Title: AGS RSVP Weekly Meeting
1AGS RSVP Weekly Meeting2 Dec 2004
- Agenda
- Guidance and Upcoming reviews (Pile)
- Update on AGS/BOOSTER WBS 1.4.1 cost scrubbing
short term spending plan (Brown) - Update on beam development plan (Ahrens)
- Status of resource loaded schedules and short
term spending plan for Switchyard (Pendzick)
- Useful Links
- RSVP Project http//rsvp.bnl.gov
- C-AD AGS Project Office http//server.c-ad.bnl.
gov/esfd/RSVP/RSVP_AGS_WBS.htm
2Preliminary Guidance our plan(subject to
change we have not yet received guidance from
Willis/Kotcher as result of 4-5 Nov AGS Review
no change since 18 Nov meeting)
- Continue cost scrubbing and schedule development
- Highest priority to AGS/BOOSTER WBS 1.4.1
- Cost scrubbing, what can we postpone until
operations phase? etc - Schedule in particular a plan to get the
AGS/BOOSTER in shape for high intensity beam
development --- by beginning of 3rd year of
construction? - Beam development plan that fits within constant
effort RHIC budget scenario with 2 beams i.e.
figure on 80 hrs/week and 15 weeks/year - Case 1 Beam development during entire 5 year
construction period - Case 2 Beam development beginning 3rd year of
construction - The construction plan should be developed
consistent with no beam development in first two
years of the project (Case 2 above) - D-line decommissioned
- C-Line available beginning of 3rd year for tests
- theres a risk (small) that we may have to revert
back to the original plan (Case 1).
3next significant events
Milestone Date Status, Comments
Discussion of Baseline Expectations, Timeline with Experiments September 13 Held
MECO Magnet Review Sun-Tue, Oct 10-12 Held
AGS Review Thu-Fri, Nov 4-5 Held
Internal discussion of resource-loaded schedules (RLS) for all projects Thu, Dec 9 Includes PO, NSF PM, ALD experiments. One full day.
Simulations Backgrounds Review Tue-Thu, Jan 11-13 Set, reviewers assembled, held at NYU
Initial review of RLS for all projects Tue-Thu, Jan 18-20 Reviewed by LOG. Dates TBF.
Reviews of other sub-projects Weeks of Jan 24 Feb 21 Series of LOG-based reviews of RSVP sub-systems
Draft versions of PMP, PEP, Conceptual Design Report completed Mon, Feb 14
Operations Review Week of Mar 7
Project startup pre-review Week of Mar 15 Comprehensive preparatory review of full project, proposal
Project startup review Week of Apr 18 Final project startup review, iteration of above. NSF review.
Finalize documentation for May submission to NSF Week of Apr 25
Product submitted to NSF/NSB Mon, May 2
4RSVP Cost and Schedule Review, 9 Dec 2004
- Goals and expectations of the meeting
- This meeting is intended to provide the
opportunity for an open, frank discussion of the
projects' status and outlook - Status report of what is in place with regard
to project planning for the three projects - The current confidence of the Project Managers
in the estimates they have so far. - Project Managers' plans for how any missing or
incomplete items will be tackled over the coming
months. - Agenda (Orange Room, Physics, attendance by
invitation) - 2 hours each KOPIO (M. Marx), MECO (M.
Hebert) and AGS (P. Pile) - Detailed Guidance http//server.c-ad.bnl.gov/esfd
/RSVP/guidance.pdf
5RSVP Cost and Schedule Review, 9 Dec 2004
6RSVP Cost and Schedule Review, 9 Dec 2004
7RSVP Cost and Schedule Review, 9 Dec 2004
8RSVP Detector Capabilities, Simulations and
Backgrounds Review (11-13 Jan 2005 at NYU)
9RSVP Detector Capabilities, Simulations and
Backgrounds Review(11-13 Jan 2005 at NYU)
10RSVP Detector Capabilities, Simulations and
Backgrounds Review (11-13 Jan 2005 at NYU)
- RSVP Simulation and Background Review Committee
- Ed Blucher, University of Chicago
- Martin Cooper, Los Alamos
- Cy Hoffman, Los Alamos
- Patty McBride, Fermilab
- Jack Ritchie (Chair), University of Texas, Austin
- Mike Shupe, University of Arizona
- Bob Tschirhart, Fermilab
- Koji Yoshimura, Osaka University
- Charge and Agenda
- http//server.c-ad.bnl.gov/esfd/RSVP/RSVP_Simulati
ons_ChargeAgenda_.pdf
11Next Meeting