Title: PLAN
1PLAN
- 150Nd story
- MENPHIS in France short description
- how to keep the installation ?
- a scenario to go further
SNO - SuperNEMO 150Nd meeting Idaho
University November 7, 2007 S. Jullian, LAL Orsay
2150Nd STORY
- ? February 2006 a discovery MENPHIS in
France, - Alain Petit (CEA)
3Achievements of the French SILVA uranium
enrichment program A. PETIT, G. BORDIER, P.
LEMAIRE et al., CEA
Gaseous diffusion
Ultracentrifugation
4Basics of the SILVA/AVLIS process (1/4)
- Selective photoionization
Choosing an efficient photoionization scheme is a
very difficult task ? 3 wavelengths l1, l2, l3
5Basics of the SILVA/AVLIS process (2/4)
depleted U collecting plate
enriched U collecting plate
photoionizing laser beam
vapour jet ( natural U)
6Basics of the SILVA/AVLIS process (3/4)
light-vapor interaction volume
depleted U collector
enriched U collectors
enriched U stream
depleted U stream
feed stream
reflux
electron beam gun
water cooled crucible
7Basics of the SILVA process (4/4)
8Milestones of the AVLIS process (USA)
1972 Beginning of the AVLIS Project at Los
Alamos 1992 150 kg (2) 112 hours (9 hours
full flow) 1992-95 Work on Gd and Er 1997
400 hours (280 hours for enrichment) 1999 the
AVLIS program is stopped in USA
920002003 Program Menphis facility
Design 2001 Building 2002 1st test early
2003 1st full scale exp. june 2003
10Menphis enrichment experiment results
- Main results for the process
- 204 kg of enriched uranium at
- ? 2.5 mean (predicted) value
- About 2000 kg natural U evaporated
- ?400 on line assay measurements
11- 16 March 2006 visit of the installation at
Pierrelatte (s-e France) - talk (see later)
- ? 12 July 2006 Neutrino 2006 conference
- Dominique ? International statement
12- 25 October 2006 letter of F. Avignone to M.
Spiro, Director of IN2P3/CNRS - 27 October 2006 letter of Art. Mc Donald to M.
Spiro - ? 28 October 2006 E.mail from G. Wormser,
Director of LAL (Orsay) - to B. Bigot Haut Commissaire à lEnergie
Atomique , CEA Conseiller scientifique du
Président et du Gouvernement - ? 7 December 2006 D E N gives a negative
advice - Department of Nuclear Energy CEA
- ? December 2006 Jaca SuperNEMO meeting
- John Baker Nd purification is feasible
13- ? March 2007 ILIAS European statement for
150Nd, - see Dominique
- ? 17 April 2007 new meeting with the Haut
Commissaire - CEA at Saclay all the main people in charge
of MENPHIS - again a 2? 150Nd talk
- ? Mai 2007 SuperNEMO collaboration statement
- ? 2 mai 2007 new visit of MENPHIS with the
- Haut Commissaire and all the staff
14- ? 21 mai 2007 visit at Laboratoire des Terres
Rares - CNRS pure Nd or an alloy could be evaporated
- ? 4 juin 2007 visit at lINPG Grenoble a
short note - It is possible to evaporate and to collect Nd
- ? mid August 2007 framework fixed by the Haut
- Commissaire with questions to IN2P3
- 12 September 2007 meeting in IN2P3
- 1) Nd is decoupled from SuperNEMO an
experiment with - Se82
- 2) a Nd international collaboration must be
established to - go further
I hope we will be able to go further, why ?
15Masse du Neutrino de MajoranaIntérêt du 150Nd
- Pierrelatte
- 16 mars 2006
- S. Jullian - LAL, Orsay
16New enriched isotopes
- 76Ge because Ge is a semiconductor
- 130Te because 33 130Te in NatTe
- 136Xe Xenon is a a noble gas so a good detector
- 100Mo Q 3 MeV and chemistry
- 82Se Q 3 MeV and 2?2? 1020y
- purification OK
- 48Ca, 96Zr, 150Nd, no gaseous compound
- ? no centrifugation
- ? no enrichment
LASER Separation a dream why ?
17Factor of merit of 150Nd
Activity A A0? ? M0? ?2 x G0? (Z, Q??) x lt
m?gt2
150Nd is the best for GO? phase space
18Conclusion
- ?possibility to enrich 3 new isotopes 150Nd, 48Ca
and 96Zr is a new step for the discovery of 2?0?
at a level of ltm?gt 50 meV - mass of enriched isotopes 100 kg
- 150Nd is the best candidate for SuperNEMO
19Conclusion 2nd talk
- CEA, Saclay 17 April 2007, S.Jullian (LAL, Orsay)
- 150Nd a dream for ??0?, 1st priority for the
SuperNEMO collaboration - constraint on 222Rn and 214Bi NO
- phase space 100 kg 150Nd equivalent to 1 700 kg
of 76Ge - ??0? to the excited state phase space with Q
2.7 MeV - Nuclear matrix element may be good but ?
- Mo? (SUSY) 150Nd the best
20Scenario a proposalto be discussed
- Phase 1
- - feasability test of evaporation and
collection - - design for MENPHIS
- Phase 2
- - operation of MENPHIS with the laser
- - first run to measure the yields, 10 to 100 g
could be produced - Program schedule
- Duration 2 years
- Cost 600 k Euros
- Laboratories IN2P3/CNRS
-
- IN2P3/CNRS 50
- Others SNO ?, 50
- Discussions with Livermore, real know-how in the
US to get an advice on the feasibility to enrich
Nd with MENPHIS -