Work Breakdown Structures - PowerPoint PPT Presentation

About This Presentation
Title:

Work Breakdown Structures

Description:

East Tennessee State University ENTC 4060 Project Scheduling Work Breakdown Structures & Scheduling Work Breakdown Structures Bill of Materials (BOM) format Work ... – PowerPoint PPT presentation

Number of Views:98
Avg rating:3.0/5.0
Slides: 16
Provided by: SEATEC
Learn more at: http://faculty.etsu.edu
Category:

less

Transcript and Presenter's Notes

Title: Work Breakdown Structures


1
Work Breakdown Structures Scheduling
  • East Tennessee State UniversityENTC 4060
  • Project Scheduling

2
Work Breakdown Structures
  • Bill of Materials (BOM) format

3
Work Breakdown Structures
Project Task 1 Subtask 1.1 Task 2 Subtask
2.1 Subtask 2.2 Subtask 2.3 Task N
  • IndentedBOMformat

4
WBS Level Names
  • 1. Program
  • 2. Project
  • 3. Task
  • 4. Sub Task
  • 5. Work Package
  • 6. Effort or Activity

5
WBS Level Names
  • Common names terms facilitate
  • Communication
  • Understanding
  • All parties should use a common level naming
    convention

6
When Developing a WBS
  • Identify necessary tasks
  • Dont worry about the particular orderyet
  • Dont worry about particular details yet

7
Scheduling develops the sequence not the WBS
development
8
WBS Development Process
  • First Identify all work that needs to be done
  • Then Identify who, how long, when, and how
    much( and resources)

9
Estimating Work
  • Estimate WBS to level of required accuracy
  • Granularity
  • Exact estimates are oxymoronic(e.g., jumbo
    shrimp)

10
Scheduling
  • The goal of scheduling is to maximize parallel
    activities to minimize time
  • Minimal time yields
  • the most aggressive schedule
  • an ideal (unrealistic) target

11
Scheduling
  • Overlap work when possible(lead vs. lag)

12
Scheduling Methods
  • Manual (PERT) quickest!!!!
  • Post-It notes on white board
  • Computer-based (Gantt)
  • MS Project, Primavera

13
Gotchas!!
  • Watch for dangles
  • Unattached tasks with no predecessors /or
    successors
  • Remember resource constraints

14
Adding personnel isnt always the best answer
  • The Mythical Man-Month
  • by Fredrick Brooks
  • Brooks was the System 36 Project Manager for IBM
  • Collection of summary evaluation essays to Tom
    Watson (CEO)

15
Change Control
  • The world will not stand still while a plan is
    being executed.
Write a Comment
User Comments (0)
About PowerShow.com