Title: Cryo Capture Cavity II Progress


1
Cryo Capture Cavity II Progress
  • Mike McGee
  • April 13, 2005

2
Status at Fermilab
  • Modifying helium vessel clamp design to
    accommodate type III helium vessel
  • Designing shipping/installation fixture
  • Designing helium return pipe reducer and flanged
    connection
  • Preparing for dry fit of assembly into vacuum
    vessel
  • Ordering stainless steel materials for
    transitions, spool and fixture
  • Preparing overall assembly procedure for Cryo
    Capture Cavity II during various stages

3
Comparison of helium vessels
  • Providing clearance for helium vessel tabs (4)
  • Providing clearance for return pipe feed from
    helium vessel

4
Modified helium vessel clamp
  • Modification areas are shown in red (note return
    pipe is actually rotated 45 degrees)

5
Openings for helium vessel clamps
  • 4 openings in magnetic shielding per helium
    vessel clamp
  • Will provide DESY with shielding drawing of
    opening placement by Thursday

6
Magnetic shield opening detail
  • 4 screw cut-outs and 4 pad cut-outs

7
Modify 80K shield
  • Horizontal orientation for both valves
  • Cut holes in 80K shield

8
Modify VAT valve
  • Machine off hex head and cut square (for use with
    ratchet extension) on VAT valve spindles

9
Existing Tuner
  • Stepper motor interferes with bottom of US VAT
    valve
  • Use of mirrored DESY tuner

10
Dry fit at Fermilab
  • Assemble transitions and pseudo VAT valve spools
    with existing cavity on installation fixture

11
Dry fit at Fermilab
  • Insert assembly into vacuum vessel off horizontal
    axis

12
Dry fit at Fermilab
13
Low radial profile end flange design
14
Assembly for DESY
  • Send to DESY (May 2005)
  • Cleaned US and DS warm-to-cold transitions and
    spool

blank flange
  • Under argon positive pressure

valve w/filter
15
Assembly for DESY with fixture
  • Assembly sent to DESY in crate with shipping
    fixture

16
VAT valve support
17
Assembly shipped from DESY
  • Assembly
  • Cavity and helium vessel
  • Spool between VAT valve and cavity
  • Mirrored tuner
  • Magnetic shield
  • Input coupler
  • US DS Warm-to-cold transitions and spool

18
Install cavity assembly into vacuum vessel
  • Use of monorail with end supports
  • Insert off horizontal axis

19
DS warm-to-cold transition
20
US warm-to-cold transition
21
Shipping fixture baseline vibration study
en-route from DESY
  • We need baseline information of overseas shipping
    for Capture Cavity II and other devices
  • Media Recovery Shock-Log
  • Provides acceleration measure in x, y and z
  • Custom software provided is Windows compatible
    for use with laptop

22
Shock-Log Use
  • Features ability to optimize sample rate based on
    trip duration
  • Also features a wake-up threshold if a specified
    acceleration is exceeded
  • US Customs, Air Carriers and Homeland Security
    are more likely to allowable a commercial device
    rather than one homemade
  • Checking on acceptance by US Customs and Homeland
    Security
  • Cost of device with software 2,400