Status and plans for the ILC cryomodule design - PowerPoint PPT Presentation

1 / 38
About This Presentation
Title:

Status and plans for the ILC cryomodule design

Description:

... November 13 - 15, 2004 at KEK. http://tesla-new.desy.de/content/index_eng.html ... line connects to two-phase line via JT valve once per 'string' (~12 modules) ... – PowerPoint PPT presentation

Number of Views:169
Avg rating:3.0/5.0
Slides: 39
Provided by: ThomasP86
Category:

less

Transcript and Presenter's Notes

Title: Status and plans for the ILC cryomodule design


1
Status and plans for the ILC cryomodule design
  • Tom Peterson, Fermilab
  • TESLA Technology Collaboration Meeting
  • Frascati, 6 December 2005

2
TTF cryomodule is our reference
3
TESLA-style module information . . .
  • http//ilc.desy.de/e627/e634/e730/e745/index_eng.h
    tml
  • Links to talks presented by Lutz Lilje, Axel
    Matheisen, W.-D. Mueller, Bernd Petersen, Nick
    Walker, and others at our December 6 - 7, 2004,
    module meeting at DESY
  • http//lcdev.kek.jp/ILCWS/
  • First ILC workshop, November 13 - 15, 2004 at
    KEK
  • http//tesla-new.desy.de/content/index_eng.html
  • DESY TESLA page with link to the TESLA Design
    Report and other information including talks and
    posters from the March 2004 ITRP visit

4
Sources of Information
  • Bernd Petersen, Lutz Lilje, Axel Matheisen, Nick
    Walker, Hans Weise, and others (DESY)
  • Carlo Pagani (INFN)
  • Terry Garvey (LAL-Orsay)
  • Tom Nicol (Fermilab)
  • Don Mitchell (Fermilab)
  • John Weisend (SLAC)
  • TESLA TDR (March 2001)
  • And others!

5
Some History of Changes in Design Features for
TTF Cryomodule
  • Three generations of TTF cryomodule designs
  • TTF-I was module 1
  • TTF-II was modules 2 and 3
  • TTF-III is modules 4 - 8
  • TDR called for some significant changes from all
    of the above such as a longer module with 12
    cavities per module
  • Next -- TTF III is our baseline design
  • X-FEL modules will differ in some details from
    TTF type III
  • ILC modules will begin as a few type III
    prototypes, which are essentially type III with
    the quad at 2 K and supported like a cavity
  • Planning has begun for the next generation ILC
    module design, type IV, based on the type III
    design

6
(No Transcript)
7
Features of type III cryomodule
  • Allows for fixed couplers
  • Invar rod and roller bearings allow cavities to
    remain axially fixed while the 300 mm tube
    shrinks
  • Smaller cross section results in standard pipe
    size for outer vessel
  • Axial position of last support changed to stiffen
    structure near quadrupole

8
Cryomodule III model -- helium vessels in the
vacuum vessel
CAD model based on DESY design imported and
modified by Don Mitchell, Fermilab
9
Cryomodule III model -- helium vessels in the
vacuum vessel with input couplers and quadrupole
CAD model based on DESY design imported and
modified by Don Mitchell, Fermilab
10
We have a general consensus regarding what needs
changing
  • Based largely on TTF experience, but also Jlab
    and others
  • Consensus collected by working groups at
    meetings, including but not limited to
  • SLAC (14 - 16 Oct 2004)
  • KEK (13 - 15 Nov 2004)
  • DESY (6 - 8 Dec 2004)
  • Snowmass (August 2005)
  • SMTF collaboration meeting (5 - 7 Oct 2005)

11
Type IV cryomodule will include the following
features from Type III
  • 8 cavities per module
  • Same cooling scheme and cryogenic system concept
  • Same vacuum vessel diameter and 300 mm pipe
    diameter
  • Nearly the same pipe locations and arrangement
  • Same cavity centerline location relative to
    vacuum vessel
  • Same support posts
  • Same thermal shields concept, although coupler
    port locations move
  • Same cavity support detail (300 mm header as
    structural backbone with cavities held by roller
    bearings and invar rods)
  • Same input coupler (at least in terms of mounting
    and interface to vacuum vessel, cavity, and
    thermal shields)

12
Helium vessel supports
13
Support posts
14
Thermal shield installation
15
(No Transcript)
16
ILC cryogenic system overview
  • Saturated He II cooled cavities _at_ 2 K
  • Helium gas thermal shield _at_ 5 - 8 K
  • Helium gas thermal shield _at_ 40 - 80 K
  • Two-phase line (liquid helium supply and
    concurrent vapor return) connects to each helium
    vessel
  • Two-phase line connects to gas return once per
    module
  • A small diameter warm-up/cool-down line connects
    the bottoms of the He vessels (primarily for
    warm-up)
  • Subcooled helium supply line connects to
    two-phase line via JT valve once per string
    (12 modules)

17
TESLA cryogenic unit
18
(No Transcript)
19
Type IV cryomodule will differ from type III in
the following general areas
  • Cavity iris-to-iris spacing reduced to 283 mm
  • Reduces length from 12.20 to about 11.8 m, get
    0.75 packing
  • Slow tuner modified to allow closer
    cavity-to-cavity spacing (could mean switching to
    blade tuner design, but choice still open)
  • Fast tuner -- new design
  • Quad/corrector/BPM package under center post,
    hung from 300 mm tube, not on rollers (diverging
    from X-FEL)
  • Two major module types, one with quad and one
    without

20
More differences of Type IV cryomodule from type
III
  • Interconnect features modified to accommodate
    input coupler at end of cryostat
  • Quad current leads may be new and different, with
    local impact on thermal shields and vacuum vessel
    ports
  • Provisions for quad power lead connection at
    center of module
  • Some pipe sizes will be increased for lower
    pressure drops with high flow rates -- would like
    to retain long cryogenic unit lengths up to limit
    of 300 mm pipe and cryo plants. Present effort
    includes re-analysis of heat loads, flow rates,
    and cryogenic system thermal process.

21
(No Transcript)
22
Cavity Interconnect
23
Module predicted heat loads
24
ILC cryogenic system much larger than TESLA 500
  • 8 cryogenic plant locations
  • Approximately 5 km spacing
  • Each location with 2 cryogenic plants of about
    the maximum size -- each plant equivalent to
    about 24 kW at 4.5 K
  • Each plant about 6 MW wall plug power
  • ILC cryogenics about 100 MW total

25
Module pipe sizes increase
26
(Increase diameter beyond X-FEL)
(Increase diameter beyond X-FEL)
(Review 2-phase pipe size and effect of slope)
27
Some critical open design issues
  • Quad/corrector/BPM package is a major unknown
    right now and goes into the heart of the module
  • Tuner details, slow and fast, but especially fast
    tuner
  • Vibrational analysis, which will be compared to
    measurements for verification of the model for
    future design work
  • Development of module and module component test
    plans
  • Verification of cavity positional stability with
    thermal cycles
  • Design of test instrumentation for the module
  • Robustness for shipping, analysis of shipping
    restraints and loads, shipping specifications
  • Active quad movers(?) A complication

28
(No Transcript)
29
(No Transcript)
30
Blade tuner concept
31
(No Transcript)
32
Other open design issues
  • Design for manufacturability, ease of assembly,
    and cost reduction are always considerations
  • Part of the type IV design effort will also be a
    consideration of other options
  • particularly with respect to quad location and
    support
  • but also perhaps with respect to tuners and/or
    other features
  • level of effort on these options will be dictated
    by our manpower and schedule.

33
Organization of effort
  • An international effort
  • Need division of tasks to make best use of our
    resources
  • Minimize duplication of efforts
  • Take advantage of ideas and expertise
  • Pursue options with parallel efforts
  • Each institution has limited resources
  • Work has begun
  • Fermilab has organized a group to do type IV
    design, other labs have also expressed interest
    and/or begun

34
Type IV probable schedule
  • Design module -- 12 - 24 months (2006 - 2007)
  • Magnet/BPM package
  • Tuners, etc.
  • Integrate into module design
  • Build and test -- 12 - 18 months (2007 - 2008)
  • In addition to module, need module test stand and
    test facility!
  • Total 2 to 3 1/2 years, depending on scope of
    work and availability of resources.

35
X-FEL Modules
  • 100 modules will be industrially produced
  • Brings us to the level of manufacturing
    quantities
  • Some differences from ILC, but much of module
    design and manufacturing is the same
  • Cavity supports, thermal shields, MLI, vacuum
    vessel assembly, internal piping, etc.
  • X-FEL experience will be important and valuable
    part of ILC module development
  • X-FEL module effort will stay ahead of ILC effort
  • Remain in close contact and take advantage of
    similar designs, experience, and industrial input
    to design

36
After Type IV--gt increasing quantities
  • Experience with large quantities of SC magnets
    follows an old engineering rule (factors of 10)
  • 1 prototype
  • 10 pre-production prototypes
  • 100 first production run (X-FEL!)
  • Not throw-aways but slower production, still
    making adjustments, relatively large fraction of
    reject/rework
  • 1000 full production run
  • There are design changes and manufacturing method
    changes at each stage

37
Industrialization, impact on design
  • As we move to production of quantities of modules
    in industry, the design will continue to change
  • Reduction of required labor
  • Less costly materials
  • Less costly manufacturing of components
  • Design for more efficient assembly

38
Type IV is not the (final) ILC design
  • Test results of types III and IV will teach us a
    lot
  • There will be some choices beyond type IV from
    parallel development efforts
  • Industrialization will have a significant impact
    on the design
  • Type IV is the next step in module design for ILC