DIOXIN MEASUREMENTS IN CANDIDATE COUNTRIES PROJECT - PowerPoint PPT Presentation

About This Presentation
Title:

DIOXIN MEASUREMENTS IN CANDIDATE COUNTRIES PROJECT

Description:

dioxin measurements in candidate countries project dioxin measurement in turkey background and capabilities s nmez da li environmental engineer,msc – PowerPoint PPT presentation

Number of Views:122
Avg rating:3.0/5.0
Slides: 21
Provided by: sda131
Category:

less

Transcript and Presenter's Notes

Title: DIOXIN MEASUREMENTS IN CANDIDATE COUNTRIES PROJECT


1
DIOXIN MEASUREMENTS IN CANDIDATE COUNTRIES
PROJECT
  • DIOXIN MEASUREMENT IN TURKEY
  • BACKGROUND AND CAPABILITIES
  • Sönmez DAGLI
  • Environmental Engineer,MSc
  • TUBITAK-MRC
  • ENERGY SYSTEMS AND ENVIRONMENTAL RESEARCH
    INSTITUTE
  • P.O.Box 21 Gebze-Kocaeli TURKEY

2
PRESENTATION PLAN
1-Who is MRC-ESERI? 2-History of Dioxin in
MRC-ESERI 3-Our Capabilities 4-Main Dioxin
Sources in Turkey 5-Proposed Measurement Sites in
Turkey
3
Who is MRC-ESERI
TUBITAK-The Scientific and Technical Research
Council of Turkey The TUBITAK Marmara Research
Center (MRC), one of the research and development
(RD) units of TUBITAK, was established in 1972.
MRC 700 trained and experienced personnel, about
400 researchers. More Information
www.mam.gov.tr/english/index.html
4
Who is MRC-ESERI
  • TUBITAK-MRC is constituted of 5 institutes,
    namelyInformation Technologies Research
    Institute
  • Energy Systems and Environmental Research
    Institute
  • Materials and Chemical Technologies Research
    Institute
  • Food Science and Technology Research Institute
  • Earth and Marine Sciences Research Institute

5
History of Dioxin in MRC-ESERI
January 03 Market searched for Dioxin in Turkey
EU February 03 Dioxin study business plan
prepared March 03 EPA, EN Standards translated
to Turkish April 03 Institutions for training
searched in Europe May 03 PCDD and PCDF sources,
formation and toxicity examined
6
History of Dioxin in MRC-ESERI
June 03 materials and equipments ordered for
EN-1948/1-2 Contact with MoE, metal recovery
firms searched in Turkey for this project August
03 Extraction and clean-up systems are performed
for EN-1948/1-2, first trials September 03
Calibration of HRMS with standards done October
03 The results are validated for Accreditation,
Recoveries 80-120 for TCDD/F, PeCDD/F, HxCDD/F
and 100-140 for OCDD/F
7
History of Dioxin in MRC-ESERI
November 03 CRM for accreditation ordered the
first real extraction and clean-up trials from
adsorbent (XAD-2) studied December 03 The
mistakes of our experimental system searched,
clarifying the procedure January 04 Obtained the
higher recoveries in the analyse of CRM
8
Our Capabilities-Mass Spectrometry Lab
  • MRC-Mass Spectrometry Laboratory
  • 1 pc GC with FID Dedector (FISONS)
  • 1 pc GC with MS Dedector (FISONS)
  • 1 pc Head Space Sampler (Perkin Elmer)
  • 1 pc Thermal Desorber (Perkin Elmer)
  • 1 pc HPLC (Shimadzu)
  • 1 pc HRMS (Micromass) with GC (without
    autosampler)

9
Our Capabilities-Mass Spectrometry Lab
10
Our Capabilities-Mass Spectrometry Lab
11
Our Capabilities-Mass Spectrometry Lab
12
Our Capabilities-Mobile Air Quality Lab
  • Determination of various emission and air quality
    parameters such as particulate matter, organic
    gases, heavy metals, traffic and industrial
    activities.
  • Mobile air quality laboratory is isolated from
    heat, dust and water
  • A UPS to back up all the equipment for
    electricity cut off for 2 hours
  • Computer System for on-line monitoring and data
    acquisition
  • Air conditioner to stable inside temperature of
    the cabin in range of 10 C and 35 C
  • MGC 101, calibration unit(gas-mixture calibrator)
    and calibration tubes

13
Our Capabilities-Mobile Air Quality Lab
  • Analyse parameters of Air Quality/Mobil Air
    Quality Lab
  • -Stack gases (SOx-EPA6C, NOx-EPA CTM022,CO-EPA
    CTM30)
  • -VOC Sampling
  • -Heavy Metals
  • -Halogenated compounds
  • -Ammonia
  • -Dust (EPA 17)
  • -Dioxin and Furane Sampling
  • Accredited by DAP/DAR (Germany)

14
Our Capabilities-Mobile Air Quality Lab
Weather Quality Measurements -Particulate
matter -Sulphur Dioxide -Nitrogen Oxide -Volatile
Organics -Carbon monoxide and dioxide -Ozone -Pass
ive samplers for air quality measurement (HF,
HCl,NOx, VOC, O3) -Air Quality Modelling
15
Main Dioxin Sources in Turkey
Waste Incineration (1 Industrial,7 medical
waste incinerator) Ferrous and Non-Ferrous
Metal Production (3 Iron ore sintering
facilities, gt100 foundries, gt100 sec.aluminium
producer) Power Generation and Heating (5 Power
Plants with fossil fuel, 5 Power Plants with
Natural gas, 1 municipal compost gas
incinerator) Production of Mineral Products (40
Cement facilities, gt10 Lime prod.facilities
16
Main Dioxin Sources in Turkey
Uncontrolled Combustion Processes (Forest fires
8514 Ha/year 2002, Agricultural residue
burning) Production of Chemicals ( 1
Petrochemistry Facility-156.000 ton/year PVC, 54
pulp and paper facilities-1.762.500 ton
paper/year 2003) Disposal/Landfill (The most
important problem in Turkey, gt80 of daily
municipal wastes are handling with wild landfill)
17
Secondary Aluminium Producers
18
Lead-Zinc-Copper Recovery Facilities
19
Proposed Measurement Sites in Turkey,Ankara
20
Results
-MRC will great appreciate getting a role in this
project -MRC will gain strategic assistance in
the scope of this project -Dioxin subject will
gain a particular attention by industry and
governmental institutions
Write a Comment
User Comments (0)
About PowerShow.com