US CMS EMU FNAL - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

US CMS EMU FNAL

Description:

Lab 8 Production - Chamber Alignment Yuri. Gluing Machine - Progress on Setup Oleg ... Yuri/Sergei Lusin R&D on Strip Photogrammetry ... – PowerPoint PPT presentation

Number of Views:59
Avg rating:3.0/5.0
Slides: 8
Provided by: giorgioap
Category:
Tags: cms | emu | fnal | yuri

less

Transcript and Presenter's Notes

Title: US CMS EMU FNAL


1
US CMS EMU - FNAL
  • Agenda
  • CERN CMS EMU Meeting Report Giorgio
  • Activities Assignments Giorgio
  • Lab 8 Production - Chamber Alignment Yuri
  • Gluing Machine - Progress on Setup Oleg
  • PNPI Positioning Device Adam

2
US CMS EMU - FNAL
  • 8-99 9-99 Activities Assignments (Physicists)
  • Start Chamber Production in November 99
  • Oleg Prokofiev RD on RTV-Polyurethane Sealing
  • Gluing Machine to Production Readiness
  • Panels Travelers
  • Adam/Pawel Bujak Setup of FNAL Tension Tester
  • Setup of PNPI Tension Tester
  • Setup of FNAL Capacitance/Resistance Monitor
  • Yuri Pischalnikov Lab 8 Production Monitor
  • RD on Authomatized Strip Position Meas.
  • Yuri/Sergei Lusin RD on Strip Photogrammetry
  • Giorgio Apollinari Winding Machine to Production
    Readiness

3
US CMS EMU - FNAL
  • 9-99 Activities Assignments (Physicists)
  • MP9 - Start Chamber Production in November 99
  • Oleg Prokofiev Tooling Procedures Chamber
    Travelers P2 Modification
  • Giorgio Apollinari Winding Machine Procedures /
    P2 Modification
  • Yuri Pishialnikov Database specifications
  • Lab 7 - P2 Integration
  • Sergei Medved Setup of P2 DAQ
  • Proper grounding setup (HV Faraday Cage,
    LV..)
  • Y.Y.Wang/DAQ Expert Lab 7 activities
  • Dave Eartly Alignment Readout Setup

4
US CMS EMU - FNAL
  • (Quick) CERN EMU Meeting Report
  • Chamber Performance/Issues
  • Chamber worked
  • 100 fC at 3600 Volts on Cathode (noise 2 fC),
    Anode efficiency plateau starts at 3400 Volts,
    chamber operational up to 4000 Volts in all
    segments except one (see below).
  • 200 mm wire design OK.
  • Good Gain uniformity in the small region
    measured with beam.
  • Unknown Leak Rate.
  • One Segment (4-3) sparking at 3.6 kV and GIF
    operational
  • Lack of path to ground for cathode strips in the
    event of a disconnected cable.

5
US CMS EMU - FNAL
  • Electronics/Integration Issues (related to FNAL
    Factory)
  • Cathode/Anode Electronics
  • Cathode Saturation problem solved. Baseline still
    shifting, but correctable by pedestal
    presampling.
  • Cathode Electronics Grounding scheme
    unsatisfactory.
  • Insufficient Protection for Anode/Cathode
    electronics.
  • Segment 4-3 zapped 2 Cathode chips and few(?)
    Anode channels.
  • LV/HV/Cables
  • HV
  • Vicor LV too noisy
  • Cables not integrated properly

6
US CMS EMU - FNAL
  • PLANS
  • Integration at FNAL-Lab 7 in Oct-Nov 99 with P2
    from CERN
  • Factory resources to Integration if needed
    (G.Mitselmakher)
  • Single point connection scheme
  • Faraday Cage around all elements (chamber,
    electronics, cables,..)
  • Single point connection between Faraday Cage and
    chamber/electronics/ ground.
  • S. Lusin in charge. Plan to meet on Wednesday
    after FNAL factory meeting with connections to
    UCLA (Y. Bonushkin) Ohio (TY Ling), UF (Andrey),
    and UW (Dick, Farshid, Ken, Phil).
  • 130 230 FNAL Chamber Factory Meeting
  • 230 330 Lab 7 Integration Meeting

7
US CMS EMU - FNAL
  • Chamber Issues for Integration/Production
  • P2 Modifications/Checks
  • Check Leak rate at arrival.
  • Open chamber and (try to) fix segment 4-3.
  • Insulated Faraday Cage around the chamber.
  • Modified Anode Protection Board.
  • N. Bondar to complete tests by Oct. Only change
    in components value are expected.
  • Provide resistive path to ground for Cathode
    Strips
  • Conductive Paint (?)
Write a Comment