Vertically Integrated Optical Testbed for Large Application - PowerPoint PPT Presentation

1 / 21
About This Presentation
Title:

Vertically Integrated Optical Testbed for Large Application

Description:

Vertically Integrated Optical Testbed for Large Applications in DFN ... Peter Kaufmann (DFN-Verein) Kaufmann_at_DFN.DE. Ferdinand Hommes (FhG/IMK) ... – PowerPoint PPT presentation

Number of Views:279
Avg rating:3.0/5.0
Slides: 22
Provided by: Kauf3
Category:

less

Transcript and Presenter's Notes

Title: Vertically Integrated Optical Testbed for Large Application


1
Vertically Integrated Optical Testbed for Large
Applications in DFNImplementation of a testbed
for optical networking as a cooperation of
industrial and research partners Peter
Kaufmann (DFN-Verein)Kaufmann_at_DFN.DEFerdinand
Hommes (FhG/IMK)Ferdinand.Hommes_at_IMK.FRAUNHOFER.D
E November 2005 www.viola-testbed.de
VIOLA
2
Project and Partners
  • Organized as consortium, Leader DFN-Verein
  • Members of consortium
  • Alcatel SEL AG, T-Systems International GmbH,
  • Siemens AG, FhG (IMK, SCAI),
  • FZ Jülich, Stiftung caesar,
  • Univ. Bonn, FH Bonn-Rhein-Sieg (U Appl. Sc.)
  • RWTH Aachen
  • Associated partner GasLINE, Navtel, Univ.
    Erlangen
  • Term of Project 3 Years
  • Start of VIOLA June 2004
  • Funding ca. 11 M from BMBF (Ministry of
    Research)
  • Total costs ca. 20 M

3
General Goals (1)
  • Test evaluation of current developments of
    netwoking technology including signalling
    management
  • State-of-the-art (pre-)products of industrial
    partners
  • Signalling mechanisms and interfaces
  • Wide area field tests, laboratory environment for
    specific tests
  • Preparation for X-WIN of DFN (successor of G-WIN)
  • Call for tender for fiberWDM late 2004
    implementation since Summer 2005
  • Implementation of (new) routing/switching
    equipment in 2006/07
  • Implementation as a stepwise process with
    increasing service complexity
  • Implementation of a vertical testbed
  • Applications
  • Middleware tools
  • Optical transport technology for IP, SDH and GE

4
Testbed Topology
5
Components Connections
6
Equipment (1)
  • Equipment and Connectivity offers
  • Different SDH-domains
  • In triangel in parallel with up to 10 Gbps
  • SDH-connectivity and
  • L2-Ethernet-connectivity
  • User access with n GE
  • e2e-connectivity via L2-service or via
    L2/SDH-service

7
Equipment (2)
  • Alcatel 1678 (SDH-Cross-Connect)
  • Interfaces up to 10 Gbps-SDH (STM-64) and GE,
    with GFP
  • Signalling OIF/UNI-N 1.0 R2 and E-NNI
  • Alcatel 7750 SR (Router)
  • Interfaces up to 10 Gbps-SDH, GE and 10GE,
    L2-Service VPLS (H-VPLS)
  • Riverstone 15008 (GE-Switch)
  • Interfaces GE and 10GE, L2-Service VPLS
    (H-VPLS)
  • Siemens SURPASS hiT 7070 (SDH Cross-Connect)
  • Interfaces up to 10 Gbps SDH (STM-64) and GE,
    with GFP
  • Signalling I-NNI, Cross-connect capacity 160
    Gbit/s
  • Siemens/Sycamore Networks SN16000 (SDH
    Cross-Connect)
  • Interfaces up to 10 Gbps SDH (STM-64),
  • Signaling E-NNI, I-NNI, OIF/UNI 1.0 R2,
    Cross-connect capacity 2.5 Tbit/s

8
Network Signalling (1)
Applications
GRID Virtual Reality
Layer 2 Services
Layer 3 Services
Layer 3 VPNs
VPLS/HVPLS
Layer 2/3 Switch/Router
GFP/LCAS
SDH Cross Connects
MPLS
GMPLS / UNI / I-NNI / E-NNI
DWDM
CWDM
Fiber
(GMPLS , all optical Switch)
9
Network Signalling (2)
  • Interworking in optical transport networks
  • Signalling concepts analysis and test them,
  • contribution to specification
  • GMPLS for IP-based control plane (IETF)
  • ASON / ASTN (Automatic Switched Optical/Transport
    Network, ITU)
  • UNI for user controlled signaling and E-NNI
  • (Optical Internetworking Forum, OIF)
  • Interoperability at UNI/NNI (OIF)
  • I-NNI-GMPLS-Interface

10
Network Signalling (3)
  • First Signalling-Results
  • GMPLS with Soft-Perm-Conn at Alcatel-CC1678 in
    operation
  • OIF-E-NNI at Alcatel-CC1678 and Sycamore-CC
    SN16000 available
  • OIF-UNI 1.0,R2, network side at Alcatel-CC1678
    available
  • OIF-UNI 1.0,R2, network side at
    Sycamore-CC-SN16000 available
  • OIF-UNI 1.0,R2, client side Late 2005
  • OIF-UNI 2.0, planned for 1Q 2006 at Alcatel and
    Siemens CC
  • Interworking tests of OIF-E-NNI between
    Alcatel-CC1678 and
  • Sycamore-CC-SN16000 some problems
    (interpretation of Unicast/Multicast OSPF-Packets
    when using IP-tunnels)

11
Network Signalling (4)
  • Provision of Ethernet-Service over SDH with
    bandwidth adjustment (New SDH GFP, LCAS, VC).
  • GFP Generic Framing Procedure (ITU-T G.7042),
    method to transport data packets (e.g. Ethernet)
    over SDH
  • LCAS Link Capacity Adjustment Scheme (ITU-T
    G.7041), dynamical bandwidth adjustment for
    SDH-links (variable VC4-container)
  • Virtual Concatenation (VC) instead of Continuous
    Concatenation (CC) VC4-Container may use
    different ways in the transport network
  • First New-SDH-Results
  • Basic tests/interworking between Alcatel-CC-1678,
    Siemens-CC-hiT7070 and ADVA-GE-MUX-1500
    successful
  • LCAS tests in 4Q 2005

12
Network Signalling (5)
  • Operation of L2-Subnetworks
  • VPLS, H-VPLS (Hierarchical Virtual Private LAN
    Service)
  • Based on Riverstone15008 and Alcatel-7750,
    connected via SDH-Equipment (Alcatel-CC 1678) or
    directly with 10GE-LAN-Phy
  • Test Performance, Functionality
  • First L2-Results
  • VLL and VPLS OK
  • H-VPLS Problems, Alcatel/Riverstone not fully
    compatible
  • Interworking Ether Flow Control between
    L2/SDH-Switches OK
  • QoS-Fkt. for b/w limitations (Shaping,PolicingIng
    ress,Egress) OK

13
Network Signalling (6)

14
Network Signalling (7)
  • Development of interfaces for user controlled
    signalling

15
Project Goal Middleware
  • Implementation of an operational environment for
    PC-cluster based on UNICORE
  • UNICORE supports the operation of a Compute-Grid
  • Interoperability with Globus-toolkit and
    compatibility with OGSA (Open Grid Services
    Architecture) is planned
  • Development / Portation of missing components
  • Development of a Meta-Scheduler based on Global
    Grid Forum Standards (Grid Resource Allocation
    Agreement Protocol)
  • Portation of MetaMPI and integration in UNICORE
  • Adaptation/upgrading of local tools to connect
    and analyse distributed applications
  • Development of high-performance
    parallel-I/O-interfaces (main memory, file
    server)

16
Project Goal Applications (1)
  • Usage/upgrading of (existing) applications with
    high and dynamical transfer requirements (e.g.
    e-science / Grid)
  • Several GE-tunnels per application
  • Dynamical requirement of bandwidth with
    guaranteed QoS
  • User controlled networks (E2E)
  • Integration of real users
  • Variable requir. (time,size,quality) for
    stress-test of network equipment
  • Based on experiences with new networks
  • Creation of new ideas for applications
  • Motivation of user groups for GRID-technology

17
Access of Applications to the Transport Network
18
Distribution of Costs/Funding
19
International Aspects
  • DFN participates in EGEE (Enabling Grids for
    e-science in Europe)
  • international Grid-Infrastructure based on
    existing networks
  • VIOLA-Participation (DFN, TSI, Uni Erlangen) in
    FP6-projects
  • GN2 - Geant2
  • MUPBED - Multi-Partner European Testbeds for
    Research Networking
  • The testbed VIOLA forms the national base to
    contribute successfully to international projects
  • Interested for cooperation with similar
    projects/activities in Europe and elsewhere

20
Status (1)
  • Testbed implementation was finished early 2005
  • circuits are connected (including connection to
    G-WIN/GEANT)
  • equipment is installed
  • network management is operational
  • Work items of Transport Signalling have been
    started
  • I-NNI Available for Siemens-CC-hiT7070
  • E-NNI Available for Alcatel-CC-1678 and
    Sycamore-CC-SN16000
  • E-NNI interoperability tests between Alcatel
    Sycamore
  • UNI-N 1.0 R2 Available for Alcatel-CC-1678
  • GFP/LCAS-Tests between Alcatel-1678
    Siemens-hiT7070
  • E2E Specification of user interface design of
    reservation system

21
Status (2)
  • L2-Test/Operation
  • VLL/VPLS interoperability tests with Alcatel
    Riverstone OK
  • H-VPLS interoperability tests with Alcatel
    Riverstone Some problems
  • Initial version of middleware is deployed,
    Integration of new middleware components in
    progress
  • Application projects have finished preparatory
    work
  • First runs over the network have been made
  • Applications are beginning to stress network
    middleware.
Write a Comment
User Comments (0)
About PowerShow.com