Grupowa Oczyszczalnia Scieków Lódzkiej
Aglomeracji Miejskiej
Practical aspects of compliance with the
Integrated Permit requirements based on the
example of District Waste Water Treatment Plant
of Lódz Conurbation
Fot U. Czapla
2
Background
  • The integrated permit system was imposed in the
    European Union by way of Council Directive
    96/61/EC of 24 September 1996 concerning
    integrated pollution prevention and control
    (IPPC).
  • Integrated Permit. it is an administrative
    decision granting authorisation to operate an
    installation subject to certain conditions that
    guarantee that the installation complies with the
    requirements established for all environmental
    elements and with the best available technique
    (BAT), which determines the types and volumes of
    the raw materials, energy and fuels to be used

3
Objectives and requirements of the Integrated
Permit System
  • Considerable and systematic improvement of
    environment in the European Union
  • Prevention and further reduction of the
    pollutant emissions into the environment
  • Operation of the installations will the possibly
    lowest impact on the environment as a whole
  • Continuous improvement of the techniques intended
    to prevent pollution
  • Development, implementation and constant
    improvement of the environment management systems
    in the industrial plants
  • New methods of cooperation with environment
    protection authorities

4
Integrated permits for LC DWWTP
  • DWWTP waste dump -Lagoons treatment and
    recovery of non-hazardous and neutral waste
    (storage)
  • validity 31.01.2005 30.01.2015 3 updates
  • Sludge and Screenings Thermal Treatment Facility
    treatment of sludge and screenings (thermal
    treatment)
  • validity 12.01.2010 11.01.2020 1 update
  • STTF waste landfill treatment of fly ash and
    dusts removed from the flue gases (storage)
  • validity 12.01.2010 11.01.2020

5
(No Transcript)
6
Monitoring of pollutant emissions and immissions
Every year, the DWWTP Laboratory carries out
about 3500 monitoring tests. Some of the
laboratory tests (air, noise) are carried out by
the external laboratories.
7
(No Transcript)
8
(No Transcript)
9
BAT examples at the DWWTP Site
  • Sludge thermal treatment (fluidized bed
    incinerators, monitoring of the process)
  • Energy recovery at the STTF (heat recovery from
    flue gases, recirculation of steam and
    condensate)
  • High quality sealing system of the waste
    landfill(electronic sensor based monitoring)
  • Reduction of secondary fly ash and dusts
    re-entrainment from flue gas treatment to a
    minimum (moisturizing and spraying)
  • Replacement of biodegradable waste (screenings)
    storage with thermal treatment process
    (incineration)

10
New obligations imposed on the IPPC installation
operators
  • Directive 2010/75/EU of the European Parliament
    and of the Council of 24 November 2010 on
    industrial emissions (integrated pollution
    prevention and control) (IED) lays down new rules
    and obligations for prevention of industrial
    pollution. The Directive provisions should be
    implemented by the national legislation by 7
    January 2013. The key provisions include the
    following
  • The requirement to adjust of the IPPC
    installations to the IED provisions (by 7 January
    2014),
  • Establishment of new categories of activities
    (including WWTP) which have to comply with the
    IED requirements (as of 7 July 2015 r.).
  • New rules and obligations imposed by IED
  • Requirements of BAT reference documents will be
    legally binding,
  • Requirement to report soil and groundwater
    contamination levels, and to carry out the
    relevant monitoring,
  • New emission level requirements (SO2, NOx, dusts)
    for large incineration plants.

11
Experience acquired during implementation of the
IPPC Permit requirements
  • Compared to the sector permit system the
    obligations of the IPPC installation operators
    are strengthened.
  • If you have a single integrated permit for a
    large plant any modification considered
    significant by an environment protection
    authority involves the necessity to submit an
    application for permit revision for the whole
    plant (what needs time and financial outlays).
  • every 5 years the IPPC Permit is reviewed in
    order to check the compliance with legislation
    and BAT requirements.

12
Fot U. Czapla
13
GRUPOWA OCZYSZCZALNIA SCIEKÓW W LODZI SP. Z
O.O.93-469 LÓDZul. SANITARIUSZEK 66tel. (42)
640-47-80fax (42) 640-47-75gos_at_gos.lodz.plwww.g
os.lodz.pl
We invite for cooperation
Write a Comment
User Comments (0)
About PowerShow.com