Title: Stato dell


1
Stato dellesperimento CMS2008
  • Pierluigi Paolucci
  • Istituto Nazionale di Fisica Nucleare

2
CMS Management 2008
  • From Jan 2009
  • CB Chairperson D. Green,
  • Deputy F. Gasparini
  • Tracker PM G.M Bilei
  • ECAL PM R. Rusack
  • HCAL PM G. Spalding (from Jun 09)
  • Muon DT PM M. Dallavalle

Election of the new CMS Spokesperson Mar 2009 A
term of 2 years starting Jan 2010.
3
Responsabilità napoletane nel nuovo organigramma
  • Livello II di CMS
  • Membro eletto del CMS conference committee (Pigi)
  • Online ed Offline Database project (Pigi)
  • AOD (L. Lista)
  • Livello III (progetto RPC)
  • Sistema di potenza
  • Data Quality Monitor online ed offline (A.
    Cimmino)
  • Responsabile dei DCS (G. Polese)
  • Analisi dei dati Z ? mumu (F. Fabozzi)

4
Struttura del Gruppo di Napoli
Il gruppo è passato da 4 a 13 ricercatori (in 5
anni) N. Cavallo, S. Buontempo, A. Cimmino, F.
Fabozzi, O. Iorio, L. Lista, D.
Lomidze, M. De Gruttola, S. Di Guida, P. Noli,
P. Paolucci, G. Polese, C. Sciacca
  • Main Items (da 2 a 7)
  • Data taking
  • Detector Control System
  • Sistema di Potenza
  • Technical coordination (organizzazione in corso)
  • Analisi dei dati
  • Data Quality Monitor (trigger e rivelatori ad
    RPC)
  • Fisica Elettrodebole
  • Online ed offline
  • Database
  • AOD

13 Ricercatori lt 50 senior gt 50 giovani
5
Organizzazione del Gruppo (I)
  • 3 linee principali di ricerca
  • Data taking (RPC) Pigi
  • Offline (DB AOD) Pigi e Luca
  • Analisi dei dati (DQM EW) - Luca, Francesco e
    Pigi
  • Equa divisione dei senior e dei dottorandi e
    laureandi (seguendo le loro preferenze)
  • Ampia scelta di item e di relative posizioni di
    responsabilità
  • Possibilità di accedere a più posizioni a tempo
    determinato

6
Organizzazione del Gruppo (II)
  • Posizioni CERN - INFN
  • Doctoral Student CERN (30 mesi) DCS Giovanni
  • Technical Student CERN (14 mesi) DB Michele
  • Technical Student CERN (dal 2009) DB S. Di Guida
  • Contratto Fermilab (6 mesi) RPC Anna
  • Borsa INFN post laurea (2 anni) RPC Anna
  • Borsa INFN per stranieri (2 anni) RPC David
  • Minifellow (calib. Trigger) (nel 2009) Anna
  • 7 Laureandi e 5 dottorandi (analisi
    rivelat/dati)
  • Il primo anno di PHD è svolto in un ambito molto
    vicino al data taking e/o offline ? poi tesi di
    analisi dei dati

7
Organizzazione del Gruppo (III)
  • In conclusione, conoscendo bene le difficoltà
    odierne per accedere a posti a tempo
    indeterminato abbiamo strutturato il gruppo in
    modo da poter offrire ai giovani
  • Ampia scelta di argomenti per le tesi di laurea e
    phd
  • Adeguata formazione culturale (rivelatore e/o
    data tacking e poi analisi dei dati)
  • Rapido inserimento nella collaborazione
    internazionale di CMS (lunghi periodi al CERN)
  • Partecipazione a Scuole e Conferenze
    Internazionali
  • Note referate di CMS ed articoli di CMS
  • Rapido accesso a ruoli di responsabilità (Anna,
    Giovanni e Michele)
  • Accesso alle posizioni CERN/Europee per arrivare
    pronti ai probabili concorsi italiani e/o europei

8
Primo componente nella sala (2 Nov 06)
9
One Year Ago !
10
3 Months Ago Final Closure
3rd September
11
Run di cosmici con campo magnetico ON (3.8
Tesla) 300 milioni di eventi
12
Opening CMS
13
Example Barrel Muon Chambers
10 camere tra drift tube ed RPC hanno bisogno di
piccolo interventi
14
Global runs
  • Global Run Nov-Dec 2007
  • 10M events in 8 days
  • 3 TB data volume (raw, reco)
  • CRAFT Oct-Nov 2008
  • 10M events in 10 hours, 2TB/hour
  • 380 TB data volume (raw, reco, debug) and growing
    with datasets

15
Presa dati con i cosmici
CRUZET4 Pixel tracker and EE join (final CMS
config)
Sept.10
CRUZET3 Strip tracker joins
CRUZET2
CRUZET1
DAYS after end March, 2008
16
CRAFT
  • Goals
  • Run CMS for 4 weeks continuously to gain
    operational experience
  • Study effects of B field on detector components
  • Collect 300M cosmic events with tracking
    detectors and field ( 70 livetime)
  • Achieved
  • Ran 4 weeks continuously
  • 19 days with B3.8T
  • 370M cosmic events collected in total
  • 290M with B3.8T and with strip tracker and DT
    in readout
  • 194M with all components in

Oct.21 VIP visit
17
LHC beams
18
Offline/computing
  • Prompt reconstruction ofruns at T0 took a
    typical latency of 6h
  • Of the 290M events with B3.8T
  • 87 have a standalone muon track reconstructed
  • 3 have a global muon track with strip tracker
    hits (7M trks)
  • 3-4 x 10-4 have a track with pixel hits (70K
    trks)
  • From T0?T1 average 240 MB/s transfer rate
  • Total data volume transferred 600 TB

19
CRAFT CMS performance
Tracking 7 M tracks, 500 K with Pgt 100 GeV
20
Tracker alignment
Use 4M tracks for alignment and 1M for
validation The second update on alignment
constants delivered 1 day after CRAFT ended
21
Pixels alignment
Operated reliably in data-taking Device is quiet
with cosmics Masked 20 noisy pixels in barrel
(out of 66M BarFW) About 70 of tracks in
fiducial volume of barrel detector have a pixel
hit
RMS47mm
RMS112mm
22
Drift Tube Chamber
  • Residuals
  • Reasonable agreement between data and MC
  • Sigma residuals 200 260 ?m

23
Detailed RPC Efficiency Timing Studies
eff
BX
masked strips
  • Le 480 camere ad RPC del barrel sono operative
    (5 singole gap off)
  • Grazie ai run di cosmici abbiamo trovato e
    risolto alcuni errori di
  • cablaggio (hardware) e di geometria (software)
  • I tool sviluppati dai napoletani sono stati
    molto utili durante il data tacking
  • Efficienza delle camere è gt 95 (problemi con
    alcune strip rumorose)

24
HCAL Barrel Muon dE/dX
25
ECAL Barrel
  • Collected large dataset at nominal LHC gain (G50)
    and at increased gain for cosmics
  • Included in trigger path for 35 of runs
  • Occupancy
  • Timing

Masked tower
26
ECAL Endcap
EE
EE-
Era uno dei punti critici di CMS. Ora è
installato e funziona molto bene ?
27
Molte analisi con i cosmici
Allineamento dei singoli rivelatori, ombra della
luna.ed altro
28
Stato dei progetti napoletani (I)
  • Il sistema di potenza è completamente installato
    e funzionante (1500 canali 3 failure/anno)
  • Adesso tutta la collaborazione ha capito perché
    abbiamo fortemente voluto il sistema di HV
    accessibile, sempre.
  • Monitor delle temperature (300 sensori),
    dellumidità della miscela e del gas è ora parte
    del sistema di monitoring .
  • Abbiamo adesso una chiara mappa termica degli RPC
    ed abbiamo individuato alcune fonti di calore che
    dovranno essere raffreddate in un modo più
    efficiente.
  • Il sistema di Detector Control System è
    completato ed integrato in quello centrale di CMS
    (è in funziona da circa 2 anni Tutti i dati
    sono nel database online)

29
Stato dei progetti napoletani (II)
  • Data quality monitor (analisi online ed offline
    dei dati del rivelatore e del trigger) ha fatto
    notevoli passi in avanti. Cè ancora molto lavoro
    da fare specialmente per la parte di analisi
    offline vedi talk Anna
  • Il progetto centrale del database online ed
    offline ha superato la review esterna ed ha
    dimostrato di funzionare senza problemi durante
    il global run CRAFT.
  • RPC è il primo sottosistema ad aver i condition
    data disponibili per lanalisi offline - vedi
    talk michele
  • Lanalisi dei dati nel settore EWK sta dando
    ottimi risultati specialmente nella misura della
    sezione durto Z ? mm (2 tesi di phd e 2 di
    laurea). La nostra analisi è stata elogiata
    pubblicamente. Zjets (tesi di laurea) vedi
    talk di Luca

30
RPC Detector Control system
Barrel (24 c.) Endcap (12 cham.)
4 HV Boards (1 ch. per chamb.) 3 2 LV Boards (chamb. LBB ) 4 HV Boards (12 chamb.) 1 1 LV Boards
31
Data Quality Monitor
  • Abbiamo studiato molte variabili disponibili
    online (non richiedono la ricostruzione della
    traccia) ed alcune informazioni presenti nel DB
    online.
  • Il prossimo passo è costruire un algoritmo che
    usando tutte le variabili che abbiamo
    identificato possa evidenziare e classificare gli
  • eventuali problemi di ogni singola porzione di
    camera.
  • Lavoro analogo andrà fatto nel offline dove
    logicamente le informazioni disponibili sono
    molte di più (efficienza.)

32
Conclusioni CMS
  • CMS è completato ?
  • Stiamo prendendo dati ininterrottamente da più di
    un anno, con e senza campo magnetico.
  • Gran parte degli allineamenti sono completati
  • Non ci resta che partire con la presa dati
  • Nuovo spokesman dal 1 gennaio 2010, eletto nel
    marzo 2009 3 italiani in pole position
  • Il trigger per muoni DT-RPC-CSC sta funzionando
    perfettamente mostrando affidabilità e
    ridondanza.
  • Lanalisi EWK sta dando molte soddisfazioni al
    gruppo di Napoli (sezione durto Z ? mumu) - Luca

33