Title: Prsentation PowerPoint
1PILOT PROJECT FOR ENERGY AND MINING ECONOMIC
BENEFICT FROM ASAL (DJIBOUTI) GEOTHERMAL AND
MINERAL RESOURCES
2INTRODUCTION
- The policy of the Government is to provide
assistance to any local and - foreigner investors to obtain permits/concessions
for geothermal and - mining exploration and then to evaluate and to
develop the potentiality - of the geothermal and mineral resources of the
country in general and - particularly in Asal.
- Commitment of the Government of Djibouti to
promote - the economical development of the Asal region
- Significant geothermal and mining resources
indicators - availability support theses objectives
- Pilot project proposal for geothermal and mining
development - for the new Asal development pôle
- As a lot of effort and money has been spent on
the geothermal exploration - work qt Qsql Djibouti is interested to plan and
build a pilot complex plant - to provide electric power and water to the
region. A pilot project could - also be used as a tool to train local staff for
larger geothermal plants
3GENERAL PRESENTATION OF THE REPUBLIC OF DJIBOUTI
- Area 23 000 km²
- Coast line 370 km
- Annual mean rainfall 150 mm
- Population 600 000 (65 in Djibouti)
- Urban population 82
- Natural growth rate 3
- Absolute poverty 20
- GDP 532.5 million
- Industry in GDP 3.8
- Agriculture in GDP 0.5
- Services in GDP 80
- Electricity production 260 GWh
4Energy production and new demands
Energy production 1971 - 2003
Forecast of Electricity demand
5Perspectives of new electricity demands
6Afar Depression. Horn of Africa
7INAKIR
ALOL
OBOCK
TAMATTAKO
ALFITA
Nth. GHOUBET
ARTA
DJIBOUTI
GAGGADE
S. GHOUBHET
ABHE
8(No Transcript)
9Asal Geothermal area Republic of Djibouti
ASAL 5
ASAL 4
ASAL 6
ASAL 1 3
ASAL 2
10Temperature profiles Asal geothermal area
Intermediate reservoir
ASAL6
11Interpretative section accross the Asal rift
Geothermal area
12ASAL-GOUBHET DEVELOPMENT PROJECT
S
Au
Geoth
Au
Au
Dock
P
13Geothermal well ASAL1 chemical analysis
Fluid analysis
Scree deposits analysis
14Preliminary data on gold in Southwestern area of
Asal
15Construction plan for the Dock in Goubet
16(No Transcript)
17(No Transcript)