Title: Grupowa Oczyszczalnia Sciek
1Grupowa Oczyszczalnia Scieków Lódzkiej
Aglomeracji Miejskiej
Practical aspects of compliance with the
Integrated Permit requirements based on the
example of District Waste Water Treatment Plant
of Lódz Conurbation
Fot U. Czapla
2Background
- The integrated permit system was imposed in the
European Union by way of Council Directive
96/61/EC of 24 September 1996 concerning
integrated pollution prevention and control
(IPPC). - Integrated Permit. it is an administrative
decision granting authorisation to operate an
installation subject to certain conditions that
guarantee that the installation complies with the
requirements established for all environmental
elements and with the best available technique
(BAT), which determines the types and volumes of
the raw materials, energy and fuels to be used
3Objectives and requirements of the Integrated
Permit System
- Considerable and systematic improvement of
environment in the European Union - Prevention and further reduction of the
pollutant emissions into the environment - Operation of the installations will the possibly
lowest impact on the environment as a whole - Continuous improvement of the techniques intended
to prevent pollution - Development, implementation and constant
improvement of the environment management systems
in the industrial plants - New methods of cooperation with environment
protection authorities
4Integrated permits for LC DWWTP
- DWWTP waste dump -Lagoons treatment and
recovery of non-hazardous and neutral waste
(storage) - validity 31.01.2005 30.01.2015 3 updates
- Sludge and Screenings Thermal Treatment Facility
treatment of sludge and screenings (thermal
treatment) - validity 12.01.2010 11.01.2020 1 update
- STTF waste landfill treatment of fly ash and
dusts removed from the flue gases (storage) - validity 12.01.2010 11.01.2020
5(No Transcript)
6Monitoring of pollutant emissions and immissions
Every year, the DWWTP Laboratory carries out
about 3500 monitoring tests. Some of the
laboratory tests (air, noise) are carried out by
the external laboratories.
7(No Transcript)
8(No Transcript)
9BAT examples at the DWWTP Site
- Sludge thermal treatment (fluidized bed
incinerators, monitoring of the process) - Energy recovery at the STTF (heat recovery from
flue gases, recirculation of steam and
condensate) - High quality sealing system of the waste
landfill(electronic sensor based monitoring) - Reduction of secondary fly ash and dusts
re-entrainment from flue gas treatment to a
minimum (moisturizing and spraying) - Replacement of biodegradable waste (screenings)
storage with thermal treatment process
(incineration)
10New obligations imposed on the IPPC installation
operators
- Directive 2010/75/EU of the European Parliament
and of the Council of 24 November 2010 on
industrial emissions (integrated pollution
prevention and control) (IED) lays down new rules
and obligations for prevention of industrial
pollution. The Directive provisions should be
implemented by the national legislation by 7
January 2013. The key provisions include the
following - The requirement to adjust of the IPPC
installations to the IED provisions (by 7 January
2014), - Establishment of new categories of activities
(including WWTP) which have to comply with the
IED requirements (as of 7 July 2015 r.). - New rules and obligations imposed by IED
- Requirements of BAT reference documents will be
legally binding, - Requirement to report soil and groundwater
contamination levels, and to carry out the
relevant monitoring, - New emission level requirements (SO2, NOx, dusts)
for large incineration plants.
11Experience acquired during implementation of the
IPPC Permit requirements
- Compared to the sector permit system the
obligations of the IPPC installation operators
are strengthened. - If you have a single integrated permit for a
large plant any modification considered
significant by an environment protection
authority involves the necessity to submit an
application for permit revision for the whole
plant (what needs time and financial outlays). - every 5 years the IPPC Permit is reviewed in
order to check the compliance with legislation
and BAT requirements.