LINK 2000 Workshop - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

LINK 2000 Workshop

Description:

Short Term Improvements must be Completed in Time - CPDLC ... (ADAS) International. OSED/SPR/ INTEROP. Trials/Sims Specs. Validation Reports. EUROCAE ... – PowerPoint PPT presentation

Number of Views:29
Avg rating:3.0/5.0
Slides: 12
Provided by: celisseppe7
Category:
Tags: link | adas | workshop

less

Transcript and Presenter's Notes

Title: LINK 2000 Workshop


1
LINK 2000 Workshop
October 10th-11th 2007 Building on LINK 2000
European Organisation for the Safety of Air
Navigation
2
Principles
The Long Term target is SESAR CONOPS and Full 4D
Short Term Improvements must be Completed in Time
- CPDLC
Medium Term CONOPS needed Urgently Initial 4D
All must be Aligned with SESAR NextGEN
3
Datalink Medium Term Context
4
Full SESAR Simplified View 20XX
Automation Upgrade
Full 2 way 4DT
Big Bang not feasible By 2015
New ICAO Messages
AOC
ATC
Airline
Automation Upgrade
ACC
SWIM
5
LINK 2000 by 2014
CDU
New FMS 500K
ATSU CMU
Services ACM ACL AMC
AOC
ATC
Airline
ACC
6
NextLINK Initial 4D by 201X
MCDU
ATSU CMU
Initial 4D
No New ICAO Messages
AOC
ATC
Airline
Automation Upgrade
ACC
Flight Plans
Trajectory Info
7
MEDIUM Term CONOPS
  • Strategy
  • Use available ground and air systems capabilities
  • Expand on Link2000 package
  • Target also TMA, Surface and Inter-Continental
    operations
  • Derive requirements for new applications to
    exchange FMS trajectory (e.g. ADS-C)
  • Develop operational procedures to allow
    air-ground negotiation
  • Lay foundation for full 4D Trajectory operations
  • What
  • Aircraft trajectory used for planning
  • Provides real-time updates of a/c intentions and
    distribution
  • D-TAXI (Pre-departure info, Start-up, Push-back,
    Taxi-out clearance)
  • FIS data-link services

Backbone for 4D data-link services
8
STANDARDS VALIDATION
  • EUROCAE/RTCA (WG78/SC-214)
  • Operational, Technical and Safety
  • ICAO (DLSG/ADG)
  • ADG defining future ICAO ADS-C and any CPDLC
    Additions needed
  • Coordinated with WG78/SC-214
  • Validation required
  • By Simulation
  • By Pre-Operational trials (e.g. PETAL 3 proposal
    from MAAS UAC)

9
Under Development
Management/Decision Cell
INITIAL 4D Segment 2
OPS CONCEPT (ADAS)
MEDIUM TERM CONOPS European OSED
DATALINK USER GROUP
Segment 3 Full 4D Develop
STANDARDS FAA Co-ord
International OSED/SPR/ INTEROP
EUROCAE/ RTCAICAO
Segment 2 Implementation Programme
VALIDATION Ops MAAS Tech - EEC
Trials/Sims Specs Validation Reports
Integration Team Episode 3
Increased Automation using Trajectories
10
Towards a Global System
  • LINK 2000 and the FAA CPDLC programme are in
    regular contact and will share the same
    Operational/ Technical Baseline
  • RTCA SC214 and EUROCAE 78
  • Initiatives targeting a single seamless system
    for Continental and Oceanic operations are
    underway
  • ICAO Datalink Steering Group (DLSG) and ATN
    Accommodation Drafting Group (ADG)

11
Good plans shape good decisions. That's why good
planning helps to make elusive dreams come
true- Lester R. Bittel, The Nine Master Keys
of Management -
Be Positive
12
A good plan implemented today is better than a
perfect plan implemented tomorrow-George S.
Patton-
Be Realistic ..
Write a Comment
User Comments (0)
About PowerShow.com