L2 CAL Status - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

L2 CAL Status

Description:

Change the jet clustering so that we can control the rates at ... Preparing the celebrations (parties, happy hours, etc...) myself. L2 CAL status. 9. The status ... – PowerPoint PPT presentation

Number of Views:38
Avg rating:3.0/5.0
Slides: 13
Provided by: vadim
Category:
Tags: cal | status

less

Transcript and Presenter's Notes

Title: L2 CAL Status


1
L2 CAL Status
Vadim Rusu
For the magnificent L2CAL team
2
The goal
  • Improve the L2 MET resolution so that we can run
    at lower MET at L2
  • L1 only uses 8/10 bits
  • No L2 calculation in the current system
  • Change the jet clustering so that we can control
    the rates at high luminosity
  • Current L2 clustering pacman style

MET2 JETS
JET40
3
The design
Muon/XTRP/L1/SVT/XCES
Global L2 Decision
  • Add new hardware to send the towers straight to
    the L2 PC
  • Get new PC for better performance (about time
    anyway)
  • Everything to be commissioned parasitically

8-bits
10-bits Energy/Tower
Calorimeter
4
The project
  • An international mini-collaboration
  • Fermilab
  • Chicago
  • Madrid
  • Padova
  • Penn
  • Pisa
  • Purdue
  • Started Oct 2006
  • Completed - ASAP

5
The know-how
  • Use PULSARs as receivers for the LVDS data from
    DIRAC
  • Need to interface the 40 bit cables with the
    PULSAR
  • Build Mezzanine card
  • Serialize the data in Slink format
  • Receive on PC through Slink-PCI boards

6 slink outputs
96 LVDS cables
80 MhZ
96 LVDS cables
Slink merger Pulsars (8)
32-bit _at_ 40 MhZ
6 slink outputs
32-bit _at_ 40 Mhz
80 MhZ
80 MhZ
40-bit word/cable _at_ CDF_clk (132 ns)
6 slink outputs
Clustering timing 10 us
80 MhZ
Data transfer latency on average within 10 us
6
The tool
  • L2 CAL mezzanine card

10bits x4 40 _at_ cdfclk (132ns)
input data per cable
Pulsar side
LVDS Connector
40
JTAG
160
CMC Connectors to the pulsar

Pulsar front panel
7
The tool
  • Built at UC in record time
  • Thanks Henry and e-shop
  • Tested and commissioned revision 1.0 over the
    holidays
  • Worked out of the box

Ted makes good for the bet he lost.
8
The pieces
  • Mezzanine design
  • Laura
  • Testing/Checkout
  • Lucas, Miguel
  • Firmware
  • Marco, Laura
  • FER code
  • Massimo, Laura
  • Simulation package
  • Simone D., Gene F.
  • Monitoring
  • Giorgio Simone P., Michael Wojtek/Carla
    consulting
  • PC infrastructure and algo
  • Gene Kristian Hahn consultant
  • PC interface
  • Anadi
  • Preparing the celebrations (parties, happy hours,
    etc)
  • myself

9
The status
  • Boards arrive over the month of February
  • Mezzanine, Slink, AUX (Henry UC)
  • Front panels and strain relief (Richard UC)
  • Pulsars (Paola Pisa)
  • Cables 80 in hand
  • Cable map (thanks JDL)
  • Software final testings
  • Firmware stage 1 ready to go

10
The plan
  • Start splitting the cables one DCAS crate at a
    time starting next week
  • Have half the DCAS system split and parasitically
    running by the end of February
  • March have all system running parasitically
  • April new trigger tables
  • May Project completed
  • 10 bit MET resolution
  • New Jet algorithm (cone based)

11
The future
  • The L2 CAL trigger will be a very versatile
    system
  • What the new L2CAL will provide
  • 10 bit MET at L2
  • Better L2 jet position
  • L2 jet closer to offline jets
  • What else?
  • Angular correlations (jets, MET)
  • Track jet matching
  • Dijet mass
  • New paradigm Your offline analysis code can be
    implemented in the trigger
  • Use the L2 CAL simulation to do studies that will
    improve the trigger selection
  • Already starting on this in the context of HTTF

12
THE END
Write a Comment
User Comments (0)
About PowerShow.com