Title: SWIM in SESAR
1SWIM in SESAR
- Bob Graham
- Head Concept Strategy Development
2Agenda
- SESAR
- Work Programme
- Concept Key Components
- Conclusions
2
3SESAR IS ORGANISED IN THREE PHASES
Definition phase
Deploymentphase
Development phase
Resulted in the European ATM Master Plan
Implements the results of the development phase,
delivers the service performance increase
foreseen in the ATM Master Plan
Managed by the SESAR Joint Undertaking
Based on the Master Plan, results in Standards,
new operational procedures, new technologies
and pre-industrial components,
2015-2025
2008-2014
2006-2008
4SESAR JU A PUBLIC-PRIVATE PARTNERSHIP
NORACON
5Strategic Approaches
- Partnership
- Concept Story Board
- Validation and Verification
- Architecture / Technology
- Business
- Top Down PMP System Engineering
6Agenda
- SESAR
- Work Programme
- Concept Key Components
- Conclusions
6
7Enroute-to-Enroute to encapsulate Gate-to-Gate
WP7 / 13
WP B / C
WP15
WP3 WP16
WP9 / 11
WP9 / 11
ToC
ToD
ToC
ToD
WP5 / 10
WP5 / 10
WP4 / 10
WP4 / 10
CTA
CTA
WP5 / 10
WP5 / 10
WP6 /11/ 12
WP6 /11/12
WP6 /11/ 12
WP8 / 14
7
8WPB - Target concept Architecture
WPC Master Plan maintenance
The technical solutions to the operational
need Interoperable through standards
The common definitions and logic Facilitation
of delivery of information
The interoperable operational services The
information needed
WP3 Validation Infrastructure
WP16 Transversal areas
8
9Agenda
- SESAR
- Work Programme
- Concept Key Components
- Conclusions
9
10Building SESAR Concept of Operations
11SWIM in All of That?
- Moving from airspace to trajectory based
operations, so that each aircraft achieves its
agreed route and time of arrival and air and
ground systems share a common system view. -
- Collaborative planning so that all parties
involved in flight management from departure gate
to arrival gate can strategically and tactically
plan their business activities based on the
performance the system will deliver. - An information rich ATM environment where
partners share information through system wide
information management. - A globally agreed 4D trajectory definition and
exchange format at the core of the ATM system
where time is the 4th dimension providing a
synchronised time reference for all partners. - Airspace users and aircraft fully integrated as
essential constituents and nodes of the ATM
system. - Dynamic airspace management and integrated
co-ordination between civil and military
authorities optimising the available airspace. - Network planning focused on the arrival time as
opposed to todays departure based system, with
Airport airside and turn-around fully integrated
into ATM. - New Communication, Navigation Surveillance
(CNS) technologies providing for more accurate
airborne navigation and spacing between aircraft
to maximise airspace and airport efficiency,
improve communication and surveillance. - Central role for the human widely supported by
automation and advanced tools ensuring safe
working without undue pressure.
12Concept Story Board
Developing SESAR
13ATM Operational Roadmap
14ATM Operational Services
15Working Together on Validation ?
- Validation opportunity - partnering with projects
? - Identify suitable projects, negotiate the
opportunity - Look at the WPx.3 (integrated validation)
- Bring the issue directly (back) to the SJU.
- Clearly Articulated
- Justified
- Proposals
16Validation Opportunity
17Conclusion
- A Private Public Partnership
- About change it will change our business and way
of working - Performance Based and Service Oriented
- Incremental Approach with Operational Steps and
ATM Operational Services - About information and information management, The
ATM Intranet - Information is the baseline for planning and
execution of the Business / Mission Trajectories - Validation through alliances with appropriate
projects?
17
18Thank you
www.sesarju.eu
EUROPEAN COMMISSION