Title: Validation of CSCs at FNAL
1Validation of CSCs at FNAL
- Why we decided to proceed with CSC Validation
works? - 1. We have not enough testing experience in EMU
CMS project.. - 2. At the time, when FAST sites will be able to
test CSCs at full speed - FNAL already will assemble 25-40CSCs. And this
is wrong not to have quick feedback to
production floor - 3. Production Readiness Committee strongly
recommend to test at least 20 CSCs at FNAL. in
parallel with production
2CRTS at LAB711 scale prototype of FAST site
Trigger Scintillating
Counters
Picture of FNALs CRTS - as a full scale
prototype of UF and UCLA FAST sites , during
last couple years role of LAB7 facility was test
of first several prototypes, troubleshooting
before CERN test-beam, etc
Today this is facility for CSC integration
efforts Validation of 20 first production CSCs.
3CSC VALIDATION Tests
- 1. HV scan of all 6 planes with/without Cs137
- (darksource currents)
- 2. Gas gain non-uniformity with Cs137 source
(HV3700V)
- 3. ZERO DEAD channels (anode cathode)
- 4. Anode wire groups (64group/plane) efficiency
measurements - 5. Single wire (group) noise rate (TDC)
- 6. Gas gain non-uniformity with Cosmic Rays
measurements (CFEB)
42. Gas gain uniformity measurementswith Cs137
source (HV3700V).
Cs137 measurements correction according
radiation profilefor one layer
(layer6,ME23/2-003)
5Cs137 .vs. Cosmic Rays(ME23/2-003)
layer 1
layer 3
Cosmic Rays
Cs137
6Cosmic Rays .VS. Cs137
Gas Gain non-uniformity for ME23/2-003Cs137
Cosmic Rays
Correlation between Cs137 Cosmic ray
74. Anode wire groups (64group/layer) efficiency
measurements
84. Anode wire groups (64group/layer) efficiency
measurements
9Single wires group Noise (TDC)
10Summary
- Panels Production
- Production Rate and Quality of Panels are under
control - 100 of ME23/2 panels (for 148CSCs) will be done
next week !!! - Next step is start production of Panels for
PNPI(Russia) IHEP(China) CSCs Factories. - Chambers Assembling
- FNAL Factory reached assembling rate 2
chambers per month - 14 CSCs have been assembled at MP9 already
- Tooling, QC/QA, trained technical personal on
place (going through learning curves !!!) - CSCs Validation
- LAB7 CRTS facility is a place for 20 CSCs
Validation work - We have tested 9 CSCs already, and accumulated
important experience for FAST Sites operation - Results from test of 9 CSCs shown NO SURPRISE
- Support of Foreign Factories
- FNAL designed, built and ship critical tooling
to Russia and China - Trained at MP9(FNAL) technical personal for
foreign factories tech. from R.C. built
ME1/22/11/33/1 prototypes at FNAL physicists
from RC participated at FAST sites planing and
development