Title: Undulator Assembly Procedure
1Undulator Assembly Procedure
- LCLS Review
- 11/15/04
- Mark Erdmann
2Assembly Plan
- LCLS will provide strongbacks, poles, and sorted
magnets to assembly vendor - Assembly vendor will fabricate remaining parts
- Assembly will be according to LCLS procedure
3Assembly Procedure
- Closely follows experience of prototype assembly
- Improved and simplified by value added
engineering changes - Poles with a more basic design but tighter
tolerances - Pole sorting not required
- One piece base plate versus 3 pieces
- Assembly can easily be performed by mechanical
shop without previous undulator or permanent
magnet experience
4Step 1 Check 10 of incoming poles to verify
they meet the height specification.
5Step 2 Attach 1st pole assembly fixture to the
magnet / pole base plate.
6Step 3 Install poles onto the base plate,
starting on the upstream side.
7Step 4 Attach 2nd pole assembly fixture and
continue installing poles until entire magnetic
structure is full.
8Step 5 Obtain magnetic field data from
manufacturer and sort magnets. Manually install
magnets and clamps.
9Step 6 Assemble the top and bottom magnetic
structures using the assembly fixture.
10Conclusions
- This assembly procedure has been proven to work
on the prototype LCLS undulator. - Manual insertion of permanent magnets is a safe
and reliable method of assembly. - Method can easily be transferred to industry for
large quantity assemblies.