Materials Requirements Planning
Franz Birsel
2
Task of Disposition
  • Due providing of the necessary material
    requirement
  • Providing of the material requirement for the
    disposition
  • Providing of the internal material requirements
  • Long-term management of the material availability
  • Dissolving lists of material
  • Preparation of planned orders for the production
  • Preparation of Beschaffungsvorschlägen for the
    purchasing dept.

3
Methods of Dispositions
  • Consumption-driven Dispositionbased only on the
    use of materials in the past
  • Deterministic or demand-driven Dispositionbased
    on the demand of materials in the future

4
Consumption-driven Disposition
  • Activator of production- or providing demands in
    the consumption-driven disposition is the
    undercutting of a defined minimum stock level
  • The stock level should be high enough that the
    provision of material during the delivery time of
    the supplier or the time of inplant production is
    secured

5
Deterministic Disposition
  • Activator of the production- or providing demands
    in the deterministic disposition is the existence
    of pegged requirements These are e.g.
  • Customer orders
  • manually triggered production orders Planaufträge
  • The deterministic disposition does not produce
    any supply which are not really needed

6
Types of Disposition
  • Single item, single-level planning
  • Single item, multi-level planning
  • Total planning

7
Single itemSingle-level planning
  • Single item, single-level planning is conducted
    manually online
  • Only the entered material is planned. If the
    material has a bill of material, the bill of
    material will be dissolved and all materials of
    this bill of material planned.
  • Subjacent lists of materials are not planned.
  • The single-object single-stage planning is
    usually conducted in the warehouse in order to
    check the availability of each material.

8
Single itemMulti-level planning
  • The single item, multi-level planning is
    conducted manually online.
  • The entered material is completely planned. If
    the material has a bill of material, the bill of
    material will be dissolved and all materials of
    this bill of material planned.
  • Subjacent bills of materials are planned up to
    the lowest level.
  • The single-object single-stage planning is
    usually conducted in the production management
    and control in order to check the availability of
    every material of a production order.

9
Overall Planning
  • The overall planning can be conducted manually
    online or as background job.
  • As a rule the overall planning is periodically
    automatically planned.
  • The period depends on how flexible the production
    has to react to changes in the pegged
    requirements.

10
Amount of the overall planning
  • New PlanningA new planning is normally conducted
    only by implementing a system
  • All materials are planned that have a valid
    dispo-attribute.
  • Net-Change-PlanningEvery disposition-relevant
    change of material places internally an attribute
    on the material level which marks the material
    for the next planning.
  • The advantage is a reduction of the duration of
    planning materials which have not been changed,
    will not be handled.

11
Level of Disposition Planning
  • The demand planning is generally conducted on
    factory level, i.e.in planning the whole
    available stock in the factory will be
    considered.
  • The stocks of several storage locations can be
    dissolved or planned independently from the
    disposition. These stocks will not be counted in
    the disposition on the factory level.
  • Moreover, the demand planning can also be
    conducted for several fields of disposition. In
    one field of disposition more storage locations
    can be combined and the demand planning can be
    conducted separately from the factory for this
    field of disposition.
  • Fields of disposition enable also a
    differentiation of the demand planning within a
    factory.

12