Progress in Accumulator and Compressor Ring Studies - PowerPoint PPT Presentation

1 / 19
About This Presentation
Title:

Progress in Accumulator and Compressor Ring Studies

Description:

Drift Collimator Achromat. Congestion problems in certain regions: Searching alternatives to Collimator Achromat : Bunch Stretching with Wiggler Modules ... – PowerPoint PPT presentation

Number of Views:63
Avg rating:3.0/5.0
Slides: 20
Provided by: ger64
Category:

less

Transcript and Presenter's Notes

Title: Progress in Accumulator and Compressor Ring Studies


1
Progress in Accumulator and Compressor Ring
Studies
H. Schönauer
  • Transfer Lines SPL - Accumulator
  • (Microbunch Stretching, Jitter Compression,
  • Momentum Collimation, Space Constraints)
  • Feasibility of lower Repetition Rate lt75 Hz
  • at present ? 50 Hz
  • H- Injection at 50 Hz
  • Foil Heating

2
Studies of the Proton Driver Rings
  • The charted territory
  • of the CERN NF
  • SPL
  • PDAC (Proton Driver
  • Accumulator- Compressor
  • in ISR tunnel)
  • Extraction towards
  • target station

3
Proton Driver Accumulator - Compressor
Evolution of the 4 MW Scenario
0) Isochronous Rings 1) PDAC 1 High ?
Accumulator Compressor 2 GeV, 100 Hz, 12
bunches, H- Injection 600 turns 2) PDAC 2 2.2
GeV, 75 Hz, 140 bunches RF 44 Mhz, matched to
Muon Cooling Front End 3) PDAC 2 bis 50 Hz H-
Injection 820 turns (?)
4
PDAC Layout in ISR Tunnel
5
Layout of the transfer line
6
  • Transfer Lines presently under study
  • SPL to Accumulator
  • Drift Collimator Achromat
  • Congestion problems in certain regions
  • Searching alternatives to Collimator Achromat
  • Bunch Stretching with Wiggler Modules

7
Effect of SPL Jitter AFTER debuncher 230m
drift buncher (180ps bunch length, matched
beam)
8
Momentum Collimator Achromat fitting in ex-ISR
Tunnel
9
Momentum Collimator Achromat fitting in ex-ISR
Tunnel
10
Wiggler Section for Microbunch Stretching
NF Note 069, Autin, Giovannozzi, Martini, Royer
Doubles the bunch stretching w.r.t. free
drift -gt 130 ps Provides Dispersion Bump
D20m -gt Replacement of Collimator Achromat in
the SPL to ISR tunnel ?
11
Effect of Repetition Rate on the Accumulator
12
ACCSIM Simulation of H- Injection in the 50Hz
Accumulator First 5 Turns injected
13
ACCSIM Simulation of H- Injection in the 50 Hz
Accumulator 820 Turns (End)
14
ACCSIM Simulation of H- Injection in the
Accumulator 100 Turns (Zoom)
15
ACCSIM Simulation of H- Injection in the 50 Hz
Accumulator 820 Turns (End)
16
ACCSIM Simulation of H- Injection 820 Turns
with refined space charge calculation
17
ACCSIM Simulation of H- Injection Energy
Deposition in the Foil (750 ??g/cm2 C)
The average number of foil traversals depends
strongly on the foil margin 1 mm... 1 2.1
traversals 2 mm... 1 4.9 traversals
Energy deposit (MeV/mm2)
(82000 Superparticles)
18
Alternative ScenarioCERN 4 MW 30 GeV / 8 Hz
Proton Driver
ISR Tunnel
180 MeV H- linac
Collimator Achromat
2.2 GeV / 50 Hz Booster R37.5m
19
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com