Title: Department of Foreign Affairs
1Department of Foreign Affairs
- Strategic Plan
- 2008-2011
- Presentation to the
- Parliamentary Portfolio Committee on Foreign
Affairs - 12 March 2008
2DFA STRATEGIC PLAN 2008-2011
- INTRODUCTION
- The Strategic Plan doc covers the strategic
thrust of the work of the Department in the 2008
2011 MTEF - Our work continues to be guided by the decision,
priorities and policy guidelines emanating from
the January Cabinet Lekgotla and the State of the
Nation Address - The Strategic Plan document has thus been
developed guided by the amended Chapter 5 of the
Treasury Regulations in terms of Section 76 of
the PFMA - Political guidance given by the Minister and
Deputy Ministers has been invaluable in the
development of the Plan
3DFA STRATEGIC PLAN 2008-2011
- STRATEGIC THRUST OF DFA FOR 2008 - 2011
- The work of the DFA remains anchored on the
following overarching priorities - Consolidation of the African Agenda
- Strengthening of South-South Co-operation
- Strengthening of North-South Co-operation
- Participation in the Global System of Governance
- Strengthening of Bilateral and Economic Relations
- This work is supported by the following
activities - Organisational Strengthening
- Organisational Support
- Rendering of Professional Services
4DFA STRATEGIC PLAN 2008-2011
- Consolidation of the African Agenda
- SAs work will continue to focus on the
strengthening of African institutions both at
regional and Continental level - AU and its structures
- Implementation of NEPAD
- Strengthening of SADC
- Contribution to Post Conflict Reconstruction and
Development (PCRD) - Contribute towards peace, security and stability
in Africa - Strengthen Bilateral Relations with all African
countries - Support the hosting of the 2010 FIFA World Cup
5DFA STRATEGIC PLAN 2008-2011
- Consolidation of the African Agenda
- On the strengthening of the AU and its
structures- we will continue with efforts aimed
at - Harmonisation and rationalisation of RECS
- Consolidate support to PAP
- Construction of the Building set to start in the
current financial year - Need to also engage in evolving debate on the
eventual role of PAP ( Advisory legislative) - Operationalisation of AU Financial Institutions
and African Courts - Engagement of the African Diaspora
- SA to host Summit in October 08
- Strengthen AU-EU Relations
6DFA STRATEGIC PLAN 2008-2011
- Consolidation of the African Agenda
- Support the implementation of NEPAD
- Co-ordination internally in SA
- Manage the African Renaissance Fund
- Continue to advocate for the mobilisation of
continental resources - SADC
- SA is taking over as Chair of SADC in August 2008
- This presents both opportunities and challenges
as the region faces unique challenges as it
advances regional integration - It is clear that we have to focus on
strengthening bilateral ties with each SADC
country as a pre-requisite for the success of our
efforts
7DFA STRATEGIC PLAN 2008-2011
- Consolidation of the African Agenda
- SADC
- At a strategic level, SA has a vested interest in
a successful integration agenda in the region - Individual SADC member states have to confront a
variety of challenges largely imposed by their
objective economic situations which are currently
impacting negatively on the need for singularity
of purpose and action to advance regional
development - We also have a SADC that has residual areas of
instability that require careful management as we
move forward - By far - the most immediate challenges are to
engage and redirect the Integration agenda so
that it truly advances regional development and - Encourage peace and stability in the region
8DFA STRATEGIC PLAN 2008-2011
- Consolidation of the African Agenda
- SADC
- Focus of SAs Chairship will thus be to
contribute to the strengthening of SADC both in
terms of capacity and implementation of its
programmes - The current integration debate coupled with the
developments around the EU-EPA negotiations will
also be a key area of focus - Elections will also take place in several SADC
countries in the MTSF with Angola and Zimbabwe
set to have their elections in 2008 - SA will send its observers to these elections as
part of the SADC contingent
9DFA STRATEGIC PLAN 2008-2011
- Strengthen South South Co-operation
- Our work in this area will focus on the
strengthening of SAs engagement in multilateral
organisations of the South such as the G-77 and
China, and NAM - We will also engage with other south-south
groupings such as IBSA, NAASP, IOR, FOCAC, and
Africa-South America Forum - The growing interest amongst emerging developing
countries to have structured engagements with the
African continent has resulted to the formation
of the Africa- India Forum which will be
inaugurated in April 2008 in New Delhi, India
10DFA STRATEGIC PLAN 2008-2011
- Strengthen South South Co-operation
- More on IBSA
- SA hosted 2nd IBSA Summit last October and will
host a Ministerial Meeting in March 08 in
preparation for the 3rd Summit to be hosted by
India later this year - Marked expansion of areas of co-operation
- People to people dimension include
- Womens Forum
- Parliamentary Forum
- Journalist Programme
- Social Development/ Civil Society Forum
- Also academia and Business
11DFA STRATEGIC PLAN 2008-2011
- Strengthen North South Co-operation
- SAs engagement with the North is largely
informed by the - imperative of advancing the African Agenda as
well as broader - development interest of the South
- G-8
- TICAD
12DFA STRATEGIC PLAN 2008-2011
- Participate in the Global System of Governance
- SAs engagement in the global system of
Governance will continue to cover the political,
economic and social spheres of our work - Whilst our engagement as non-permanent member of
the UNSC will lapse at the end of 2008 - We will continue to advance our engagements in
other key areas of UN work - One of the key areas will be advancing the reform
of the UN - Another key issue that is proving highly topical
in multilateral debates especially due to its
cross cutting nature and impact is Climate Change - Govt is seized with the matter and necessary
co-ordination with key Departments is done
through the IRPS Cluster
13DFA STRATEGIC PLAN 2008-2011
- Participate in the Global System of Governance
- Briefly on SAs focus in the 2nd year of UNSC
seat - We will build on the achievements of 2007 which
include inter alia- - Leadership on African and thematic issues (Sudan,
Côte dIvoire and the DRC) - Revitalisation of the debate on Chapter VIII
institutions and the Council and the need for
closer co-operation between the AU Peace and
Security Council and the UN Security Council - SA co-leadership of the Security Council Mission
to Africa 2007 - Focus on women in peace and security small arms
and light weapons - Promoted African perspectives on Security Sector
Reform - Leadership on Timor-Leste
- Active engagement in UNSC subsidiary bodies e.g.
Counter-Terrorism Committee and 1540 Committee on
weapons of mass destruction and non-State actors
14DFA STRATEGIC PLAN 2008-2011
- Participate in the Global System of Governance
- UNSC seat 2008
- Particular focus will be
- To further advance the theme of enhancing
co-operation between the United Nations and
regional organisations in particular the AU - Under SAs Presidency of the UNSC in April 2008
a joint meeting of the UNSC and the AUPSC has
been organised - We will also continue to advocate for more
transparent and democratic working methods and
procedures in the UNSC - We are also continuously conscious of the
setbacks we experienced in our first year
particularly the negative media coverage over
SAs positions (Myanmar, Iran, listing of South
Africans on UNSC terror list) - A communications strategy has now been developed
to address this challenge
15DFA STRATEGIC PLAN 2008-2011
- Participate in the Global System of Governance
- Key Substance Issues in 2008
- Kosovo
- Visit by Counter-Terrorism Committees expert
support structure to South Africa (mid-2008) - Renewal of 1540 mandate
- Iran Middle East Lebanon/Syria
- DRC Sudan Western Sahara
16DFA STRATEGIC PLAN 2008-2011
- Disarmament, Non-Proliferation Arms Control
- Active role in disarmament, non-proliferation and
arms control in relation to both WMD and
conventional weapons - Promote and support non-proliferation of WMD,
whilst guarding against controls becoming a means
to deny countries access to advanced technologies - Active engagement in fora (IAEA UNSC) dealing
with situations of concern, including Iran and
the DPRK - Promote principled positions on the inalienable
right of all States to pursue advanced
technologies for peaceful purposes need to
preserve the credibility of the relevant
multilateral institutions (IAEA) and the UNSC
pursue peaceful, negotiated solutions to address
security concerns
17DFA STRATEGIC PLAN 2008-2011
- Middle East Peace Process
- South African profile increased over the last
year as witnessed in - Hosting of the UN Africa Meeting on the Question
of Palestine - May 2007 - US invitation to attend the Annapolis Peace
Conference November 2007 - French invitation to attend the Paris Donors
Conference in aid of Palestinian reconstruction
and development December 2007 - Hosting of PNA caretaker Foreign Minister and
Palestinian Ambassadors serving in Africa-
scheduled for April 2008 - Moving Forward
- South Africa will remain involved in capacity and
institution building in Palestine (On a bilateral
basis as well as through the IBSA and NAASP
forums) - DFA maintains that Palestinian unity is a
pre-requisite for progress in resolving the
Arab-Israeli conflict. Will engage with
Hamas/Fatah based on the principals of the Spier
process - South Africa will maintain pressure for Annapolis
Process follow up Conference in Russia to take
place and for the Israel-Syria negotiation track
to be opened
18DFA STRATEGIC PLAN 2008-2011
- Strengthen Political and Economic Relations
- Focus of SAs bilateral engagements has
traditionally been on the consolidation of
political relations - With bilateral political relations largely
solidified - Key challenge is to leverage SAs extensive
global diplomatic reach international political
standing to advance the countrys economic
interests - The focus during the MTSF will be on
strengthening of economic diplomacy in order to
respond the government's priority of growing the
economy to address our socio-economic challenges - Bilateral relations with partners both in
developed and developing countries will continue
to be utilised to identify opportunities for
strengthening on co-operation
19DFA STRATEGIC PLAN 2008-2011
- Strengthen Political and Economic Relations
- In order to advance this objective - it was
imperative to harness our efforts across all
spheres of govt - A co-ordination mechanism has now been
established which will pool our international
engagement efforts in order to leverage resources
better - We have also developed a marketing strategy
framework which amongst others seeks to improve
the projection of SA abroad - China has been identified as a first test case
for country wide co-ordination of SAs
international work
20DFA STRATEGIC PLAN 2008-2011
- Strengthen Political and Economic Relations
- With the engagement with China, three events have
been chosen- - 2008 Celebrations of 10 years of SA-China
diplomatic relations - 2010 Shanghai World Expo
- Partnership for Growth and Development (led by
dti)
21DFA STRATEGIC PLAN 2008-2011
- Strengthen Political and Economic Relations
- China - 2008 Celebrations of 10 years of SA-China
diplomatic relations - Three phased approach
- Phase I SA Weeks 07 to 29 April 2008
- Cultural events in 4 cities (Beijing, Shanghai,
Hong Kong, Guangzhou) Political Seminars
Celebrations of the South African National Day, - Phase II SA participation in Beijing Olympics
during August 2008 - Hosting of SA hospitality suite branded eKhaya,
at one of the main venues (led by Sports and
Recreation) - eKhaya will serve to promote SA and sustain the
momentum of the Celebrations - Phase III October November 2008
- The final phase will take place in October to
early November 2008 during President Mbekis
State Visit - The Presidents State Visit will coincide with
Trade Expos, to be held in Beijing, Guangzhou,
Hong Kong and Shanghai
22DFA STRATEGIC PLAN 2008-2011
- Strengthen Political and Economic Relations
- Overall the focus of our bilateral engagements is
on strengthening of political relations - We will use the infrastructure of our Missions in
every region - In Africa (46 Missions in 43 countries)
- In Asia (18 Missions in 14 countries)
- In the Middle East (12 Missions in 10 countries)
- In Europe (26 Missions in 22 countries)
- In the Americas (17 Missions in 10 countries)
- We will also engage with representatives of these
countries in SA
23RESOURCE ALLOCATION
24DFA STRATEGIC PLAN 2008-2011 3 YEAR SPENDING
PATTERN OF THE DEPARTMENT
Financial Years Budget R000 Actual Expenditure R000 Variance R000 Spent
2005/2006 2, 693,766 2,644,347 49,419 98.2
2006/2007 3,042,149 2,944,679 97,470 96,8
2007/2008 (Projected expenditure) 4,119,063 4,036,682 82,381 98
25DFA STRATEGIC PLAN 2008-2011
- 2008 MTEF BUDGET ALLOCATIONS
- The approved MTEF budget allocations for the
department is as follow - 2008/09 R4 340 708 billion
- 2009/10 R5 162 615 billion
- 2010/11 R4 983 406 billion
262008 MTEF REQUESTS
Budget proposals Amount requested R 000 Amount approved R 000 Variance R 000
Increased capacity in Missions- Asia and Africa 74,000 22,000 52,000
Foreign Service Dispensation 68,000 56,000 12,000
Strengthening of the department 100,000 0 100,000
Chairing of SADC 35,000 18,000 17,000
Diaspora 80,000 80,000 0
Inflation Adjustment 0 57197 0
27OVERVIEW OF 2008/09 BUDGET
Budget proposals Amount requested R 000 Amount approved R 000 Variance R 000
African Renaissance Fund 200,000 33,000 167,000
Infrastructure - Washington 70,000 20,000 50,000
TOTAL 627,000 286,000 341,000
ADJUSTMENTS TO BASELINE
Exchange rate gains 166,000
Baseline efficiency savings 23,333
TOTAL 530,000
28Schedule of proposed budget for 2008/09 cont..
Branch Compensation of Employees Goods and Services Cap Exp. Total
Management 30,089 48,055 253 78,397
Human Resources MGT 47,521 67,413 - 114,934
FSI PRAU 25,909 31,929 - 57,838
Corporate Services 103,095 186,441 356,435 645,971
TOTAL Programe 1 206,614 333,838 356,688 897,140
29Schedule of proposed budget for 2008/09 cont...
Branch Compensation of Employees Goods and Services Cap Exp. Total
Americas HO 16,248 7,897 0 24,145
Americas Mission 135,455 123,888 6,667 266,011
Europe HO 19,885 6,125 0 26,010
Europe Missions 365,263 226,714 8,915 600,895
Sub-total 536,851 364,624 15,582 917,061
30Schedule of proposed budget for 2008/09 cont..
Branch Compensation of Employees Goods and Services Cap Exp. Total
Multilateral Missions 48,165 39,581 2,227 89,973
Multilateral HO 39,060 18,088 32 57,181
Sub-Total 87,225 57,669 2,259 147,154
Africa Multilateral HO 17,407 188,434 181 206,022
Africa Multilateral Mission 14,059 12,946 0 27,005
Sub-Totals 31,466 201,380 181 233,027
31Schedule of proposed budget for 2008/09 cont..
Branch Compensation of Employees Goods and Services Cap Exp. Total
Africa Bilateral HO 36,348 33,510 166 70,151
Africa Bilateral Mission 288,043 243,297 27,971 559,311
Sub-Total 324,391 276,807 28,137 629,462
Asia HO 28,178 15,100 0 43,278
Asia Missions 181,005 197,446 15,557 394,009
Su-Total 209,183 212,546 15,557 437,287
32Schedule of proposed budget for 2008/09 cont..
Branch Compensation of Employees Goods and Services Cap Exp. Total
Public Diplomacy 21,129 13,707 1,045 35,881
State Protocol 47,079 56,405 7,000 110,484
Programme 3 68,208 70,111 8,045 146,365
NAASP 33,000 33,000
PAP-Building 145,000 145,000
UNDP-Rentals 10,348 10,348
Foreign Services Dispensation 56,000 56,000
33Schedule of proposed budget for 2008/09 cont..
Transfers and Subsidies Transfers and Subsidies 2008/09
African Renaissance Fund 398,925
African Union 152,922
African, Caribbean and Pacific Membership Fee 3,650
Bacterial and Toxic Weapons Convention 458
Bureau of International Exposition Membership Fees 27
Commonwealth Membership Fees 17,745
Comprehensive Test Ban Treaty 5,518
Group of 77 Countries 105
Humanitarian Aid 17,072
India Brazil South Africa Trust Fund 7,378
Indian Ocean Rim Research Centre 133
New Partnership for Africa's Development 31,620
34Schedule of proposed budget for 2008/09 cont..
Transfers and Subsidies Transfers and Subsidies 2008/09
Organization for Economic Co-operation and Development 216
Other International Organizations 1,032
Perrez-Guerrero Trust Fund 56
South Centre 1,107
Southern African Development Community Membership Fees 30,789
United Nations Human Rights 316
United Nations Children's Fund 211
United Nations Convention on the Law of Sea 527
United Nations Development Programme 1,052
United Nations Development Programme Local Office Costs 5,200
United Nations Technical Co-operation 105
United Nations Voluntary Fund for Disability 70
United Nations Membership Fees 79,592
TOTAL 755,826
35DFA STRATEGIC PLAN 2008-2011
- 2008 MTEF ALLOCATIONS
- The non granting of the requested amount by
National Treasury will impact on the Departments
ability to achieve its priority objective of
strengthening and expand our representation in
Asia and Africa - Furthermore R100 million was requested because
the department has over the years experienced
significant expansion especially between the
years 1994 and 2001. Consequently cabinet
approved in 2001 an organisational structure
reflective of the capacity needed to discharge on
the departments mandate. The department has
carefully analysed its baseline and realised that
given the ongoing filling of vacant posts, the
operational budget is insufficient to support the
current establishment
36 DFA STRATEGIC PLAN 2008-2011
- PROPERTY AND FACILITIES MANAGEMENT
- The Department operates both in South Africa and
in 105 countries and 121 diplomatic missions
abroad - The geographic spread and inherent complexities
place high demands on the Department to provide
accommodation, facilities, goods and services to
enable staff to function optimally - Two Chief Directorates were created to manage the
processes around accommodation, facilities and
the provision of goods and services - The Chief Directorate Property and Facilities
Management deals - with all aspects relating to property
management. - The Chief Directorate Supply Chain Management
manages the - sourcing and provisioning of goods and
services and the - management and safekeeping of these goods
and services
37 DFA STRATEGIC PLAN 2008-2011
- PROPERTY AND FACILITIES MANAGEMENT
- Key focus areas of the Asset Management Plan
- New Head Office
- Department had obtained approval to construct HO
under PPP - Construction of the new Head Office commenced in
September 2007 under an early works contract - PPP contract negotiations are in the final stages
- TA III approval is expected at end of March 2008
- Construction will be completed in March 2009
- The facility will be occupied by the Department
in March 2009
38 DFA STRATEGIC PLAN 2008-2011
- ASSET MANAGEMENT PLAN
- Challenges facing the Department with new HQ
project - Numerous issues raised by Treasury in December
2007 that impacted on finalisation of the PPP
agreement - The securing of adequate funding to continue with
the early works until TA III approval and
financial close is achieved
39 DFA STRATEGIC PLAN 2008-2011
- ASSET MANAGEMENT
- Key focus areas
- Acquisition of properties
- For missions abroad three types of accommodation
are provided - Chanceries or office accommodation
- Official Residences for Heads of Missions
- Staff housing for all other transferred officials
- The majority of these properties are currently
rented - Current rental costs are considerably high and
are expected to increase significantly in the
future - A strategy was approved to methodically purchase
properties abroad
40 DFA STRATEGIC PLAN 2008-2011
- ASSET MANAGEMENT
- Focus of the property acquisition strategy
- P5 (UN Security Council), G8
- Cities where multilateral organisations are
located - SADC and other strategic partners
- Strategic partners, e.g. IBSA
- In 2008/09 properties will be acquired in India,
Kenya, USA and Japan. - Refer to page 55 of the Strategic Plan for more
details - For details of acquisitions in 2009/10 and
2010/11 refer to pages 57 and 59 of the Strategic
Plan
41 DFA STRATEGIC PLAN 2008-2011
- ASSET MANAGEMENT
- Maintenance of State-owned properties
- More resources have been allocated to address
maintenance of state owned properties abroad. - Refer to page 55 of the Strategic Plan for
details - Asset Disposals
- The Department of Public Works is authorised to
dispose off State-owned properties abroad - The following properties were identified for
disposal in 2008/09 - Chancery and official residence -Germany, Bonn,
Official residence Switzerland, Zurich, Official
residence Brazil, Sao Paulo, Staff housing -
Namibia, Windhoek and Walvis Bay, Parking bay -
France, Paris - These properties were handed over to DPW for
disposal
42 DFA STRATEGIC PLAN 2008-2011
- ASSET VALUATION
- Valuation Strategy and Project Plan 2008 - 2011
- - Project plan developed and discussed with
National Treasury - Asset Categories to be valuated
- - Phase 1 (2008/2009) Land and Buildings,
Motor Vehicles, Paintings, Sculptures, Oriental
Carpets, and any other - works of Art
- Phase 2 and 3 (2009/2011) Computer Hardware,
Furniture and Equipment (Office and
Domestic), Audio Visual Equipment, Gardening
Equipment, and other Equipment - Valuation will be conducted according to regions
in the following sequence - 2008/2009 Head Office together with Europe and
Americas - 2009/2010 Asia and Middle East
- 2010/2011 Africa
43 DFA STRATEGIC PLAN 2008-2011
- INFORMATION AND COMMUNICATIONS TECHNOLOGY PLAN
- The focus of the Department for 2008 -2011 will
be - Voice over Internet Protocol (VOIP)
- Windows 2003 Advance Server
- Business Process Management (BPM)
- - CMS
- - Diplomatic Immunities and Privileges (DIAP)
system - Business Intelligence (BI)
- Modernise DFAs Information Technology
- (Refer to page 64 - 65 of the Strat Plan
document)
44 DFA STRATEGIC PLAN 2008-2011
- CONSULAR SERVICES
- Priority areas in the next 3 years
- To launch and roll-out the Consular Management
System (CMS) to missions with VoIP - To launch the ROSA (Registration of South
Africans Abroad) application as well as to market
and promote the usage of ROSA by citizens
travelling abroad - Establish and operationalise the Rapid Response
Team (RRT) to deal with emergencies, involving SA
citizens abroad - Continue to provide Consular Services to SA
citizens and - Accredit the Consular Training to SAQA standards
45 DFA STRATEGIC PLAN 2008-2011
- SECURITY
- Continue to vet all departmental officials during
the MTEF period - Ensure the security of people, information and
assets/facilities of the department - Roll out of a security awareness programme to all
departmental officials (MISS)
46ORGANISATIONAL STRENGTHENING
47 DFA STRATEGIC PLAN 2008-2011
- REORGANISATION OF BRANCH HCM
- Expanding work of the Department
- Increasing International demands
- Increasing numbers in the Department /- 5 200
employees (including Locally Recruited Personnel
in Missions) - Increased scope of Training and Development
- In order to meet the above-mentioned challenges,
the Branch HCM was split into Branches namely,
Human Resources and Training and Research
48 DFA STRATEGIC PLAN 2008-2011Branch HCM
(what was)
Human Resources Branch (Current)
Training and Research Branch (Current)
- People Management
- Effective and efficient processes
- Building Human Resource Capacity
- People Development
- Diplomatic and General Training
- Policy Research and Analysis
- Co-operation with other Diplomatic Academies
49ORGANISATIONAL ESTABLISHMENT
- Establishment as at 31 December 2007
- Head Office and Missions
50ORGANISATIONAL ESTABLISHMENT
- Representivity Employment Equity Table
Occupational Band Data MALE MALE MALE MALE FEMALE FEMALE FEMALE FEMALE GRAND TOTAL
Occupational Band Data African Coloured Indian White African Coloured Indian White GRAND TOTAL
Top Management Count 6 0 3 0 0 1 0 0 10
Top Management 60 0 30 0 0 10 0 0 100
Senior Management Count 94 10 14 35 55 3 2 16 229
Senior Management 41 4 6 15 24 1 1 7 100
Prof qualified and experienced specialists and mid-management Count 281 26 31 182 226 18 31 182 977
Prof qualified and experienced specialists and mid-management 29 3 3 19 23 2 3 19 100
Skilled technical / academically qualified workers, junior management, supervisors, foremen, superintendents Count 153 10 10 26 242 17 18 112 588
Skilled technical / academically qualified workers, junior management, supervisors, foremen, superintendents 26 2 2 4 41 3 3 19 100
Semi-skilled / discretionary decision-making Count 128 7 0 3 174 6 1 2 321
Semi-skilled / discretionary decision-making 40 2 0 1 53 2 1 1 100
Unskilled / defined decision-making Count 33 0 0 0 52 0 0 1 86
Unskilled / defined decision-making 38 0 0 0 60 0 0 2 100
Total Count 695 53 58 246 749 45 52 313 2211
Total 31 2 3 11 34 2 2 14 100
The total number 2211 excludes 3 Political
Office Bearers
51ORGANISATIONAL ESTABLISHMENT
Occupational Band Data MALE MALE MALE MALE FEMALE FEMALE FEMALE FEMALE GRAND TOTAL
Occupational Band Data African Coloured Indian White African Coloured Indian White GRAND TOTAL
Top Management Count 6 0 3 0 0 1 0 0 10
Top Management 60 0 30 0 0 10 0 0 100
Senior Management Count 94 10 14 35 55 3 2 16 229
Senior Management 41 5 6 15 24 1 1 7 100
Middle management Count 281 26 31 182 226 18 31 182 977
Middle management 29 3 3 19 23 2 3 18 100
Below Assistant Director Count 314 17 10 29 468 23 19 115 995
Below Assistant Director 32 2 1 3 47 2 2 11 100
Total Count 695 53 58 246 749 45 52 313 2211
Total 31 2 3 11 34 2 3 14 100
Disability Data MALE MALE MALE MALE FEMALE FEMALE FEMALE FEMALE GRAND TOTAL
Disability Data African Coloured Indian White African Coloured Indian White GRAND TOTAL
Disability Count 8 0 2 11 7 1 0 4 33
Disability 24 0 6 34 21 3 0 12 100
The total number 2211 excludes 3 Political
Office Bearers The number of disabled people
are included in the total number 2211
52 DFA STRATEGIC PLAN 2008-2011
- Employment Equity Organisational Culture
- Implement and monitor the Employment Equity plan
-
- Share the survey results in Missions, for both
transferred employees and the Locally Recruited
Personnel. - Develop and implement interventions to enhance
the organisational culture of the Department.
(Head Office and Missions) - Facilitate the implementation of the Departmental
Service Delivery improvement Plan
53DFA STRATEGIC PLAN 2008-2011
- Talent Management
- Develop and implement the DFA HR Capacity
Building project - Flexible organisational arrangements e.g.
specialised Units - Succession plan
- Strategic Language Development Plan
- Implement the career management framework and
establish a web-based Career Centre - Design and implement the career paths for the
first 5 years in DFA e.g. Cadets and Line
function new entrants. - Continue with Employer Branding activities
54DFA STRATEGIC PLAN 2008-2011
- Employee Health and Wellness
- Implement a robust Employee Health and Wellness
strategy - Implement the pre and after posting debriefing
sessions for families - Improve processes and programmes to intensify
support to transferred employees and their
spouses -
- Implement an on-line health and wellness
programme called e-Care system - Implement the results of the HIV and AIDS
Knowledge, Attitudes and Practice (KAP) survey
55 DFA STRATEGIC PLAN 2008-2011
- TRAINING AND RESEARCH BRANCH
- Two Chief Directorates FSI and PRAU are in
process of being reconstituted into a single
Branch - Proposed new name - Diplomatic Academy
-
-
56 DFA STRATEGIC PLAN 2008-2011
- TRAINING AND RESEARCH BRANCH
- The Branch will pursue the following two main
objectives - Train and develop employees of the DFA to
contribute to Governments priority programmes
and to contribute to the enhancement of
individual and organisational programmes and - To conduct research and analysis on issues
pertaining to South Africas foreign policy - These objectives are underpinned by the following
strategic priorities for the next three years - Training and Development of competent diplomats
- Research and Analysis on issues pertaining to
South Africas foreign policy - Networking and Partnership with relevant
stakeholders - Capacity Building and Development for SADC and
the AU and - Retain intellectual capacity and develop
mentoring and coaching mechanisms -
57 DFA STRATEGIC PLAN 2008-2011
- Internal Audit
- Our work in the Dept is supported by a strong
internal audit system - Our Internal Audit Unit assists with facilitating
Risk Assessment - This work is supported by a very committed Audit
Committee which plays a very critical monitoring
and evaluation role in ensuring full compliance
to the PFMA and other related performance
obligations and requirements -
58 DFA STRATEGIC PLAN 2008-2011
- CONCLUSION
- As indicated in pages 50-52 The Department has
also developed a Service Delivery Improvement
Plan for 2008/9 which is meant to address
implementation issues as we advance our work - This presentation only lifted some key issues of
our work and could not cover everything in the
time allocated - The DFA Team that has accompanied me will also be
available to assist in responding to questions -
59