Slayt 1 - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

Slayt 1

Description:

DOKUZ EYLUL UNIVERSITY SCHOOL OF MARITIME BUSINESS AND MANAGEMENT DEPARTMENT OF DECK US TIDAL CURRENT Prepared by Sel uk NAS HOT Time Time Drift of Ebb Current Drift ... – PowerPoint PPT presentation

Number of Views:59
Avg rating:3.0/5.0
Slides: 16
Provided by: SEL110
Category:
Tags: business | slayt | turkey

less

Transcript and Presenter's Notes

Title: Slayt 1


1
DOKUZ EYLUL UNIVERSITYSCHOOL OF MARITIME
BUSINESS AND MANAGEMENTDEPARTMENT OF DECK
US TIDAL CURRENT
Prepared by Selçuk NAS
2
(No Transcript)
3
HOT
HW Time
LW Time
Time
Drift of Flood Current
Max Flood
Max Flood
Slack
Slack
Time
Slack
Slack
Drift of Ebb Current
Max Ebb
4
(No Transcript)
5
(No Transcript)
6
Drift of Flood Current
Max Flood
Max Flood
Slack
Slack
Time
Slack
Slack
Drift of Ebb Current
Max Ebb
7
(No Transcript)
8
(No Transcript)
9
Question We will wait to New York Pilot at the
Ambrose Pilot Station. Arriving the pilot will
take 3 hours. Please find the time and drift of
the max current. 17.02.1999 1105 LT

10

11
Slack Maximum 0130
2,2E 0453 0726 2,2F 1040 1358 2,4E 1728
1951 2,0F 2259
This Curve Only Belongs to New York Harbour does
not Ambrose
12
Slack Maximum 0130
2,2E 0453 0726 2,2F 1040 1358 2,4E 1728
1951 2,0F 2259
2,4E
1,9E
17.02.1999 1105 LT
13
Question Please Find the drift at the time of
POB 17.02.1999 12 45 LT
14
Interval between slack and maximum current
Interval between slack and desired time
17.02.1999 12 45 LT
13 51 10 15 3 36
1,9 E . 0,85 1,6 Knot
10 15 12 45 2 30
Selçuk Nas
15
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com