Injector, Sector 21, Bunch Compressor 1 - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Injector, Sector 21, Bunch Compressor 1

Description:

Title: Injector, Sector 21, Bunch Compressor 1 Subject: Final Design Review Author: Paul Bellomo Last modified by: Kristi Luchini Created Date: 4/22/2004 6:04:17 PM – PowerPoint PPT presentation

Number of Views:51
Avg rating:3.0/5.0
Slides: 13
Provided by: PaulBe70
Category:

less

Transcript and Presenter's Notes

Title: Injector, Sector 21, Bunch Compressor 1


1
Status of the LCLS Magnet PS Controls Needed for
First Injection Injector, Sector 21 and BC1 P
Bellomo / A de Lira / K Luchini / D MacNair /
Others
2
Background
  • Hardware Final Design Review March 30, 2006
  • Magnet list in the Hardware FDR
  • 89 new magnet control systems
  • 6 Intermediate (10kW or 20 kW)
  • 83 Small (480W or 1.5kW)
  • 1 modified existing QE system in Sector 21
  • Software Final Design Review in September

3
New Magnet Control Systems in B24
4
Sector 21 QE System Modification
5
New Systems Hardware Status
  • Magnets
  • November installation
  • DC cables
  • Phase 1 installed, Phase 2 completed by
    mid-December
  • Racks, power supplies, PS controllers, terminal
    server, VME/PLC crates and modules for small PS
  • All in B24, except 200V, 50A SOL2 power supply
    due September 15, 2006. 15 new MCOR12/6s replace
    MCOR30s
  • PLC, 90 of VME modules here and installed,
    remainder October
  • Move all to Sector 20 on September 15
  • AC Power
  • Panel-boards exist, CBs and conduit installation
    Sep 25 Oct 16

6
Modified S21 QE System Hardware Status
  • Magnets, DC cables and racks
  • 3 feet Bulk PS to new isolation and
    reversing/shorting switch chassis
  • Power supplies and controllers
  • QE21201/301 reversing/shorting switch chassis
    fabricated and bench tested.
  • Bulk PS isolation switch chassis fabricated by
    9/30
  • Install first week of October
  • CAMAC crates and modules exist
  • AC Control Power
  • Exists

7
New Systems Design Documentation Status
  • DC Cables
  • EIs (Change some MCOR30s to MCOR12/6s), CAPTAR
    list, power supply spreadsheet
  • Racks, power supplies, PS controllers VME/PLC
    crates, modules and terminal server
  • Specifications, front views and manufacturers
    drawings/manuals, EPICS/VME integration documents
  • PLC wiring diagram undergoing some changes
  • CB hazard analysis completed requested labels
    from CEF
  • Manuals, cable lists
  • AC Power
  • One lines, panel-board schedules

8
Modified S21 QE System Design Documentation
Status
  • DC cables
  • On modified EI diagram
  • Racks and accessories
  • Existing one front view needs updating
  • Power supplies and controllers
  • Bulk PS Isolation chassis and QE201/301 magnet
    reversing / shorting switch chassis wiring
    diagrams
  • AC power
  • Existing 120VAC control

9
New and Modified QE Systems Software Status
  • Software
  • SLC 90 complete
  • SLC Aware coding is complete and debugging 50
    done
  • Displays
  • SCP done
  • EDM
  • Test displays done
  • Mockups 80 done
  • Main displays 30 done
  • Databases
  • SLC All new units added to SLC database (MCOR30
    to MCOR12)
  • EPICS
  • Templates and databases 90 done
  • Substitution databases are 40 done
  • Polynomials are 25 done

10
New Systems - B24 Testing Status
  • Purpose Verify wiring, basic operation as
    integrated systems
  • Controller-Power Supply-Local Mode (25 done)
  • BX01, 02 and BXH1,2,3,4 successfully tested
  • In process testing PLC, 3 MCOR bulk power
    supplies, MCOR12/30s
  • Then test BXS, SOL1, SOL2, and BX11,12,13,14
  • Network/Controller Integration (25 done)
  • Network/EPICS integration with Intermediate PS
    Controllers
  • VME integration with MCOR12 and MCOR30
    controllers
  • Remote Mode Network/Power Supply Integration
  • Completion September 15, 2006

11
New Systems - Field Test Plan
  • Three weeks needed in November-December timeframe
  • Hi pot DC cables
  • DC cable / magnet polarity checks B and V
  • Run Intermediates in Local Mode to verify
    transductor polarity
  • Run Intermediates and MCORs in Remote Mode
  • Addressing is correct
  • Voltage and current compliance
  • All readbacks are functional
  • Klixon, water flow, ground current interlocks
    function and display correct status
  • Tune response of each system

12
Modified S21 QE System Test Plan Last Slide
  • Test Plan
  • Initial tests 1 week, 2nd week October. Check
    field wiring, isolating and reversing/shorting
    switch functionality,
  • Use 3 small (lt 50V, less than 10J) power supplies
  • Force EMHP controller bit to SLC/LCLS modes see
    table
  • Integrated tests 1 week, Nov-Dec. Check
    SLC/LCLS modes from SCP see table

Bit Bulk PS Q21201 Q21301
SLC I I I
LCLS 0 -I 0
Write a Comment
User Comments (0)
About PowerShow.com