Title: Bunch Compressor 3
1Bunch Compressor 3
- Torsten Limberg for Frank Stulle et al.
2Basic Bunch Compression Mechanism with Magnetic
Chicane
Ds -R56d
3TTF-II Compression System
Two stage compression to avoid space charge
emittance dilution on one hand and reduce
non-linear effects from the RF system on the
other.
BC2
BC3
BC2
BC3
4BC-3 Lay Out
R56 0.025 - 0.1 mm
5Incoming optics matching section
6First half of S-bend
72nd part of S-bend
8Outgoing matching section
9Horizontal Dispersion in BC-3
10Optics of BC-3
11Longitudinal Phase Space Evolution
12TraFiC4 results slice emittance and projected
emittance development through BC-3 for different
designs
13Transverse emittance, peak current, mean energy
of longitudinal slices and energy spread along
the bunch at the undulator entrance (ca. 60 of
the bunch saturates _at_ l6nm)(s gt 0 corresponds
to the bunch tail)
14TTF-II Starting Scenario (l30nm)
BC2
BC2
BC3
15Transverse emittance, current, energy spread
along the bunch and longitudinal phase space at
entry of BC-2(E. Schneidmiller et al.)
16Transverse emittance, current, energy spread
along the bunch and longitudinal phase space at
exit of BC-2
17Transverse emittance, current, energy spread
along the bunch and longitudinal phase space at
exit of BC-3 (including CSR effects in 1-d model)
18Transverse emittance, current, energy spread
along the bunch and longitudinal phase space at
entry of undulator (including space charge
effects in upstream drift)
19Peak current vs. transverse emittance for given
slice energy spread and saturation at the end of
the undulator (l30nm, 30 safety)
20Status of Instrumentation (D. Nölle)
- Strip lines (4) April 03
- Pickup Array (2) feed throughs
ready for assembly - Toroids (2) March 03
- OTR Stations Standard (2) Feb 03
- OTR Special _at_ 75 m OTR System OK,
chamber not ordered - _at_ 78 m design done, window
flanges, screen and optical system need to be
procured - Resistance Monitor April 03
- Phase monitor March 03
21Vacuum Chamber Support Status
22Summary
- BC3 design complete and fabrication of components
mostly on schedule - Two operating scenarios for the bunch compression
system - With 3rd harmonic RF
- Full start to endsimulation done, lases at 6 nm
- For start up No 3rd harmonic RF, lower energy
- Start to end simulation begun, lases at 30 nm