Cost reduction exercise second pass (Mahler,Pendzick,Pearson,Phillips) Status of cost scrubbing and RLS's (Mahler/Lambiase,Pendzick,Pearson,Phillips) ... – PowerPoint PPT presentation

Number of Views:43
Avg rating:3.0/5.0
Slides: 9
Provided by: cad53
Learn more at: https://www.c-ad.bnl.gov
Category:
Tags: ags | rsvp | mahler | meeting | weekly

less

Transcript and Presenter's Notes

Title: AGS RSVP Weekly Meeting


1
AGS RSVP Weekly Meeting3 Feb 2005
  • Agenda
  • Cost reduction exercise second pass
    (Mahler,Pendzick,Pearson,Phillips)
  • Status of cost scrubbing and RLSs
    (Mahler/Lambiase,Pendzick,Pearson,Phillips)
  • Useful Links
  • RSVP Project http//rsvp.bnl.gov
  • C-AD AGS Project Office http//www.c-ad.bnl.gov
    /esfd/RSVP/RSVP_AGS_WBS.htm

2
RSVP Project Office Present Guidance (no
change from last week)
  • All projects have been asked to design to cost,
    according to the following guidelines (burdened
    FY05)
  • KOPIO - 55M
  • MECO magnet - 56M
  • MECO - 24M
  • AGS - 40M
  • Project Office - 20M
  • These numbers include contingency, which should
    be constructed according to the Lockheed
    guidelines as posted on the RSVP web site.
  • The Project Office will make any needed
    adjustments in the overall contingency.
  • The RSVP Project Office is assembling an April
    Baseline Review.
  • The usual backup material - cost books, C/TDR's,
    etc. - will be needed to review.
  • Project costs will have to be reported in
    escalated dollars

3
RSVP Project Office Present Guidance (no
change from last week)
  • The RSVP Project Office is assembling an April
    Baseline Review.
  • A preview in early April
  • Formal baseline review in late April
  • The usual backup material - cost books, C/TDR's,
    etc. - will be needed to review.
  • Project costs will have to be reported in
    escalated dollars

4
How we get to base line in April
  • Cost Scrubbing complete 17 Feb
  • All subsystem resource loaded schedules complete,
    based of results of present cost-cutting effort
    and cost scrubbing by 23 Feb
  • ( and Excel Spread Sheets Updated)
  • Master Resource Loaded Schedule
  • First pass at how WBS 1.4 work is spread over 5
    years (what gets done, when and cost per year,
    rough estimate of personnel requirements) by 16
    Feb experiments are expected to give us their
    input at this point
  • Second pass at master schedule, modified as per
    guidance from RSVP Project Office and experiments
    due 2 March

5
How we get to base line in April
  • Cost Books must be assembled deadline, 9 March
  • AGS/Booster (Brown)
  • Mechanical (Mahler)
  • Electrical (Lambiase)
  • MECO AGS Modifications (Brown)
  • K0PI0 AGS Modifications (Brown)
  • Switchyard (Pendzick)
  • K0PI0 (Pearson)
  • MECO (Phillips)
  • Common to all WBS elements
  • Controls (Barton)
  • Security (Williams)
  • Instrumentation (Gassner)

6
How we get to base line in April
  • TDR (Pile, editor)
  • AGS/Booster and Switchyard (Brown)
  • K0PI0 (Lazarus)
  • MECO (Brown beam line/Meng all else)
  • First Drafts (Word ox simple text) to me by 23
    March

7
RSVP Project Office New Guidance (cont)
  • In light of this priority, the coming review
    schedule according to the Sep timeline will be
    changed in order to allow time for you to put all
    of this together.
  • In particular, we will not have the reviews of
    the individual sub- projects via the ad hoc LOG
    committees.
  • An updated review schedule will be ready in a few
    days
  • you should be entirely focused on constructing a
    "baselineable" project plan
  • To the very greatest extent possible, project
    personnel should drop everything during this
    intensive period

8
Misc
  • RSVP Project Office Account Number 88542
  • The K0PI0 funds have arrived, accounts were setup
    and then closed continue to use above account -
    88542