Title: AGS RSVP Weekly Meeting


1
AGS RSVP Weekly Meeting14 Apr 2005
  • Agenda
  • Project Office - Guidance etc.. (pile)
  • Significant differences, frozen project files vs
    present
  • Brown, Pendzick, Pearson, Phillips, Gassner
  • Other
  • Useful Links
  • RSVP Project http//rsvp.bnl.gov
  • C-AD AGS Project Office http//www.c-ad.bnl.gov
    /esfd/RSVP/RSVP_AGS_WBS.htm

2
Chucks Observations
3
Chucks Observations
4
Preparations for Next Week (1/3) Kotcher
Guidance (edited)
  • We have frozen the schedules for next week.
  • The PMs are putting together responses in
    writing to the recommendations of the Preliminary
    Baseline Committee. We will post these on the
    web site, along with the report itself. DONE
  • All material for the committee including
    presentations (using new template) needs to be
    finalized, and posted, by COB eastern this
    Friday, 4/15 -- Send electronic version to Elaine
    and Steve Kane. No paper copies required.
  • Bear in mind that people will be held to the
    allotted times for their talks next week. Please
    review/revise your talks with this in mind.

5
Preparations for Next Week (2/3) Kotcher
Guidance
  • Need a head (FTEs and bodies) count of
    anticipated manpower, in FTEs, on October 1
    2005, in ten different categories
  • Technicians
  • Engineers
  • Physicists, broken into senior physicist,
    post-doc, and student
  • Please keep track of this for BNL and university
    personnel separately. This will make ten
    categories.
  • I will set up VRVS for the plenary session (Wed
    AM), the question and answer session (Fri AM),
    and the closeout (Fri afternoon). If any of the
    groups wants additional phone or computer
    connections at any of the sessions, theyll have
    to make their own plans. Contact Steve Kane if
    you need help setting something up.
  • We will continue to attempt to present a full set
    of PMPs for next week. Alex, or I, will be in
    touch with you individually about that.

6
Preparations for Next Week (3/3) Kotcher
Guidance (edited)
  • Stan asked for a 30' introduction to their
    projects by each of the Project Managers at the
    breakouts after lunch.leave the L3 talks,
    (replace the templates, etc., of course), I will
    post and let him know their available, and the
    chairs of the breakouts may want to hear them.

7
WBS 1.4 work in 1st quarter FY06
  • Booster and AGS coil procurement
  • Booster loss monitor design
  • Booster Controls instrumentation interfaces and
    software development
  • AGS H20 design
  • MECO AC Dipole, PS, stripline kickers design,high
    level RF and beam simulations
  • K0PI0 25 MHz cavity CFI support
  • Switchyard, K0PI0 and MECO final beam design,
    layout, magnets and power supplies refurbishment
  • Switchyard beam plug procurement
  • MECO beam line security system

8
(No Transcript)
9
10 of C-AD work-force
42 heads

10
Management Contingency Reminder still alive
11
Reviewers
12
Charge (with some omissions)
13
(No Transcript)
14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17

No guidance on these talks --be prepared!
18
(No Transcript)
19
(No Transcript)