Lezioni di elettrotecnica

1 / 60
About This Presentation
Title:

Lezioni di elettrotecnica

Description:

Planning of the energy saving and efficiency interventions and of the use of ... Asili nido. Schools. Ut. termiche. Ut. elettriche. Tipologia utenza ... – PowerPoint PPT presentation

Number of Views:92
Avg rating:3.0/5.0
Slides: 61
Provided by: mfa67

less

Transcript and Presenter's Notes

Title: Lezioni di elettrotecnica


1
Assessorato allAmbienteComune di Padova
  • Planning of the energy saving and efficiency
    interventions and of the use of renewable energy
    resources for the municipal administration of
    Padua

2
Introduction Supply Contracts Public
lighting Traffic lights Buildings Transport
Renewables
  • General analysis of the dimensions and
    inefficiencies of the electrical and thermal
    consumption of the municipal administration of
    Padua
  • Proposals regarding efficiency interventions,
    energy saving and renewables
  • Evaluation of the economic expenses and of the
    environmental advantages
  • Articulation of the study into 5 main
    intervention sectors
  • public lighting
  • traffic lights
  • buildings
  • transport
  • renewable energy resources

3
Introduction Supply Contracts Public
lighting Traffic lights Buildings Transport
Renewables
  • Methodological approach of the problem
  • Analysis of the actual state
  • Elaboration of efficiency and consumption
    indicators
  • Preliminary definition of the interventions
  • Estimate of the cost and return time of the
    investments
  • Evaluation of the economic expenses and of
    environmental advantages

4
Introduction Supply Contracts Public
lighting Traffic lights Buildings Transport
Renewables
  • Energy and money saving is based on the
    improvement of 3 distinct elements
  • Supply contract
  • Quality of the plants (and of the structures)
  • Management system(and maintainance)

Qualityof the plants (environmental advantages)
High
Poor
Excellent
Absent
Very bad
Management system (environmental advantages)
Supply contract
Good
5
Introduction Supply Contracts Public
lighting Traffic lights Buildings Transport
Renewables
  • Electrical and thermal consumption (excluding
    public lighting)

6
Introduction Supply Contracts Public
lighting Traffic lights Buildings Transport
Renewables
  • Dimensions and costs of the electricityconsumptio
    n for the various sectors (excluding public
    lighting)

7
Introduction Supply Contracts Public
lighting Traffic lights Buildings Transport
Renewables
  • Electrical energy cost distribution
  • Electricity consumption distribution

8
Introduction Supply Contracts Public
lighting Traffic lights Buildings Transport
Renewables
  • Distribution of the electricity consumption for
    schools
  • Distribution of the electricity consumption for
    cultural services

9
Introduction Supply Contracts Public
lighting Traffic lights Buildings Transport
Renewables
  • Supply contracts

Quality of the plants (Environmental advantages)
SystemManagement(Environmental advantages)
Very bad
Supply contracts
Good
10
Introduction Supply Contracts Public
lighting Traffic lights Buildings Transport
Renewables
Quality of the plants
systemManagement
Very bad
  • Average purchase prices of electrical energy on
    the fixed market per consumption category

Supply contract
Good
11
Introduction Supply Contracts Public
lighting Traffic lights Buildings Transport
Renewables
Quality of the plants
systemManagement
Very bad
  • Average purchase prices of electrical energy on
    the free market

Supply contract
Good
12
Introduction Supply Contracts Public
lighting Traffic lights Buildings Transport
Renewables
  • Improvement of the energy supply contract for 21
    consumption categories (6 new ones)

Quality of the plants
systemManagement
Very bad
Supply contract
Good
13
Introduction Supply Contracts Public
lighting Traffic lights Buildings Transport
Renewables
Negotiable part of the final price
1. ENERGY
2. PERDITE
3. DISPACCIAMENTO
4. TRASPORTO
5. MAGGIORAZIONI
6. IMPOSTE (dipendono dalle disposizioni
fiscaliin essere e dal regime fiscale del punto
di prelievo)
14
Introduction Supply Contracts Public
lighting Traffic lights Buildings Transport
Renewables
  • Annual consumption of electrical energy of about
    8.500.000 kWh (8,5 GWh)
  • Annual contract, renewable for 3 years, with the
    possibility to add new users at the same contract
    conditions
  • Discount of 6,6 with respect to the fixed market
    for both LV and MV users (on the negotiable part
    of the energy price)
  • Saving over 40.000 /anno

Quality of the plants
systemManagement
Very bad
Supply contract
Good
15
Introduction Supply Contracts Public
lighting Traffic lights Buildings Transport
Renewables
  • Public lighting

Qualityof the plants
High
Poor
Excellent
Absent
Supplycontract
Management System
16
Introduction Supply Contracts Public
lighting Traffic lights Buildings Transport
Renewables
  • Actual state of the plants

High
Quality of the plants
Poor
systemManagement
Supplycontract
17
Introduction Supply Contracts Public
lighting Traffic lights Buildings Transport
Renewables
  • Light sources

High
Qualitàdegliimpianti
Poor
systemManagement
Supplycontract
18
Introduction Supply Contracts Public
lighting Traffic lights Buildings Transport
Renewables
  • Intervention strategy in two separate and
    consecutive phases
  • First phase
  • sostituzione dei 9.800 apparecchi illuminanti
    obsoleti (gonnella) e delle relative lampade a
    bassa efficienza
  • sostituzione delle restanti 6.007 lampade a bassa
    efficienza delle lampade ad alta efficienza
  • mantenimento degli impianti in serie con
    sostituzione dei trasformatori a bobina mobile
    con regolatori statici elettronici
  • installazione di regolatori di flusso negli
    impianti in derivazione, ove possibile
  • progressiva messa a norma dei quadri elettrici di
    alimentazione e mantenimento temporaneo di tutte
    le altre parti impiantistiche esistenti
    (sostegni, alimentazioni, quadri, ecc..)

High
Qualityof the plants
Poor
systemManagement
Supplycontract
19
Introduction Supply Contracts Public
lighting Traffic lights Buildings Transport
Renewables
  • Second phase
  • riprogettazione e razionalizzazione delle
    restanti parti di impianto con le risorse
    economiche liberate dagli interventi della prima
    fase
  • ulteriore messa a norma dei quadri elettrici
  • identificazione e destinazione di parti di
    impianto per la sperimentazione di nuove
    tecnologie di lampade, di apparecchiature per la
    variazione del flusso luminoso e di sistemi di
    telecontrollo
  • raggruppamento delle utenze specie in prossimità
    dei quadri alimentati in media tensione
  • informatizzazione dei dati di impianto ai fini
    dellottimizzazione della gestione della
    manutenzione
  • identificazione cartografica dei punti luce

High
Quality of the plants
Poor
Excellent
Absent
systemManagement
Supplycontract
20
Introduction Supply Contracts Public
lighting Traffic lights Buildings Transport
Renewables
High
Qualityof the plants
Poor
systemManagement
Supplycontract
21
Introduction Supply Contracts Public
lighting Traffic lights Buildings Transport
Renewables
  • Impianti di illuminazione a corrente costante (in
    serie)

High
Qualitàdegliimpianti
Poor
systemManagement
Supplycontract
22
Introduction Supply Contracts Public
lighting Traffic lights Buildings Transport
Renewables
  • Impianti di illuminazione a corrente costante (in
    serie)
  • Sostituzione dei trasformatori a bobina mobile
    per gli impianti in serie con gli alimentatori
    statici
  • 30 alimentatori statici da 30 kVA (di cui 2 di
    riserva), con cos f medio di funzionamento pari a
    0,95 al posto degli 88 trasformatori da 15 kVA
    (di cui 10 di riserva)
  • Ulteriore risparmio di energia elettrica pari
    all8,5 del consumo con lampade ad alta
    efficienza (2.765.000 kWh)

High
Qualitàdegliimpianti
Poor
systemManagement
Supplycontract
23
Introduction Supply Contracts Public
lighting Traffic lights Buildings Transport
Renewables
  • Impianti di illuminazione a tensione costante (in
    derivazione)
  • Installazione di riduttori di flusso
  • 82 riduttori di flusso attualmente funzionanti su
    un totale di 410 quadri elettrici
  • Si ipotizza linstallazione di almeno altri 100
    riduttori di flusso luminoso in altrettanti
    quadri elettrici
  • Ulteriore risparmio di energia elettrica del 5
    della totale energia in derivazione (si considera
    solo una parte dellimpianto di illuminazione per
    il 50 del tempo di accensione)

High
Qualitàdegliimpianti
Poor
systemManagement
Supplycontract
24
Introduction Supply Contracts Public
lighting Traffic lights Buildings Transport
Renewables
  • Cost/benefit estimate

High
Qualityof the plants
Poor
systemManagement
Supplycontract
25
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
  • Traffic lights

Quality of the plants
High
Poor
systemManagement
Supplycontract
26
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
  • Mobility and traffic sector
  • Electrical consumption distribution

High
Qualitàdegliimpianti
Poor
systemManagement
Supplycontract
27
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
  • Actual state of the traffic light system

High
Quality of the plants
Poor
systemManagement
Supplycontract
28
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
  • Replacement with LED lamps of only the lamps with
    diameter 300 mm (100 W)

29
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
  • Cost/benefit estimate

High
Quality of the plants
Poor
systemManagement
Supplycontract
30
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
  • Buildings

Quality of the plants
High
Poor
Excellent
Absent
Very bad
System management
Supply contract
Good
31
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
  • Subdivision and distinct analysis of electrical
    and thermal energy (prevailing part)
  • Estimate of the efficiency degree by confronting
    specific consumption with reference values
    according to the sector with a homogeneous user
    destination
  • Intervention possibility
  • plant and structures quality
  • consumption management
  • supply contracts

Quality of the plants
Supply contract
Management system
32
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
Electricity consumption
  • Average statistical reference values

Quality of the plants
Supply contract
Management system
33
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
Electricity consumption
  • Completed analysis for
  • School services
  • Asili nido
  • Scuole materne
  • Scuole elementari
  • Scuole medie
  • Sport facilities
  • Palestre
  • Campi sportivi

Quality of the plants
Supply contract
Management system
34
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
Electricity Consumption
Quality of the plants
  • School services

Supply contract
Management system
35
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
Consumi elettrici
  • Asili nido

36
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
Consumi elettrici
  • Scuole materne

37
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
Consumi elettrici
  • Scuole elementari

38
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
Consumi elettrici
  • Scuole medie

39
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
Electricity consumption
Qualityof the plants
  • Sport facilities

Supply contract
Management system
40
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
Consumi elettrici
  • Palestre

41
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
Consumi elettrici
  • Campi sportivi

42
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
Thermal consumption
  • Classification of the thermal efficiency of the
    buildings based on a confrontation between a
    thermal limit and a consumption indicator

Qualityof the plants
Supply contract
Management system
43
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
Consumi termici
  • Asili nido

44
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
Consumi termici
  • Scuole materne

45
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
Consumi termici
  • Scuole elementari

46
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
Consumi termici
  • Scuole medie

47
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
Consumi termici
  • Campi sportivi

48
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
Consumi termici
  • Palestre

49
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
Thermal consumption
  • Transformation of the fuel boilers in methane
    boilersEnvironment benefits

Qualityof the plants
systemManagement
Supply contract
50
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
Thermal consumption
  • Transformation of the fuel boilers in methane
    boilersEnvironment benefits

Quality of the plants
systemManagement
Supply contract
51
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
  • Transport

Qualityof the plants
High
Poor
SystemManagement
Supply contract
52
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
  • Incidence percentage of transport on polluting
    emissions

High
Qualityof the plants
Poor
Excellent
Absent
Management system
Supply contract
53
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
  • Distribution of the motor vehicles according to
    typology

High
Qualityof the plants
Poor
Excellent
Absent
Management system
Supply contract
54
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
  • Distribution of the motor vehicles according to
    sector

High
Qualityof the plants
Poor
Excellent
Absent
Management system
Supply contract
55
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
  • Distribution of motor vehicles according to
    alimentation type

High
Qualityof the plants
Poor
Excellent
Absent
Management system
Supply contract
56
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
  • Distribution of the motor vehicles according to
    registration year

High
Qualityof the plants
Poor
Excellent
Absent
Management system
Supply contract
57
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
  • Distribution of total expenses in the year 2004

High
Quality of the plants
Poor
Excellent
Absent
Management system
Supply contract
58
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
  • Distribution of fuel expenses in the year 2004

High
Quality of the plants
Poor
Excellent
Absent
Management system
Supply contract
59
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
  • Statistical use of cars and lorries

High
Quality of the plants
Poor
Excellent
Absent
Management system
Supply contract
60
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
  • Average values of the main polluting emissions

High
  • Average distance per 10 of fuel

Quality of the plants
Poor
Excellent
Absent
Management system
Supply contract
61
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
  • Comparison between petrol and methane combustion
    costs (estimated cost for methane plant
    installation 2000 )

High
Quality of the plants
Poor
Excellent
Absent
Management system
Supply contract
62
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
  • The replacement/transformation of 20 motor
    vehicles running on petrol with bifuel vehicles
    (40 of the municipal vehicles with an average
    annual of15.000 km)brings on a saving of
    18.000-20.000 /yearon the fuel expenses with an
    investment of 40.000 and a return time of about
    2 years

High
Quality of the plants
Poor
Excellent
Absent
Management system
Supply contract
63
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
  • Renewables

Quality of the plants
High
Poor
Excellent
Absent
Very bad
Management system
Supply contract
Good
64
Introduction Supply Contracts Public
lighting Traffic lights Buildings
Transport Renewables
  • Introduction, where possible, of solar panel to
    produce hot water
  • Opening of an energy efficiency and renewables
    counter
  • Electrical energy production from photovoltaic
    panels covering municipal parkings

65
Conclusion
  • All sectors have the possibility to introduce
    interventions for economic and environmental
    benefits

66
Conclusioni
  • Further activities and initiatives
  • Water cycle analyses
  • Revision of the management and maintainance
    contract of public lighting
  • Revision of the heat management contract
  • Behaviour rules (ethical)
  • Per informazioni
  • Ufficio Agenda21
  • 049-802.24.88
  • padova21_at_comune.padova.it