Title: 7 march 2002
1COST 350 - 2nd Management CommitteePRESENTATION
- SWITZERLAND SpeakerAndré-Gilles
DumontProfessor in the Swiss Federal Institute
of Technology, LausanneDirector of the LAVOC -
Laboratory of Traffic Facilities
2What is your first and second reaction on the
technical annex Cost 350 ?
- Some keywords very interesting
- - sustainability
- - environment and transport infrastructure
relationships - - various decision-making levels
- - policy maker
- - COST 341
- Many domains
- Needs for practicals tools
3What is your reason to join Cost 350 ?
- Research
- - Coordination or continuation with others
LAVOC s researches, like ... - Manual Security Fauna-Traffic (4 editions in 6
years!) - Interactions between Fauna network and
Transportation network (Switzerland - 2001) - COST 341
- Thesis Multicriteria methods and concertation
in the roads infrastructures design (LAVOC -
M. Tille - 2001) - - futur researches
- - exchange with others countries / experiences
4What is your reason to join Cost 350 ?
- Swiss National Center of Competence
- - experience in 2 domains
- Road design
- Fauna and Transport Networks
- - Interactions between these networks
- Sustainability in the road infrastructures
- Teaching
- - disseminate the results for the
students/engineers - - post-graduate formation
5What is your profession, what is your field of
interest ?
- LAVOC - Laboratory of Traffic Facilities
- School of Civil Engineering
- Transport infrastructures
- ENAC
- School of Architecture, Civil and Environmental
Engineering - EPFL - Lausanne
- Swiss Federal Institute of Technology
6What is your profession, what is your field of
interest ?
- All the stages of the Road Life Cycle...
- Project design methodology / environmental
aspects - Construction methods / materials
- Maintenance pavement mangement system
- Management telematics / NTIC
- Many activities
- Teaching
- Research
- Laboratory - Expert
7What goals / aims / outputs should have priority
? (in COST 350)
- Integrate road infrastructure project
- - consideration of the environmentals aspects
in the project or the planification - at the beginning of the process
- during all the process
- .. as a chance, not a contraint
- Methodology
- - concertation / actors and relationships
- - multicriteria for decision-making
- - environmental aspects in the heart of the
process
8Which steps have to be made first in this Cost
Action ?
- Bring together representative actors
- - project managers of transport infrastructures
- - environment specialists
- - policy makers
- Levels
- - national regional / planification - project
- Define exactly
- - field and target of the research
- - state of the art actual pratice
problematic - needs
9What WG do you want to participate in ?
- WG 3
- - traffic characteristics
- - relationship with environment
- WG 4
- - Task 1 inventory of possible measures
- WG 5
- - Task 2 decision support models
- WG 7
- - further research requirements
10Swiss National network of Cost 350 interested
people
- Not yet created
- Nodes of the network
- - Research environment transport -
transport policy - - Swiss academic background
- - Administration national regional levels
- road railways - environment
- - Policies makers
- - Projects managers of infrastructures projects
- - Professionnals associations
- - Companies