence of 228 ppm (parts per
million) - Artisanal mining of gold en Suyo, Paimas,
Sapillica, lack of formality and order. - Petroleum 292 millon of barrels of proved
reserves, with prospective reserve which is three
times this volume. - Gas more of 1.3 trillion of cubic feet in
reserve.
MINING RESOURCES AND POTENTIALS
34Mining Problems
- Fast and untidy growth of artisanal mining
(traditional methods) in Piura, causing problems
like - Environmental water contamination and no good
disposal of mining tailings affecting the water
and the crops. - Social conflict between agriculturalists,
farmers and miners causing social unrest in the
place. - Legal lack of interest of being formal
producers. - Technical lack of interest in accepting new
techniques and technology that can be
environmentally friendly options with an evident
benefit.
MINING RESOURCES AND POTENTIALS
35Proyecto Bayóvar Phosphates
BAYOVAR MORO POSITIONS FOR PEOPLE IN PIURA.
More Income and rents for the Regional and Local
Government (Canon) to be invested.
36POTENTIAL OF THE MINING- INDUSTRIAL CENTER OF
BAYOVAR
BAYOVAR CHEMISTRY INDUSTRY
37Longitudinal Axe of the North Sierra (highlands)
Exporting Sierra
- Important Axe for transport integration of
Piura sierra, to help the development of Ayabaca
and Huancabamba provinces, which have a great
biodiversity and adequate climates for exporting
agricultural products, livestock and aquaculture
and particularly food production. - Advances Managing at international level with
the central government as well as strategic
alliances with local governments to build roads
like Canchaque Huancabamba, Montero Ayabaca,
and Morropón Chalaco Pacaipampa. - Investment US 120 million.
38Main Road Connections to export agricultural
products.
- Important costal axe to export agricultural
products. - Important offer of agricultural products (mango,
lime, grape, pepper, sugar cane to produce
ethanol, etc.) and lands for private investors. - Opportunity to build roads and storage
facilities. - This axe allows to integrate Paita Port, with the
productive zones of Morropón Chulucanas
Tambogrande / Km 21 Piura/ Paita - Approximate investment of US 30 million.
39OTHER PROJECTS
- To integrate roads
- Andina road Paving of road surfaces of the road
Buenos Aires Canchaque Huancabamba (130Km.) - Roads in the zone of the regional border (Border
Sullana and Ayabaca) - Road Ayabaca-Andino Central-H uancabamba.
- Project of integration of interprovincial roads
- Road SajinosPaimas Pje. Gde. Montero -
Ayabaca (84 Km. Investment, 29.4 MD). - Road TambograndeChulucanas ( 40 Km, 5 MD)
- Road Sechura-Paita (70Km.,16 MD) -Talara
- Road Morropón-Sto. Domingo- Chalaco - Pacaipampa.
- Projects of provincial integration
Morropón-Chulucanas-Tambogrande- Km 21 Piura.
OTHER REGIONAL PROJECTS
40MANAGEMENT OF RIVER PIURA PROJECT
- Piura river has a basin of more than 1000 MMC.
- An effective and integral use of this resource is
required. There are some advances - Elaborating the profile SNIP of Polders to
regulate and prevent floods in the valley down
river. - Studies of water fronts of Piura city.
- Business opportunities
- Financing and engineering works.
PROJECT MANAGEMENT OF PIURA RIVER
41MACRO REGIONAL INTEGRATION
- Deep compromise started in the year 2003 to
integrate the north region with the east region
of the country. - It has been promoted and strengthen the board
INTERNOR. - Macro regional integration requires integrating
the different interesting projects that have
great impact in the development of the whole
region. - Main projects
- Bi oceanic corridor North Axe IIRSA Nº 6
- Consolidation of building the road Paita -
Yurimaguas - Yurimaguas Port is the next step, and
- Rehabilitation of Iquitos Port and waterways.
- The touristic axe of the north and east Aypate
Kuelap Sipan - Beaches of the North. - The axes agro export, fishing, agro industrial,
green Sierra - The highland longitudinal road (IIRSA Nor Sierra)
- The project Nor forest
REGIONAL INTEGRATION
42Interaction Space of Piura
ECUADOR
Santiago / Campanquiz
Aguas verdes
TUMBES
IQUITOS
Alamor
Saramiriza
Namballe
TALARA
San Ignacio
Sta. María de Nieva
Suyo
Las Lomas
Ayabaca
SULLANA
Tambo Grande
Urakusa
PAITA
Huancabamba
Nueva Cajamarca
Chiriaco
PIURA
Bagua
JAEN
Olmos
RIOJA
Pucará
YURIMAGUAS
Bagua Grande
Pedro Ruíz
Bayóvar
Cutervo
MOYOBAMBA
Mendoza
CHACHAPOYAS
TARAPOTO
Chota
CHICLAYO
Bellavista
Balsas
Bambamarca
Celendín
Saposoa
Chilete
Bolívar
PACASMAYO
JUANJUI
CAJAMARCA
San Marcos
Cajabamba
Otuzco
- Roads CATEGORIES
- . NATIONAL ROADS
- LONGITUDINAL OF THE COAST
- BI OCEANIC CORRIDOR
- LONGITUDINAL OF THE ANDES
- LONGITUDINAL OF THE JUNGLE
- TRANSVERSAL
- . REGIONAL ROADS
- INTEGRATING BORDERS
- NOR CENTRAL
- . COMPLEMENTARY ROADS
- Tarapoto
Yurimaguas - Chiclayo
Cutervo Chota - Chachapoyas
Mendoza Omnia Saposoa Juajui - Huamachuco -
Tayabamba
HUAMACHUCO
TRUJILLO
Santiago de Chuco
Virú
Tocache
Mollepata
Tayabamba
Pallasca
Chao
Cabana
Corongo
CHIMBOTE
Uchiza
Huallanca
HCC/E. LEÓN
43PERSPECTIVES
- International Bidding Drilling the tunnel of
Transvase (interbasin water flow) and Building
South loophole of the project Alto Piura in
November. - Building the Stage III of the Santa Rosa
hospital Tuberculosis, Oncology and Hematology
modules. - Executing the road Chulucanas Tambogrande.
- Bidding of the road Km. 21 Tambogrande
- Viability of the project Waterworks of the
Poechos dam. - Bidding of the Old Bridge in Piura city.
- Improvement of the road Canchaque - Huancabamba.
- Setting up a milking plant for the development
dairy cattle production in Huancabamba. - Promoting
- Component II, III of the Project Hydro energetic
of the Alto Piura, - Waterworks of Poechos dam to store 1,070 MMC,
- Promoting the building of satellite reservoir in
Vilcazan, - Development of public infrastructure projects
roads, sanitation, electricity, health and
education. - Transferring technology particularly about
irrigation. - Organizing producers to be more competitive.
- Development of technical capacities and young
professionals.
PERSPECTIVES
44VISIT PIURA !!! INVEST IN PIURA !!!
THANK YOU VERY MUCH
END