Title: National Power Authority
1National Power Authority
Thermal Diesel Generator
Transmission Network Lines
Area View of Bumbuna Power House
2Power Supply and Demand Outlook in the Western
Area
- Installed Capacity - SUPPLY
- Hydro Conventional 50 6MW
- Thermal Oil Based 26.5 (5) 6 6 1.28MW
- 2. Demand 100MW, Western Area
- Note
- Suppressed demand due to aged, weak transmission
Distribution network and inadequate source of
generation
3Core Responsibility of the National Power
Authority (NPA)
- The National Power Authority is charged with the
responsibility to - Generate
- Transmit and Distribute
- Market
- Our Vision, Mission and Values
- Vision-to be the market leader in the supply of
electricity - Mission Statement-We are committed to provide
reliable, affordable and quality electricity to
our customers in a cost effective manner - Values Customer Services Customer is King
- Instill in our employees the respect for
customers add value to the company by providing
quality service in a timely manner.
4Western Area Improvement in Generation Capacity
- There are presently two main sources of power
generation - 1. Hydroelectric Power Plant (Bumbuna) 50MW
- 2. Thermal Diesel Engine Power Plant 26.5MW
- Four (4) thermal generating plants were installed
in the Western Area since the inception of H.E
Dr. Ernest Bai Koroma in 2007 and the Bumbuna
Hydroelectric Plants successfully completed in
Sept. 2009. - 2x5MW (10MW) Niigata Engines, JICA at Kingtom
Power Station - 2x8.28MW (16.56MW) Wartsila Engines, BADEA/SFD
Blackhall Power Station.
5Generation Consumption Data
6Interventions in the Transmission and
Distribution (TD)
- Considerable repair works done on the TD Network
to strengthen its transportation capability by
initially procuring US2.3million emergency TD
materials for Freetown - Power and Water Project (SLPWP) for the supply,
construction and installation of the 33kV
Transmission Network. To further improve the
integrity of the transport capacity of the
Freetown T D Networks - JICA phase I project supply, construction and
installation of 11/33kV Network from Kingtom via
Congo town, Congo Cross and Wilberforce to
Regent - NPA management has maintained the existing TD
network capacity 35 - 40MW -
7Western Area Improvement in Transmission and
Distribution Cont.
- Extension of electricity supply to US Embassy,
IMATT and part of the mountain rural villages is
ongoing. The Ministry of Energy is responsible
for the implementation of this project. NPA is
supervising the project to comply with best
engineering practices. - Government of Japan (GoJ) has approved a grant
for the construction and installation of 11/33kV
Network from Wilberforce to Goderich and 15MVA
primary substation at old SLBC compound at
Goderich
8Prepaid Meters Installation/Impact on Commercial
Loss Reduction
- About 45,000 prepaid meters have been installed
in the Western Area. - About 7,000 prepaid meters have been installed
in the BKPS - About 5,500 prepaid meters have been installed
in Makeni - About 400 prepaid meters have also been
installed in Lungi
9Impact on Technical and Commercial Loss
Reductions
- The replacement of credit meters with prepaid
have led to the following - 1. Increase in revenue collection
- 2. Reduce illegal abstraction of electricity
- 3. Reduce commercial losses
- 4. Improve overall operational efficiency
10Overall Financial Performance of the Utility
- General improvement in 2011 and 2012 in revenue
collection due to improved generation and
installation of prepaid meters - Increase cost of operation due to increase
utilization of our thermal plants
11NPAs Capacity Building
- Training of staff was the pillar on which this
Management relies on in achieving the basic
objective of NPA. Both International and Local
training was extensively conducted in upgrading
staff capacity, below are some of the courses
offered - INTERNATIONAL
- Training conducted in Japan
- Improvement of Electric Power Distribution Grid,
sponsored by JICA - Transmission and Distribution Improvement,
sponsored by JICA - Training conducted in China
- Hydro Power Technology for Small Hydros for
Developing Countries - Energy Policies and Development
- Bio Energy
- Training conducted in Sweden
- Electricity Distribution Management, sponsored by
SIDA - Training conducted in Poland and South Africa
- Training on Apator, and Conlog meters, Ultima STS
Vending System
12NPAs Capacity Building Cont.
- LOCAL/OVERSEAS TRAINING
- Management Level
- Performance Management/Leadership Training,
conducted by EXL Management Services (SL) Ltd - Secretariat Level
- Management Development for Confidential
Secretaries and Personnel Assistance - Training on Computer Software operation
- Technical Level
- Transmission and Distribution
- Underground Cabling and Maintenance Practice,
conducted by JICA - Overhead Lines and Maintenance Practice,
conducted by JICA - Generation
- Plants Maintenance and Operations, conducted by
JICA