NORTH WILSON ROADPROPOSED IMPROVEMENTS
  • Public Meeting No. 2
  • November 19, 2009

2
GOALS FOR TONIGHT
  • Review results of Public Meeting No. 1.
  • Discuss project schedule.
  • Review results of traffic analysis.
  • Review design concepts and alternatives prepared.
  • Solicit input and answer questions.

3
Where We Have Been
  • First public meeting held to explain scope of
    project.
  • On-line surveys and graphics used to identify
    concerns and get suggestions on ways to address
    the problems.
  • Traffic counts and survey work initiated.

4
Where we are heading
  • Traffic study in final stages.
  • Preliminary engineering concepts created and
    ready to discuss.
  • Preliminary cost estimates prepared.
  • Survey work continuing.

5
WHERE WE WANT TO BE
  • Select engineering concepts to advance.
  • Prioritize improvements based on cost-benefits.
  • Determine what can be done based on available
    funding.
  • Final plans for construction ready for October or
    November 2010 letting.

6
HOW DO WE GET THERE
7
PROJECT SCHEDULE
  • DECEMBER
  • Complete preliminary engineering phase Establish
    priorities.
  • JANUARY-FEBRUARY
  • Advance plans to Right of Way stage, request
    funds be authorized to purchase Right of Way.
  • FEBRUARY
  • Hold next public meeting.
  • Discuss final design and Right of Way impacts.
  • MARCH
  • Begin Right of Way acquisition process.
  • Begin utility design and relocation process.

8
PROJECT SCHEDULE
  • MARCH-AUGUST
  • Complete final design.
  • Complete Right-of-Way Late 2010
  • Advertise Contract for Construction Spring 2011
  • Construction Complete by end of 2011

9
RESULTS OF PUBLIC MEETING NO.1 AND ON-LINE
SURVEY
10
SUMMARY OF SURVEYS
  • Two areas of congestion US 31W Elm Road
    North Wilson Road area and US 31W West Lincoln
    Trail Boulevard intersection.
  • Desire for sidewalks.
  • Safety issues Spring Street area and cut-thru at
    tank.
  • Minimize impacts to businesses.

11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17
(No Transcript)
18
(No Transcript)
19
(No Transcript)
20
(No Transcript)
21
TRAFFIC ANALYSIS
  • Existing slip ramp.
  • Elm Road intersections with North Wilson Road and
    US 31W.
  • North Wilson Road intersection with West Lincoln
    Trail Boulevard (relocation to the west).
  • Spring Street and US 31W.
  • New concepts (loop ramp, relocation of Wilson
    Road to the west).

22
DESIGN CONCEPTS UNDER CONSIDERATION
23
INSERT ALIGNMENT 1 (ALONG EXISTING)
24
INSERT US31W-ELM ROAD-NORTH WILSON ROAD DETAIL
25
INSERT NORTH WILSON ROAD-WEST LINCOLN TRAIL
INTERSECTION DETAIL
26
(No Transcript)
27
(No Transcript)
28
Alignment 1 Widen Existing
29
SUMMARY
  • Insufficient funds available to widen North
    Wilson Road from West Lincoln Trail to the
    overpass.
  • Prioritize based on cost-benefit for each
    segment.
  • Final design will focus on minimizing impacts
    make go as far as possible.