2- Dioxins in Candidate Countries
- Emission measurement program
Ulrich Quass Airborne Particle Group IUTA e.V. ,
Germany
3Outline
- Objectives
- Procedure
- Responses to query
- First campaign
- Second campaign
- Further options
4Objectives
- Support emission inventory by
- providing better emission estimates for relevant
facilities - Identification of unknown hot-spots
- Check of emission factors used in inventory
- Support capacity building process in CCs by
- comitting measaurement tasks to local
laboratories - supervision of sampling executed by recently
formed local groups
5Procedure
Query to national experts request for proposals
of facilities request for information on
laboratories
Selection of facilities from proposals
Selection of appropriate companies/laboratories
to be asked for offers
Call for tenders
Selection of best offer
Commision of measurements
6Responses to query (1)
Measurement Capabilities
County Sampling Analysis
Czech Republic 1 (experienced) 1 (experienced)
Poland 3 (experienced) 3 (no HRMS)
Slovakia 3 ( 1 experienced) 1 (experienced)
Turkey 1 (unexperienced) 1 (unexperienced)
Latvia 1 (unexperienced) No
Cyprus 1 (unexperienced) No
Lithuania 1 (unexperienced) No
7Responses to query (1)
Facility Proposals 10 of 13 countries
responded no response from Hungary,
Romania, Slovenia
Number of proposals
Bg Cy Cz Est Lit Lv M Pl Sk Tr
1 2 1 2 2 1 1 8 3 2
8Responses to query (2)
Sector Type Number Country
Energy prod. Power plant lignite, 2 Bg, Sk
heavy oil 2 M, Cy
unknown 1 Lit
Steel industry Pig iron tipping 1 Cz
Scrap smelter 1 Lv
Sintering 2 Pl, Sk
EAF ladle furnace 1 Pl
Cupola furnace 1 Pl
9Responses to query (3)
Sector Type Number Country
Non-ferrous metals Al 3 Pl, Tr
Zn 5 Pl, Tr
Other 4 Pl
Earth Stones Cement, dry 1 Cy
Cement, wet 2 Est, Lit (?)
Other Shale oil prod. 1 Est
Bark combustion 1 Sk
10Iron ore Sintering in CCs
(activity rates in TNO database)
11Results of 1. Campaign (1)
Iron ore sintering at Cracow, Pl
Concentration ng I-TEQ/m³ Annual emission g I-TEQ/year Emission factor µg I-TEQ/t
0.36 0.5 0.4
4 (previous Measurements)
Range of EFs measured in Czech Republic 3.8
20.5 µg I-TEQ/t
UNEP Tool kit EF 0.3 - 20 µg
I-TEQ/t
?Using Tool kit EFs overestimation?
12Results of 1. Campaign (2)
Processing of zinc containing meterials, Pl
Process Concentration ng I-TEQ/m³ Annual emission g I-TEQ/year Emission factor µg I-TEQ/t
Electrolytic melting 0.02 0.003 0.04
Zn recovery 3.66 1.1 130
ZnO sintering 7.29 0.47 111
UNEP Tool kit EFs 0.3 - 100 µg
I-TEQ/t
13Results of 1. Campaign (3)
Secondary zinc production (activity data from TNO
database)
tons/year
Turkey?
14Results of 1. Campaign (4)
Kunda cement factory, Estonia
Concentration ng I-TEQ/m³ Annual emission g I-TEQ/year Emission factor µg I-TEQ/t
0.018 0,04 0,07
UNEP Tool kit EFs 0.15 - 5 µg
I-TEQ/t
15Second Campaign
- Selected sources
- iron ore sintering, Sk
- Bark combustion, Sk
- Sec. Aluminium production, Tr
- Power plant, lignite, Bg
- Steel works, Latvia
Potentially relevant source
State of biofuel combustion
Potentially relevant first measurement in Tr,
Typical facility for CCs(?)
Relevant for Lv(?), scrap from Russia
16Options for 2nd project year (1)
- A 3rd measurement campaign
- B Training study for Newcomer laboratories
173rd measurement campaign?
0.007 ?
0.037 !
183rd measurement campaign?
19Training for New Labs?
- New sampling teams founded in
- Estonia
- Latvia
- Lithuania
- Cyprus
- Turkey (also analysis)
- Experienced teams available from
- Czech Republic
- Poland
- Slovakia
20Training for New Labs?
Draft outline of an intercomparison study
2 samplings simultaneously (1 as reference, 1 to
test) Each team 3 samples and 1 blank Overall
samples 6 (ref) 7 (test) 3 39 Overall
blanks 6 (ref) 7 (test) 1 13
? 52 analyses
Analyses to be done by one laboratory, some
samples split for cross-checks
? 60 analyses
Campaign duration ca. 3 weeks, 1 team all days,
other each 3-4 days
? 60 pers.-days
Overall cost estimate 70,000 80,000
21Training for New Labs?
- Open questions
- Suitable plant (2 ports, PCDD/F level 1 ng
I-TEQ/m³) - Selection of reference sampling team
- Selection of central laboratory
- Local campaign organisation
22Conclusion
- Measurements made so far
- Surprisingly low emissions from sinter plant
- Expectable emissions from sec. zinc production
(Pl) and cement plant (Est)
- Measurements scheduled for 2nd campaign
- 2nd Sinter plant, biofuel(bark) combustion (Sk)
- Sec. Al production, Power plant (Tr, Bg
co-operation) - Steel works scrap prcessing (Lv, co-operation)
- Options for continuation
- 3rd campaign (further relevant sources?)
- Field intercomparison (? capacity building)