Photon Systems Update - PowerPoint PPT Presentation

1 / 18
About This Presentation
Title:

Photon Systems Update

Description:

Photon Systems Update John Arthur SLAC Photon Systems Manager Photon Systems Includes LCLS x-ray and laser groups X-ray Transport, Optics and Diagnostics (XTOD ... – PowerPoint PPT presentation

Number of Views:88
Avg rating:3.0/5.0
Slides: 19
Provided by: hel85
Category:

less

Transcript and Presenter's Notes

Title: Photon Systems Update


1
Photon Systems Update
John Arthur SLAC Photon Systems Manager
2
Photon Systems
  • Includes LCLS x-ray and laser groups
  • X-ray Transport, Optics and Diagnostics (XTOD)
  • managed by LLNL (Richard Bionta)
  • X-ray Endstation Systems (XES)
  • managed by SLAC (Stefan Moeller)
  • Laser Systems
  • managed by SLAC (Bill White)

3
XTOD Scope
  • Transport the x-ray beam, in vacuum, to all the
    experimental stations
  • Condition the x-ray beam, with attenuators and
    apertures
  • Analyze the x-ray beam, with sophisticated
    diagnostics

4
XES Scope
The X-Ray Endstation Systems group provides
the infrastructure required for experimenters to
make best scientific use of the LCLS radiation
safely. Includes advanced x-ray detector RD.
5
Laser Group Scope
The Laser group coordinates laser design and
acquisition throughout the LCLS. Lasers will be
used in the electron gun and x-ray experimental
areas, and also possibly for accelerator
diagnostics and alignment.
6
LUSI Project Scope
LCLS Ultrafast Science Instruments is a
distinct DOE project closely coordinated with
LCLS. It will build 4 science instruments which
will occupy LCLS x-ray hutches. This will enable
work in three of the LCLS Science Thrust Areas
X-ray pump-probe dynamics, Coherent x-ray
imaging, and X-ray photon correlation
spectroscopy. The project is ramping up, with
major funding expected in FY2007.
7
X-Ray Systems Status
  • FY2006 is a design year
  • XTOD designs are undergoing reviews now
  • XES designs ready for review in a few months
  • FY 2007 is a build year
  • Ready for installation starting August 2007
  • Ready for first light in Spring 2008

8
Recent Events
  • FAC Oct 2005 Recommendations
  • Coordinate with experiment teams
  • Make x-ray mirror design a priority
  • Dont cut flipper mirrors or move FEH
  • LCLS actions
  • Coordinating with LUSI
  • Mirror optics design underway
  • Had to cut flipper mirrors and move FEH

9
NEH
Hutch 1 9.5x10m
Hutch 2
Hutch 3
Flipper Mirrors
10
Reduced scope FEH design
Entrance tunnel
single beamline
46ft tunnel
Hutch 4
Hutch 5
Hutch 6
19ft tunnel
212ft
11
Other Cuts
  • Some XTOD diagnostics
  • Not needed for commissioning, expect to add as
    part of operations
  • Some XES generic detectors
  • Expect that LUSI will provide experiment-specific
    detectors
  • XES support for generic computers for experiments
  • Expect that LUSI will provide experiment-specific
    computers

12
Other Developments for XTOD
  • New Physics Liaison Peter Stefan
  • Revised work plan incorporating cuts
  • Designs moving through review stage

Gas attenuator prototype
Slits
Beam transport
13
Other Developments for XES
  • New hires
  • John Bozek, AMO physicist
  • Niels van Bakel, Detector physicist
  • Revised work plan incorporating cuts
  • 2d x-ray detector development program on schedule
  • Working closely with upgraded LCLS Controls Group

14
LUSI Progress
  • Jerry Hastings is now Project Director
  • Initial hiring taking place
  • Nadine Kurita, Chief Engineer
  • Bill Foyt, Project Manager
  • Working closely with XES and XTOD groups to
    develop an optimal layout for experiments

15
Better Beam-Splitting Plan
  • LCLS and LUSI are working on an updated
    beam-splitting plan, and a way will be found to
    implement it
  • This includes not only splitting of the beam to
    the FEH, but also splitting into a soft x-ray
    line and hard x-ray line in the NEH
  • Will allow quicker changes between experiments
  • Has become possible as experiment designs are
    beginning to crystallize

16
NEH
AMO
X-ray pump-probe
SXR
soft x-ray line
hard x-ray line
Flipper Mirrors
17
FEH
XPCS
Coherent x-ray imaging
High energy density science
18
Summary
  • Cuts have been made, but not too drastic
  • Design effort underway
  • LUSI is beginning to help
Write a Comment
User Comments (0)
About PowerShow.com