NASA Advisory Council - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

NASA Advisory Council

Description:

SpaceX Milestone Tracking. Orbital COTS System. Description & Features: Taurus II Launch Vehicle derivative of Taurus I with Aerojet AJ-26 engines (2) ... – PowerPoint PPT presentation

Number of Views:83
Avg rating:3.0/5.0
Slides: 8
Provided by: valinth
Category:

less

Transcript and Presenter's Notes

Title: NASA Advisory Council


1
Commercial Orbital Transportation System (COTS)
Status
For Section 508 Compliance, all photos,
illustrations and/or graphics include a
descriptive caption. All charts in this package
include a background image of Earth as viewed
from space.
  • NASA Advisory Council
  • Kennedy Space Center
  • February 5, 2009
  • John Logsdon

2
SpaceX COTS System
  • Description and Features
  • Falcon 9 Launch Vehicle
  • Dragon Crew/Cargo Spacecraft
  • Flexible crew and cargo configurations
  • Recoverable launch vehicle and spacecraft
  • Cape Canaveral LC-40 Launch Site
  • ISS Flight Demonstration March 2010
  • NASA Investment
  • Cargo Demonstration up to 278 M
  • Crew Demonstration Option up to 308 M (not
    funded)

Dragon Crew
Dragon Cargo
Falcon 9
Launch Complex at KSC
3
SpaceX Milestone Tracking
4
Orbital COTS System
  • Description Features
  • Taurus II Launch Vehicle derivative of Taurus I
    with Aerojet AJ-26 engines (2) Castor 30 2nd
    stage
  • Standard Service Module used for all missions
    derived from STAR Dawn spacecrafts
  • Pressurized Cargo Module (PCM) Heritage - ISS
    MPLM
  • Unpressurized Cargo Module (UCM) Heritage - ISS
    ExPRESS Logistics Carrier
  • Wallops Flight Facility Launch Site
  • ISS Flight Demonstration December 2010
  • NASA Investment
  • Cargo Demonstration up to 170 M

Pressurized Cargo Module (w/ Service Module)
Unpressurized Cargo Module (w/ Service Module)
Taurus II
Launch Complex at Wallops Island VA
5
Orbital Milestone Tracking
Updated per SAA Amendment 1
6
COTS Flight Demonstration Schedule
2008
2011
2009
2010
Cargo Demo Flight 1 (Jun 09)
Cargo Demo Flight 2 (Nov 09)
Cargo Demo Flight 3 to ISS (Mar 10)
Cargo Demo Flight 1 to ISS (Dec 10)
7
ISS Commercial Resupply Services
  • COTS Phase II -- ISS Commercial Resupply Services
    (CRS) contract awarded December 23, 2008
  • SpaceX 12 cargo missions 2011 - 2015, 1.6 B
  • Orbital 8 cargo missions 2011 2015, 1.9 B
  • PlanetSpace protest under review with GAO

Artists Rendition of Fully Assembled ISS in Orbit
Write a Comment
User Comments (0)
About PowerShow.com