Endcap Muon Project CSC - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

Endcap Muon Project CSC

Description:

Create and follow a Compact Muon Solenoid-Cathode Strip Chamber (CMS-CSC) ... by the TD Quality Assurance Officer and implemented by the Fermilab Project Site ... – PowerPoint PPT presentation

Number of Views:20
Avg rating:3.0/5.0
Slides: 9
Provided by: dang5
Category:

less

Transcript and Presenter's Notes

Title: Endcap Muon Project CSC


1
Endcap Muon Project - CSC
  • Nelson Chester
  • Chamber Project Engineer
  • DOE/NSF Review
  • February 17 - 19, 1999

2
Lab 8 Facilities
3
Small Panel Flow
4
Large Panel Flow
5
(No Transcript)
6
OUTLINEChamber Project Engineer
  • Chamber Engineering
  • Drawings/BOM for ME234/2
  • Status of other chambers
  • Factory Layout
  • Production at Lab 8
  • Floor Plan / Production Rate
  • Production in MP9
  • Floor Plan / Production Rate
  • QA/QC System
  • Travellers
  • Discrepancy Reports
  • Safety
  • Procurements Kits for Foreign Sites
  • Summary and Conclusions

7
Quality Assusrance Control
  • Use the infrastructure already in place at
    Fermilab and within Technical Division (TD) that
    has led to the success of past mass production
    projects (the Main Injector Magnet Program being
    the last).
  • Create and follow a Compact Muon Solenoid-Cathode
    Strip Chamber (CMS-CSC) Specific Quality
    Implementation Plan (SQIP) with oversight by the
    TD Quality Assurance Officer and implemented by
    the Fermilab Project Site Management as approved
    by the CMS Project Management.
  • Integrate Quality Assurance and Quality Control
    into all aspects of the CMS-CSC Project Design
    and Manufacturing as defined in the CMS-CSC SQIP.

8
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com