Title: Department of Foreign Affairs


1
Department of Foreign Affairs
  • Strategic Plan
  • 2008-2011
  • Presentation to the
  • Parliamentary Portfolio Committee on Foreign
    Affairs
  • 12 March 2008

2
DFA STRATEGIC PLAN 2008-2011
  • INTRODUCTION
  • The Strategic Plan doc covers the strategic
    thrust of the work of the Department in the 2008
    2011 MTEF
  • Our work continues to be guided by the decision,
    priorities and policy guidelines emanating from
    the January Cabinet Lekgotla and the State of the
    Nation Address
  • The Strategic Plan document has thus been
    developed guided by the amended Chapter 5 of the
    Treasury Regulations in terms of Section 76 of
    the PFMA
  • Political guidance given by the Minister and
    Deputy Ministers has been invaluable in the
    development of the Plan

3
DFA STRATEGIC PLAN 2008-2011
  • STRATEGIC THRUST OF DFA FOR 2008 - 2011
  • The work of the DFA remains anchored on the
    following overarching priorities
  • Consolidation of the African Agenda
  • Strengthening of South-South Co-operation
  • Strengthening of North-South Co-operation
  • Participation in the Global System of Governance
  • Strengthening of Bilateral and Economic Relations
  • This work is supported by the following
    activities
  • Organisational Strengthening
  • Organisational Support
  • Rendering of Professional Services

4
DFA STRATEGIC PLAN 2008-2011
  • Consolidation of the African Agenda
  • SAs work will continue to focus on the
    strengthening of African institutions both at
    regional and Continental level
  • AU and its structures
  • Implementation of NEPAD
  • Strengthening of SADC
  • Contribution to Post Conflict Reconstruction and
    Development (PCRD)
  • Contribute towards peace, security and stability
    in Africa
  • Strengthen Bilateral Relations with all African
    countries
  • Support the hosting of the 2010 FIFA World Cup

5
DFA STRATEGIC PLAN 2008-2011
  • Consolidation of the African Agenda
  • On the strengthening of the AU and its
    structures- we will continue with efforts aimed
    at
  • Harmonisation and rationalisation of RECS
  • Consolidate support to PAP
  • Construction of the Building set to start in the
    current financial year
  • Need to also engage in evolving debate on the
    eventual role of PAP ( Advisory legislative)
  • Operationalisation of AU Financial Institutions
    and African Courts
  • Engagement of the African Diaspora
  • SA to host Summit in October 08
  • Strengthen AU-EU Relations

6
DFA STRATEGIC PLAN 2008-2011
  • Consolidation of the African Agenda
  • Support the implementation of NEPAD
  • Co-ordination internally in SA
  • Manage the African Renaissance Fund
  • Continue to advocate for the mobilisation of
    continental resources
  • SADC
  • SA is taking over as Chair of SADC in August 2008
  • This presents both opportunities and challenges
    as the region faces unique challenges as it
    advances regional integration
  • It is clear that we have to focus on
    strengthening bilateral ties with each SADC
    country as a pre-requisite for the success of our
    efforts

7
DFA STRATEGIC PLAN 2008-2011
  • Consolidation of the African Agenda
  • SADC
  • At a strategic level, SA has a vested interest in
    a successful integration agenda in the region
  • Individual SADC member states have to confront a
    variety of challenges largely imposed by their
    objective economic situations which are currently
    impacting negatively on the need for singularity
    of purpose and action to advance regional
    development
  • We also have a SADC that has residual areas of
    instability that require careful management as we
    move forward
  • By far - the most immediate challenges are to
    engage and redirect the Integration agenda so
    that it truly advances regional development and
  • Encourage peace and stability in the region

8
DFA STRATEGIC PLAN 2008-2011
  • Consolidation of the African Agenda
  • SADC
  • Focus of SAs Chairship will thus be to
    contribute to the strengthening of SADC both in
    terms of capacity and implementation of its
    programmes
  • The current integration debate coupled with the
    developments around the EU-EPA negotiations will
    also be a key area of focus
  • Elections will also take place in several SADC
    countries in the MTSF with Angola and Zimbabwe
    set to have their elections in 2008
  • SA will send its observers to these elections as
    part of the SADC contingent

9
DFA STRATEGIC PLAN 2008-2011
  • Strengthen South South Co-operation
  • Our work in this area will focus on the
    strengthening of SAs engagement in multilateral
    organisations of the South such as the G-77 and
    China, and NAM
  • We will also engage with other south-south
    groupings such as IBSA, NAASP, IOR, FOCAC, and
    Africa-South America Forum
  • The growing interest amongst emerging developing
    countries to have structured engagements with the
    African continent has resulted to the formation
    of the Africa- India Forum which will be
    inaugurated in April 2008 in New Delhi, India

10
DFA STRATEGIC PLAN 2008-2011
  • Strengthen South South Co-operation
  • More on IBSA
  • SA hosted 2nd IBSA Summit last October and will
    host a Ministerial Meeting in March 08 in
    preparation for the 3rd Summit to be hosted by
    India later this year
  • Marked expansion of areas of co-operation
  • People to people dimension include
  • Womens Forum
  • Parliamentary Forum
  • Journalist Programme
  • Social Development/ Civil Society Forum
  • Also academia and Business

11
DFA STRATEGIC PLAN 2008-2011
  • Strengthen North South Co-operation
  • SAs engagement with the North is largely
    informed by the
  • imperative of advancing the African Agenda as
    well as broader
  • development interest of the South
  • G-8
  • TICAD

12
DFA STRATEGIC PLAN 2008-2011
  • Participate in the Global System of Governance
  • SAs engagement in the global system of
    Governance will continue to cover the political,
    economic and social spheres of our work
  • Whilst our engagement as non-permanent member of
    the UNSC will lapse at the end of 2008
  • We will continue to advance our engagements in
    other key areas of UN work
  • One of the key areas will be advancing the reform
    of the UN
  • Another key issue that is proving highly topical
    in multilateral debates especially due to its
    cross cutting nature and impact is Climate Change
  • Govt is seized with the matter and necessary
    co-ordination with key Departments is done
    through the IRPS Cluster

13
DFA STRATEGIC PLAN 2008-2011
  • Participate in the Global System of Governance
  • Briefly on SAs focus in the 2nd year of UNSC
    seat
  • We will build on the achievements of 2007 which
    include inter alia-
  • Leadership on African and thematic issues (Sudan,
    Côte dIvoire and the DRC)
  • Revitalisation of the debate on Chapter VIII
    institutions and the Council and the need for
    closer co-operation between the AU Peace and
    Security Council and the UN Security Council
  • SA co-leadership of the Security Council Mission
    to Africa 2007
  • Focus on women in peace and security small arms
    and light weapons
  • Promoted African perspectives on Security Sector
    Reform
  • Leadership on Timor-Leste
  • Active engagement in UNSC subsidiary bodies e.g.
    Counter-Terrorism Committee and 1540 Committee on
    weapons of mass destruction and non-State actors

14
DFA STRATEGIC PLAN 2008-2011
  • Participate in the Global System of Governance
  • UNSC seat 2008
  • Particular focus will be
  • To further advance the theme of enhancing
    co-operation between the United Nations and
    regional organisations in particular the AU
  • Under SAs Presidency of the UNSC in April 2008
    a joint meeting of the UNSC and the AUPSC has
    been organised
  • We will also continue to advocate for more
    transparent and democratic working methods and
    procedures in the UNSC
  • We are also continuously conscious of the
    setbacks we experienced in our first year
    particularly the negative media coverage over
    SAs positions (Myanmar, Iran, listing of South
    Africans on UNSC terror list)
  • A communications strategy has now been developed
    to address this challenge

15
DFA STRATEGIC PLAN 2008-2011
  • Participate in the Global System of Governance
  • Key Substance Issues in 2008
  • Kosovo
  • Visit by Counter-Terrorism Committees expert
    support structure to South Africa (mid-2008)
  • Renewal of 1540 mandate
  • Iran Middle East Lebanon/Syria
  • DRC Sudan Western Sahara

16
DFA STRATEGIC PLAN 2008-2011
  • Disarmament, Non-Proliferation Arms Control
  • Active role in disarmament, non-proliferation and
    arms control in relation to both WMD and
    conventional weapons
  • Promote and support non-proliferation of WMD,
    whilst guarding against controls becoming a means
    to deny countries access to advanced technologies
  • Active engagement in fora (IAEA UNSC) dealing
    with situations of concern, including Iran and
    the DPRK
  • Promote principled positions on the inalienable
    right of all States to pursue advanced
    technologies for peaceful purposes need to
    preserve the credibility of the relevant
    multilateral institutions (IAEA) and the UNSC
    pursue peaceful, negotiated solutions to address
    security concerns

17
DFA STRATEGIC PLAN 2008-2011
  • Middle East Peace Process
  • South African profile increased over the last
    year as witnessed in
  • Hosting of the UN Africa Meeting on the Question
    of Palestine - May 2007
  • US invitation to attend the Annapolis Peace
    Conference November 2007
  • French invitation to attend the Paris Donors
    Conference in aid of Palestinian reconstruction
    and development December 2007
  • Hosting of PNA caretaker Foreign Minister and
    Palestinian Ambassadors serving in Africa-
    scheduled for April 2008
  • Moving Forward
  • South Africa will remain involved in capacity and
    institution building in Palestine (On a bilateral
    basis as well as through the IBSA and NAASP
    forums)
  • DFA maintains that Palestinian unity is a
    pre-requisite for progress in resolving the
    Arab-Israeli conflict. Will engage with
    Hamas/Fatah based on the principals of the Spier
    process
  • South Africa will maintain pressure for Annapolis
    Process follow up Conference in Russia to take
    place and for the Israel-Syria negotiation track
    to be opened

18
DFA STRATEGIC PLAN 2008-2011
  • Strengthen Political and Economic Relations
  • Focus of SAs bilateral engagements has
    traditionally been on the consolidation of
    political relations
  • With bilateral political relations largely
    solidified
  • Key challenge is to leverage SAs extensive
    global diplomatic reach international political
    standing to advance the countrys economic
    interests
  • The focus during the MTSF will be on
    strengthening of economic diplomacy in order to
    respond the government's priority of growing the
    economy to address our socio-economic challenges
  • Bilateral relations with partners both in
    developed and developing countries will continue
    to be utilised to identify opportunities for
    strengthening on co-operation

19
DFA STRATEGIC PLAN 2008-2011
  • Strengthen Political and Economic Relations
  • In order to advance this objective - it was
    imperative to harness our efforts across all
    spheres of govt
  • A co-ordination mechanism has now been
    established which will pool our international
    engagement efforts in order to leverage resources
    better
  • We have also developed a marketing strategy
    framework which amongst others seeks to improve
    the projection of SA abroad
  • China has been identified as a first test case
    for country wide co-ordination of SAs
    international work

20
DFA STRATEGIC PLAN 2008-2011
  • Strengthen Political and Economic Relations
  • With the engagement with China, three events have
    been chosen-
  • 2008 Celebrations of 10 years of SA-China
    diplomatic relations
  • 2010 Shanghai World Expo
  • Partnership for Growth and Development (led by
    dti)

21
DFA STRATEGIC PLAN 2008-2011
  • Strengthen Political and Economic Relations
  • China - 2008 Celebrations of 10 years of SA-China
    diplomatic relations
  • Three phased approach
  • Phase I SA Weeks 07 to 29 April 2008
  • Cultural events in 4 cities (Beijing, Shanghai,
    Hong Kong, Guangzhou) Political Seminars
    Celebrations of the South African National Day,
  • Phase II SA participation in Beijing Olympics
    during August 2008
  • Hosting of SA hospitality suite branded eKhaya,
    at one of the main venues (led by Sports and
    Recreation)
  • eKhaya will serve to promote SA and sustain the
    momentum of the Celebrations
  • Phase III October November 2008
  • The final phase will take place in October to
    early November 2008 during President Mbekis
    State Visit
  • The Presidents State Visit will coincide with
    Trade Expos, to be held in Beijing, Guangzhou,
    Hong Kong and Shanghai

22
DFA STRATEGIC PLAN 2008-2011
  • Strengthen Political and Economic Relations
  • Overall the focus of our bilateral engagements is
    on strengthening of political relations
  • We will use the infrastructure of our Missions in
    every region
  • In Africa (46 Missions in 43 countries)
  • In Asia (18 Missions in 14 countries)
  • In the Middle East (12 Missions in 10 countries)
  • In Europe (26 Missions in 22 countries)
  • In the Americas (17 Missions in 10 countries)
  • We will also engage with representatives of these
    countries in SA

23
RESOURCE ALLOCATION
24
DFA STRATEGIC PLAN 2008-2011 3 YEAR SPENDING
PATTERN OF THE DEPARTMENT
Financial Years Budget R000 Actual Expenditure R000 Variance R000 Spent
 2005/2006 2, 693,766 2,644,347 49,419 98.2
2006/2007 3,042,149 2,944,679 97,470 96,8
2007/2008 (Projected expenditure) 4,119,063 4,036,682 82,381 98
25
DFA STRATEGIC PLAN 2008-2011
  • 2008 MTEF BUDGET ALLOCATIONS
  • The approved MTEF budget allocations for the
    department is as follow
  • 2008/09 R4 340 708 billion
  • 2009/10 R5 162 615 billion
  • 2010/11 R4 983 406 billion

26
2008 MTEF REQUESTS
Budget proposals Amount requested R 000 Amount approved R 000 Variance R 000
Increased capacity in Missions- Asia and Africa 74,000 22,000 52,000
Foreign Service Dispensation 68,000 56,000 12,000
Strengthening of the department 100,000 0 100,000
Chairing of SADC 35,000 18,000 17,000
Diaspora 80,000 80,000 0
Inflation Adjustment 0 57197 0
27
OVERVIEW OF 2008/09 BUDGET
Budget proposals Amount requested R 000 Amount approved R 000 Variance R 000
African Renaissance Fund 200,000 33,000 167,000
Infrastructure - Washington 70,000 20,000 50,000
 TOTAL 627,000 286,000 341,000
ADJUSTMENTS TO BASELINE    
Exchange rate gains   166,000
Baseline efficiency savings   23,333
TOTAL 530,000
28
Schedule of proposed budget for 2008/09 cont..
Branch Compensation of Employees Goods and Services Cap Exp. Total
Management 30,089 48,055 253 78,397
Human Resources MGT 47,521 67,413 - 114,934
FSI PRAU 25,909 31,929 - 57,838
Corporate Services 103,095 186,441 356,435 645,971
TOTAL Programe 1 206,614 333,838 356,688 897,140
29
Schedule of proposed budget for 2008/09 cont...
Branch Compensation of Employees Goods and Services Cap Exp. Total
Americas HO 16,248 7,897 0 24,145
Americas Mission 135,455 123,888 6,667 266,011
Europe HO 19,885 6,125 0 26,010
Europe Missions 365,263 226,714 8,915 600,895
Sub-total 536,851 364,624 15,582 917,061
30
Schedule of proposed budget for 2008/09 cont..
Branch Compensation of Employees Goods and Services Cap Exp. Total
Multilateral Missions 48,165 39,581 2,227 89,973
Multilateral HO 39,060 18,088 32 57,181
Sub-Total 87,225 57,669 2,259 147,154
Africa Multilateral HO 17,407 188,434 181 206,022
Africa Multilateral Mission 14,059 12,946 0 27,005
Sub-Totals 31,466 201,380 181 233,027
31
Schedule of proposed budget for 2008/09 cont..
Branch Compensation of Employees Goods and Services Cap Exp. Total
Africa Bilateral HO 36,348 33,510 166 70,151
Africa Bilateral Mission 288,043 243,297 27,971 559,311
Sub-Total 324,391 276,807 28,137 629,462
Asia HO 28,178 15,100 0 43,278
Asia Missions 181,005 197,446 15,557 394,009
Su-Total 209,183 212,546 15,557 437,287
32
Schedule of proposed budget for 2008/09 cont..
Branch Compensation of Employees Goods and Services Cap Exp. Total
Public Diplomacy 21,129 13,707 1,045 35,881
State Protocol 47,079 56,405 7,000 110,484
Programme 3 68,208 70,111 8,045 146,365
NAASP 33,000 33,000
PAP-Building 145,000 145,000
UNDP-Rentals 10,348 10,348
Foreign Services Dispensation 56,000 56,000
33
Schedule of proposed budget for 2008/09 cont..
Transfers and Subsidies Transfers and Subsidies 2008/09
African Renaissance Fund   398,925
African Union   152,922
African, Caribbean and Pacific Membership Fee   3,650
Bacterial and Toxic Weapons Convention   458
Bureau of International Exposition Membership Fees   27
Commonwealth Membership Fees   17,745
Comprehensive Test Ban Treaty   5,518
Group of 77 Countries   105
Humanitarian Aid   17,072
India Brazil South Africa Trust Fund   7,378
Indian Ocean Rim Research Centre   133
New Partnership for Africa's Development   31,620
34
Schedule of proposed budget for 2008/09 cont..
Transfers and Subsidies Transfers and Subsidies 2008/09
Organization for Economic Co-operation and Development   216
Other International Organizations   1,032
Perrez-Guerrero Trust Fund   56
South Centre   1,107
Southern African Development Community Membership Fees   30,789
United Nations Human Rights   316
United Nations Children's Fund   211
United Nations Convention on the Law of Sea   527
United Nations Development Programme   1,052
United Nations Development Programme Local Office Costs   5,200
United Nations Technical Co-operation   105
United Nations Voluntary Fund for Disability   70
United Nations Membership Fees   79,592
 
TOTAL   755,826
35
DFA STRATEGIC PLAN 2008-2011
  • 2008 MTEF ALLOCATIONS
  • The non granting of the requested amount by
    National Treasury will impact on the Departments
    ability to achieve its priority objective of
    strengthening and expand our representation in
    Asia and Africa
  • Furthermore R100 million was requested because
    the department has over the years experienced
    significant expansion especially between the
    years 1994 and 2001. Consequently cabinet
    approved in 2001 an organisational structure
    reflective of the capacity needed to discharge on
    the departments mandate. The department has
    carefully analysed its baseline and realised that
    given the ongoing filling of vacant posts, the
    operational budget is insufficient to support the
    current establishment

36
DFA STRATEGIC PLAN 2008-2011
  • PROPERTY AND FACILITIES MANAGEMENT
  • The Department operates both in South Africa and
    in 105 countries and 121 diplomatic missions
    abroad
  • The geographic spread and inherent complexities
    place high demands on the Department to provide
    accommodation, facilities, goods and services to
    enable staff to function optimally
  • Two Chief Directorates were created to manage the
    processes around accommodation, facilities and
    the provision of goods and services
  • The Chief Directorate Property and Facilities
    Management deals
  • with all aspects relating to property
    management.
  • The Chief Directorate Supply Chain Management
    manages the
  • sourcing and provisioning of goods and
    services and the
  • management and safekeeping of these goods
    and services

37
DFA STRATEGIC PLAN 2008-2011
  • PROPERTY AND FACILITIES MANAGEMENT
  • Key focus areas of the Asset Management Plan
  • New Head Office
  • Department had obtained approval to construct HO
    under PPP
  • Construction of the new Head Office commenced in
    September 2007 under an early works contract
  • PPP contract negotiations are in the final stages
  • TA III approval is expected at end of March 2008
  • Construction will be completed in March 2009
  • The facility will be occupied by the Department
    in March 2009

38
DFA STRATEGIC PLAN 2008-2011
  • ASSET MANAGEMENT PLAN
  • Challenges facing the Department with new HQ
    project
  • Numerous issues raised by Treasury in December
    2007 that impacted on finalisation of the PPP
    agreement
  • The securing of adequate funding to continue with
    the early works until TA III approval and
    financial close is achieved

39
DFA STRATEGIC PLAN 2008-2011
  • ASSET MANAGEMENT
  • Key focus areas
  • Acquisition of properties
  • For missions abroad three types of accommodation
    are provided
  • Chanceries or office accommodation
  • Official Residences for Heads of Missions
  • Staff housing for all other transferred officials
  • The majority of these properties are currently
    rented
  • Current rental costs are considerably high and
    are expected to increase significantly in the
    future
  • A strategy was approved to methodically purchase
    properties abroad

40
DFA STRATEGIC PLAN 2008-2011
  • ASSET MANAGEMENT
  • Focus of the property acquisition strategy
  • P5 (UN Security Council), G8
  • Cities where multilateral organisations are
    located
  • SADC and other strategic partners
  • Strategic partners, e.g. IBSA
  • In 2008/09 properties will be acquired in India,
    Kenya, USA and Japan.
  • Refer to page 55 of the Strategic Plan for more
    details
  • For details of acquisitions in 2009/10 and
    2010/11 refer to pages 57 and 59 of the Strategic
    Plan

41
DFA STRATEGIC PLAN 2008-2011
  • ASSET MANAGEMENT
  • Maintenance of State-owned properties
  • More resources have been allocated to address
    maintenance of state owned properties abroad.
  • Refer to page 55 of the Strategic Plan for
    details
  • Asset Disposals
  • The Department of Public Works is authorised to
    dispose off State-owned properties abroad
  • The following properties were identified for
    disposal in 2008/09
  • Chancery and official residence -Germany, Bonn,
    Official residence Switzerland, Zurich, Official
    residence Brazil, Sao Paulo, Staff housing -
    Namibia, Windhoek and Walvis Bay, Parking bay -
    France, Paris
  • These properties were handed over to DPW for
    disposal

42
DFA STRATEGIC PLAN 2008-2011
  • ASSET VALUATION
  • Valuation Strategy and Project Plan 2008 - 2011
  • - Project plan developed and discussed with
    National Treasury
  • Asset Categories to be valuated
  • - Phase 1 (2008/2009) Land and Buildings,
    Motor Vehicles, Paintings, Sculptures, Oriental
    Carpets, and any other
  • works of Art
  • Phase 2 and 3 (2009/2011) Computer Hardware,
    Furniture and Equipment (Office and
    Domestic), Audio Visual Equipment, Gardening
    Equipment, and other Equipment
  • Valuation will be conducted according to regions
    in the following sequence
  • 2008/2009 Head Office together with Europe and
    Americas
  • 2009/2010 Asia and Middle East
  • 2010/2011 Africa

43
DFA STRATEGIC PLAN 2008-2011
  • INFORMATION AND COMMUNICATIONS TECHNOLOGY PLAN
  • The focus of the Department for 2008 -2011 will
    be
  • Voice over Internet Protocol (VOIP)
  • Windows 2003 Advance Server
  • Business Process Management (BPM)
  • - CMS
  • - Diplomatic Immunities and Privileges (DIAP)
    system
  • Business Intelligence (BI)
  • Modernise DFAs Information Technology
  • (Refer to page 64 - 65 of the Strat Plan
    document)

44
DFA STRATEGIC PLAN 2008-2011
  • CONSULAR SERVICES
  • Priority areas in the next 3 years
  • To launch and roll-out the Consular Management
    System (CMS) to missions with VoIP
  • To launch the ROSA (Registration of South
    Africans Abroad) application as well as to market
    and promote the usage of ROSA by citizens
    travelling abroad
  • Establish and operationalise the Rapid Response
    Team (RRT) to deal with emergencies, involving SA
    citizens abroad
  • Continue to provide Consular Services to SA
    citizens and
  • Accredit the Consular Training to SAQA standards

45
DFA STRATEGIC PLAN 2008-2011
  • SECURITY
  • Continue to vet all departmental officials during
    the MTEF period
  • Ensure the security of people, information and
    assets/facilities of the department
  • Roll out of a security awareness programme to all
    departmental officials (MISS)

46
ORGANISATIONAL STRENGTHENING
47
DFA STRATEGIC PLAN 2008-2011
  • REORGANISATION OF BRANCH HCM
  • Expanding work of the Department
  • Increasing International demands
  • Increasing numbers in the Department /- 5 200
    employees (including Locally Recruited Personnel
    in Missions)
  • Increased scope of Training and Development
  • In order to meet the above-mentioned challenges,
    the Branch HCM was split into Branches namely,
    Human Resources and Training and Research

48
DFA STRATEGIC PLAN 2008-2011Branch HCM
(what was)
Human Resources Branch (Current)
Training and Research Branch (Current)
  • People Management
  • Effective and efficient processes
  • Building Human Resource Capacity
  • People Development
  • Diplomatic and General Training
  • Policy Research and Analysis
  • Co-operation with other Diplomatic Academies

49
ORGANISATIONAL ESTABLISHMENT
  • Establishment as at 31 December 2007
  • Head Office and Missions

50
ORGANISATIONAL ESTABLISHMENT
  • Representivity Employment Equity Table

Occupational Band Data MALE MALE MALE MALE FEMALE FEMALE FEMALE FEMALE GRAND TOTAL
Occupational Band Data African Coloured Indian White African Coloured Indian White GRAND TOTAL
Top Management Count 6 0 3 0 0 1 0 0 10
Top Management 60 0 30 0 0 10 0 0 100
Senior Management Count 94 10 14 35 55 3 2 16 229
Senior Management 41 4 6 15 24 1 1 7 100
Prof qualified and experienced specialists and mid-management Count 281 26 31 182 226 18 31 182 977
Prof qualified and experienced specialists and mid-management 29 3 3 19 23 2 3 19 100
Skilled technical / academically qualified workers, junior management, supervisors, foremen, superintendents Count 153 10 10 26 242 17 18 112 588
Skilled technical / academically qualified workers, junior management, supervisors, foremen, superintendents 26 2 2 4 41 3 3 19 100
Semi-skilled / discretionary decision-making Count 128 7 0 3 174 6 1 2 321
Semi-skilled / discretionary decision-making 40 2 0 1 53 2 1 1 100
Unskilled / defined decision-making Count 33 0 0 0 52 0 0 1 86
Unskilled / defined decision-making 38 0 0 0 60 0 0 2 100
Total Count   695 53 58 246 749 45 52 313 2211
Total   31 2 3 11 34 2 2 14 100
The total number 2211 excludes 3 Political
Office Bearers
51
ORGANISATIONAL ESTABLISHMENT
Occupational Band Data MALE MALE MALE MALE FEMALE FEMALE FEMALE FEMALE GRAND TOTAL
Occupational Band Data African Coloured Indian White African Coloured Indian White GRAND TOTAL
Top Management Count 6 0 3 0 0 1 0 0 10
Top Management 60 0 30 0 0 10 0 0 100
Senior Management Count 94 10 14 35 55 3 2 16 229
Senior Management 41 5 6 15 24 1 1 7 100
Middle management Count 281 26 31 182 226 18 31 182 977
Middle management 29 3 3 19 23 2 3 18 100
Below Assistant Director Count 314 17 10 29 468 23 19 115 995
Below Assistant Director 32 2 1 3 47 2 2 11 100
Total Count   695 53 58 246 749 45 52 313 2211
Total   31 2 3 11 34 2 3 14 100
Disability Data MALE MALE MALE MALE FEMALE FEMALE FEMALE FEMALE GRAND TOTAL
Disability Data African Coloured Indian White African Coloured Indian White GRAND TOTAL
Disability Count 8 0 2 11 7 1 0 4 33
Disability 24 0 6 34 21 3 0 12 100
The total number 2211 excludes 3 Political
Office Bearers The number of disabled people
are included in the total number 2211
52
DFA STRATEGIC PLAN 2008-2011
  • Employment Equity Organisational Culture
  • Implement and monitor the Employment Equity plan
  • Share the survey results in Missions, for both
    transferred employees and the Locally Recruited
    Personnel.
  • Develop and implement interventions to enhance
    the organisational culture of the Department.
    (Head Office and Missions)
  • Facilitate the implementation of the Departmental
    Service Delivery improvement Plan

53
DFA STRATEGIC PLAN 2008-2011
  • Talent Management
  • Develop and implement the DFA HR Capacity
    Building project
  • Flexible organisational arrangements e.g.
    specialised Units
  • Succession plan
  • Strategic Language Development Plan
  • Implement the career management framework and
    establish a web-based Career Centre
  • Design and implement the career paths for the
    first 5 years in DFA e.g. Cadets and Line
    function new entrants.
  • Continue with Employer Branding activities

54
DFA STRATEGIC PLAN 2008-2011
  • Employee Health and Wellness
  • Implement a robust Employee Health and Wellness
    strategy
  • Implement the pre and after posting debriefing
    sessions for families
  • Improve processes and programmes to intensify
    support to transferred employees and their
    spouses
  • Implement an on-line health and wellness
    programme called e-Care system
  • Implement the results of the HIV and AIDS
    Knowledge, Attitudes and Practice (KAP) survey

55
DFA STRATEGIC PLAN 2008-2011
  • TRAINING AND RESEARCH BRANCH
  • Two Chief Directorates FSI and PRAU are in
    process of being reconstituted into a single
    Branch
  • Proposed new name - Diplomatic Academy

56
DFA STRATEGIC PLAN 2008-2011
  • TRAINING AND RESEARCH BRANCH
  • The Branch will pursue the following two main
    objectives
  • Train and develop employees of the DFA to
    contribute to Governments priority programmes
    and to contribute to the enhancement of
    individual and organisational programmes and
  • To conduct research and analysis on issues
    pertaining to South Africas foreign policy
  • These objectives are underpinned by the following
    strategic priorities for the next three years
  • Training and Development of competent diplomats
  • Research and Analysis on issues pertaining to
    South Africas foreign policy
  • Networking and Partnership with relevant
    stakeholders
  • Capacity Building and Development for SADC and
    the AU and
  • Retain intellectual capacity and develop
    mentoring and coaching mechanisms

57
DFA STRATEGIC PLAN 2008-2011
  • Internal Audit
  • Our work in the Dept is supported by a strong
    internal audit system
  • Our Internal Audit Unit assists with facilitating
    Risk Assessment
  • This work is supported by a very committed Audit
    Committee which plays a very critical monitoring
    and evaluation role in ensuring full compliance
    to the PFMA and other related performance
    obligations and requirements

58
DFA STRATEGIC PLAN 2008-2011
  • CONCLUSION
  • As indicated in pages 50-52 The Department has
    also developed a Service Delivery Improvement
    Plan for 2008/9 which is meant to address
    implementation issues as we advance our work
  • This presentation only lifted some key issues of
    our work and could not cover everything in the
    time allocated
  • The DFA Team that has accompanied me will also be
    available to assist in responding to questions

59
  • Thank you