Transcript and Presenter's Notes

Title: DPW Procurement


1
DPW Procurement
  • Bidding and Contracts
  • Project Bid Submittals

2
Project Bid Submittals
  • Plans and Specs
  • Table of Content
  • Bid Data Sheet
  • Bid Release Assessment Checklist
  • Bid Release Sheet

3
Electronic Files of the Plans Specs
  • Specifications
  • One (1) PDF File per Volume
  • Plans/Drawings
  • One(1) PDF File per Volume
  • Table of Content
  • Check with us for the latest version
  • Word Document

4
Assessment Checklist
5
Bid Data Sheet
6
Bid Release
  • http//www.ct.gov/dpw2Dbdc/site/default.asp
  • Bid Stage link
  • Bid Release link
  • Bid Release Assessment Checklist
  • Bid Release Procedures/Instructions - tab
  • Form 600 tab - The Bid Release Sheet

7
Bid Release Sheet
8
Procedures/Instructions
9
DAS Pre-qualification Classification
  • DAS Pre-qualification is only required for
    projects with an estimated value over 500,000.
  • If you use more than one classification then make
    sure you are clear whether you mean one or the
    other or both.
  • For example,
  • Use or for either
  • Use and for both
  • I prefer one classification

10
DAS Pre-qualification Classification
  • The classification is in the Invitation To Bid
  • The Bidder must be DAS Pre-certified in the
    classification on the Invitation To Bid
  • Make sure you review the DAS List and its
    definitions before entering a classification
    they are part of Bid Release Sheet Procedures

11
General Building Classification
  • General Building A
  • Building without interior finish
  • Ex.
  • Warehouse
  • Dormitory

12
General Building Classification
  • Gen. Bldg. Const. B
  • Building with INTERIOR FINISH
  • Ex.
  • Office Buildings
  • Classrooms
  • Adm. Offices
  • Auditoriums

13
General Building Classification
  • Gen. Bldg. Const. C
  • CUSTOM, SCIENTIFIC
  • COMPLEX Mechanical Electrical
  • Ex.
  • Hospitals
  • Historical

14
Supplementals
  • Only up to the Maximum Available Amount.
  • This means that in your Bid Release, the Base
    plus the Supplementals should not exceed the
    Maximum Available Amount.
  • Make sure that the base and supplemental
    calculations in the Bid Release Sheet match with
    those in the Data Sheet.

15
Date Planning Began
  • CGS 4-252(e) requirement for purchases at 50,000
    or more
  • For bonded projects this is the date B100S was
    accepted

16
Funding Authorized
  • Date
  • Section

17
Pre-bid Meeting
  • If the pool of bidders is limited and you make
    the pre-bid meeting mandatory then chances are
    that you may need to rebid.
  • Make sure that you only allow SBSA contractors in
    pre-bid conference for SBSA projects (most
    Informals)

18
Sub-trades
  • The sub-trades are for formal projects, those
    over 500,000 and the individual sub-trades over
    25,000
  • The sub-trades should only be the four (4) noted
    in the statue
  • Electrical
  • Mechanical other than HVAC
  • HVAC
  • Masonry

19
Set-aside Waiver
  • Set-aside waivers are request from Bruce
    Bockstael, Chief Architect
  • You must explain in detail and verify your
    justification for your request for a Set-aside
    Waiver.

20
Special Requirements
  • Any special requirement is intent for information
    that the bidders should know up-front before they
    bid because it may cause their bid to be
    rejected.
  • This information will be place in the Invitation
    To Bid.
  • So anything you want on the Invitation to Bid put
    it here.

21
Insurances
  • Builders Risk
  • Special Hazard
  • Asbestos Abatement
  • Type "X", "C", "U" Explosion, Collapse,
    Underground in accordance with Article 35 of the
    General Conditions.

22
Unit Prices
  • Make sure that the Unit Prices in the Bid Release
    Sheet match with those in the Data Sheet.

23
Additional Remarks
  • Additional remarks are NOT made part of the
    Invitation to Bid.
  • Let us know here if the GC will be required to
    have asbestos removed.

24
Asbestos Abatement By GC
  • Attached the Report.

25
Addenda
  • Addenda must be submitted with enough time for
    the Bidding and Contracts staff to post on the
    Web site - this is seven (7) days in advance
  • NO addenda on Fridays
  • Addenda issues through AFAO

26
Addenda
  • Bureau of Design Construction Intranet
  • Bid Stage link
  • Addendum Format link
  • Addendum Transmittal link

27
Addendum Format
28
Addendum Format
  • Addenda Number
  • Addenda Date
  • Project Number
  • Project Title
  • Changes
  • Item No.
  • Name and Number of Section
  • Change From To
  • End of Addendum

29
Sequence of Changes
  • Changes to PRIOR ADDENDA
  • Changes to BIDDING REQUIREMENTS
  • Changes to GENERAL CONDITIONS
  • Changes to SPECIFICATIONS/Technical Section
  • Changes to DRAWINGS/PLANS

30
Addendum Transmittal
31
Addenda
  • Before you submit an addendum consider the future
    consequences
  • For example, some addenda generated more addenda
    that in turn reverse the previous addenda
  • In one project, the outcome was ten (10) addenda
  • In this same project, some items were supposed to
    be color code but this was not communicated
    thus, requiring another addendum

32
Recommend
33
Start Date Notice to Proceed
34
Milestones
  • Bid Opening
  • Set-aside Schedule
  • Contractors Qualification Reviews
  • Recommends
  • Affirmative Action Plan cc PMs CHRO approval
  • Bond Commission Funding Approval or Transfer
    posted
  • Letter of Intent cc PMs - Contract Documents
  • Contract Approval Project Clearance Memo to
    PMs
  • Construction Schedule Approval
  • Start Date Notice To Proceed

35
Time Line After Bid Opening
  • Set-aside Schedule 10 Days
  • Affirmative Action Plan
  • Contractor file w/i 30 days, CHRO accept or
    reject w/i 60 days
  • Recommends (?)
  • Bond Commission Funding Approval (?)
  • Letter of Intent 15 Days
  • Contract Package 2 days
  • Contract Approval 2 weeks
  • Legal
  • Commissioner
  • AGs average of 7 Days
  • Project Clearance Memo (?)

36
(No Transcript)
37
(No Transcript)
38
(No Transcript)
39
Efficiency
  • Project managers are copied on the AAP Letter,
    Letter of Intent, and are notified of the award
    via the Clearance Memo.
  • Inquiries to fiscal officers for information they
    already provided time away from processing.
  • Please be brief with your inquiries and comments
    to the fiscal officers.

40
Efficiency
  • Please allow the staff to go through the bidding
    and contracting process for your request.
  • Are we there yet?
  • Please keep in mind that the staff is working on
    multiple projects.

41
Questions