1IAEA 21st METTING OF THE TWG-NPPCI
VIENNA (22-25 MAY 2007)
SPAIN NATIONAL REPORT ON IC
MODERNIZATION ACTIVITIES IN NUCLEAR POWER PLANTS
Juan Atanasio Carrasco (Almaraz-Trillo)
Rafael Cid (CSN)
2Contents
- Spanish Nuclear Sector summary
- Modernization Strategies and their status
- Modernization examples
- BWR GE detail
- PWR W detail
- PWR KWU detail
- Example of the Modernization Strategy of
Cofrentes (simplification of EPRI one) - IC licensing in Spain
- Ideas for the work of the IC IAEA group
3Spanish Operating Nuclear Facilities
4Spanish Operating Nuclear Power Plants
5Spanish NPPs shareholders
() Nuclenor is owned by Iberdrola 50 and Endesa
50
6Generation of Energy in Spain in 2006
Source UNESA
7Spanish Nuclear Industry Capacities (1)
- Engineering companies
- Empresarios Agrupados
- Iberinco
- Soluziona
- Tecnatom (owns all the full-scope simulators)
- ITER Project European Legal Entity in
Barcelona - start-up at the end of 2006
- great opportunity for the Spanish industry
8Spanish Nuclear Industry Capacities (2)
- Main heavy components company
- ENSA - Reactor Vessels (PBMR Southafrica)
- - Steam Generators (United States)
- - Pressurizer
- - Spent fuel racks (China)
- - Spent fuel casks
- Fuel company
- ENUSA - PWR - Germany
- - BWR - Belgium
- - Gadolinium cladding - Finland
- - France
- - Sweden
- - United States
9Spanish Nuclear Industry Capacities (3)
- Public company in charge of the management of
the radioactive wastes - ENRESA - Storage of low and interm. level at El
Cabril - - ISFSI at Trillo NPP (storage of spent fuel)
- - ISFSI at José Cabrera NPP (storage of spent
fuel and high level), under construction
(2008) - - Centralised ISFSI without site decision
(20011?) - Energy, Environment and Materials Institute
- CIEMAT - Mantains shares of ENRESA and ENUSA
- Spanish Regulatory Body
- CSN, Consejo de Seguridad Nuclear
10Economic figures of the Spanish Nuclear Sector
Inversion 202,4 M
Turnover 2.385,4 M
Direct Effect in Spanish Economy
Generated Employment 15.713 jobs
Gross Value Added GVA 1.998,4 M
Indirect Effect (Commercial Relationships with
Production Centres)
Gross Value Added GVA 301,8 M
Generated Employment 6.226 jobs
Induced Effect (Increase in family expenses)
Gross Value Added GVA 373,6 M
Generated Employment 8.241 jobs
Total Effect in Spanish
Economy
Gross Value Added GVA 2.673,8 M
Generated Employment 30.180 jobs
Source Foro Nuclear 2004
11Modernization Strategies and their status
- All the Spanish NPPS are in a modernization
process - The control rooms will have a Hybrid Human
Machine Interface - Without complete modernizations in one outage
- Without strategic alliances with one supplier
(although main suppliers are preferred) - The changes start in Non safety (although key
safety systems are also modernized) - The simulator is used previously
- Bigger modernization changes
- Vandellós II (Plant computer, Turbine control,
PLCs, ) - Ascó I y II (Turbine control, Reactor control,
PLCs, ) - Almaraz I y II (Turbine control, Reactor and BOP
control in process, ) - Trillo (Teleperm XP installation in YG30, MAE and
Telecontrol, ) - Garoña (Condensate control, Rod Control, Plant
computer, Recirculation control, Power Range
Neutron Monitoring System, ) - Cofrentes (BOP control, Turbine control in
process, )
12Modernization Strategie Example Cofrentes (GE)
- Platforms for digital IC
- Non Safety Honeywell TPS GE Mark VI
- Safety Numac Other (non decided yet)
- Plan for bigger modernizations
- 2009
- Turbine and Bypass Control
- Neutron Monitoring System (PRM)
- Plant Process Computer
- 2011
- Plant Process Computer
- Feedwater Control
- Rod Control Information System
- 2013
- Recirculation Control
- ECCS Controls
13Modernization Strategie Example Almaraz I II
(W)
- Platforms for digital IC
- Non Safety Ovation
- Safety Other (non decided yet)
- Plan for bigger modernizations
- 2007
- Reactor Control
- BOP Control (MSRs)
- 2008
- Process Computer
- Auxiliary Feedwater Turbopump Control (Safety)
- BOP Control (MSRs)
- 2009
- Process Computer
- Auxiliary Feedwater Turbopump Control (Safety)
- BOP Control (Heaters)
- Generator sequencers
14Almaraz IC Plan
15Modernization Strategie Example Trillo (KWU)
- Platforms for digital IC
- Non Safety Teleperm XP (SPPA T2000)
- Safety TXS is the normal evolution
- Plan for bigger modernizations
- 2007
- Neutron Measurement Calibration (Aeroball system)
- Plant Process Computer
- 2008
- Plant Process Computer
- Refueling Machine
- Turbine Control
- 2009
- Plant Process Computer
- Refueling Machine
- Turbine Control
16Trillo IC Plan
17Cofrentes IC Plan Objective
18Cofrentes IC Plan Objective
19Cofrentes IC Plan Methodology
20Cofrentes IC Plan Methodology
21Cofrentes IC Plan Methodology
22Cofrentes IC Plan Methodology
23Cofrentes IC Plan Methodology
24Cofrentes IC Plan Preliminary Classification
25Cofrentes IC Plan Platform Structure
26Cofrentes IC Plan Platform Structure
27Cofrentes IC Plan Platform Structure
28IC Licensing in Spain
- Safety Guide 1.11 of the Regulatory body -gt
Similar to 10CFR 50.59 - Referencia a la USNRC Reg. Guide 1.187, EPRI
TR-12348 Rev1 NEI 01-01 y al NEI 96-07 rev.1 - A comom guide for IC licensing has been
developed in the sector - Regulation of the original country of each NPP
- In the case of an American Plant the main
regulation is - 10CFR50 Domestic Licensing of Production and
Utilization Facilities - 10CFR50.59 Changes, Tests and Experiments
Cambiada en año 1999. - 10CFR50 Appendix A. General Design Criteria for
NPPS - 10CFR50 Appendix B. Quality Assurance Criteria
for NPPS and... - What about European Guides/Other Guides? Their
use depends of their consideration in the
original country of each NPP and the position of
goups like this
29UNESA-6 Guide Agreement in Spanish Sector
Based on EPRI TR-12348 Rev1 NEI 01-01
30Details of IC Dev. Process
- Tipical engineering Process
- The specification is the Key Phase
- The technical Evaluation is simplified when a
cualified equipment is used - In Safety Systems it is needed an independent VV
- The Regulatory Body appears from the begining
- The licensing process is completely defined
31Ideas for the work of the IC IAEA group
- Practical details on normative (classification
examples in Europe and USA 10CFR50, RSK, IEC
61226, IEC61508, ) - Practical examples of configuration control in
real control systems - Definition of dedication tests
- Summary of Modernizations (finished and in
process) - Of bigger systems
- Of smaller systems (mainly 1E)
- Training courses in modernized simulators
- Modernization seminars (like the Nuclear Seminar
on Nuclear Automation de 2004 organized by NSSK) - Contacts with other sectors (trains, planes,
refineries, ...)