Title: Muon Endcap Alignment Analog Sensor Calibrations
1Muon Endcap AlignmentAnalog Sensor Calibrations
Software Update
- Samir Guragain, Marcus Hohlmann
- Florida Tech
- October 2005
USCMS EMU meeting Fermilab, Oct 21/22, 2005
2ME Alignment System
Transfer plate
Z-sensors
Clinometers
Note only small sample of analog sensors shown
R-sensors
DCOPS
To be featured in Physics TDR Vol.1
3Overview
- Update on analog sensors
- Final calibration results for two types of
Z-sensors - Final calibration results for Clinometers
- ME1 proximity (PX) sensors
- Software preparation
- Overall data flow
- To do list
- Plans for Magnet test
4Recent activities
- Built specialized calibration mounts for ME1 Z-,
R-, proximity-sensors, ME4 R-sensors - Calibrated all clinometers, Z-sensors and shipped
to PSL/FNAL for mounting - Initiated alignment software development
activities during 1-month summer stay at LPC - Graduated a CMS M.S. student
- (Marion Ripert, now working with Laszlo Gutay
at Purdue)
5Progress update
Note Each sensor is sub- jected to 5 calibration runs Total in System Calibrations completed To do
R-sensors 84 60 24 (ME1,4)
Z-sens., potentiometers Z-sensors, lasers 72 12 72 12
Clinometers 48 48 (6 spare)
ME1 Proximity sensors 72 0 72
6Full set of Z-potentiometers Sensor-to-sensor
variation
Slopes lt 1 variation
Abs (
)
Note In the end, we will actually use fit
results for response relative to a reference
voltage V(z)sensor/Vref
7Full set of Z-potentiometers Relative errors
on slopes
Error on slopes
8ME1 Z-Laser sensors
Z-laser sensor (ME1)
Linear Mover (barrel)
IR laser beam
Z-potentiometer (link to ME2)
Diffusely reflective surface
9Typical Z-laser response (ME1)
Trial1 ME1-TP3-ZLB11
Slope 1.0062 (V/cm) Error in slope 0.00039
(V/cm)
Distance cm
10Full set of Z-lasers Sensor-to-sensor variation
Slopes 1 variation
11Full set of Z-lasers Relative errors on slopes
Error on slopes
12Typ. Clinometer response
Angle deg
13Full set of Clinometers Sensor-to-sensor
variation
in X
in Y
Slopes 6 variation
Note Pos. and neg. inclinations are fitted
separately each device has two
entries in each histogram.
14Full set of Clinometers Relative Errors on
Slopes
in X
in Y
Errors on Slopes 0.3
15Total Calibration Uncertainties
Final numbers for all sensor types
(specifications) R-sensors 100 µm (lt
430 µm) Z-sensors 55 µm (lt
1000 µm) PX-sensors 55 µm Clinometers
0.02o
16ME1 proximity sensors
Ready to perform calibrations
2 prox. sensors
Linear mover
Establish absolute reference distance
Prec. dowel pins
Precision reference bar
Calibrate 2 sensors simultaneously
17Road to Completion
- Calibrate deliver in this order
- ME1 PX sensors
- ME1 R sensor
- ME-1 PX sensors
- ME-1 R sensors
- ME4 R sensors
- Spare clinometers
- Document calibration project in CMS note
18Alignment Software
- July 05 While at LPC, initiated contact with
Calibration, Alignment, Database (CalAliDB)
working group - leadership Lee Lueking (FNAL)
- Oliver Buchmüller (CERN)
- Now Tri-weekly meetings on alignment DB issues
- Muon Barrel Link people also participating
- attempt to unify alignment software for
- tracker and muon as much as possible
- Fl. Tech working with Lee Luekings group
19Data Structure Flow
As of October 2005
(auto-conversion of existing ascii geometry
from old COCOA version Pedro Arce)
CSC Alignment object contains chamber
offsets ?xi ?yi ?zi ?ai ?ßi ??i...
(Fl. Tech)
(Fl. Tech)
(Fl. Tech)
Magnet-off Photogrammetry Survey data
MUON TRACKS
(by hand Dave Eartly?)
(by hand - Fl. Tech)
20Integrated some analog sensors into COCOA
Note Sensor sizes greatly exaggerated for
visibility
SLM
z
DCOPS
R-sensors
Representations of R-sensors
front CSC
SLM reference
Visualization output from COCOA alignment model
back CSC
Samir Guragain, MH LPC July 2005
21To do list
- Produce COCOA version in CMSSW (P. Arce)
- Develop COCOA-IN COCOA-OUT (Fl. Tech
tracker?) - Transform calibration data, sensor data,
geometry, survey data into database formats for
use by COCOA - Have started w/ strawman table for analog sensor
calibration - Need to verify nominal COCOA geometry against CAD
files and actual nominal on-detector geometry
(Fl.Tech D. Eartly) - Understand COCOA performance for ME with magnet
test data - create alignment object as output for offline
reco use
22Magnet test
- Main goal (in my opinion) Get good data !
- Mostly analyze it later
- Ensure that ME alignment system is fully
instrumented and can be read out - Planning to send Fl. Tech grad student Samir
Guragain to CERN for 5-6 months in January 2006
to help commission read-out - get MO support from Giorgio to do so
- Magnet-off photogrammetry (Dave Eartly)
23Magnet test contd
- Test basic functionalities first
- Do the controls work (e.g. lasers for SLMs) ?
- Does the readout work?
- Do raw sensor readings make sense
- (magnet off vs. magnet on) ?
- Does the raw data get written out properly in
event data format ? - Suggested alignment exercise
- Move disks relative to each other and relative to
barrel by few mm and detect with Z-sensors - with magnet off (is this even possible?)
24Magnet test contd
- Output parameters from COCOA fits for
reconstruction - 6 parameters per chamber
- ?x, ?y, ?z displacements of chamber centers
- ?a, ?ß, ?? rotation of chambers
- Currently no plans to align at a lower level
(strips, wires) with the hardware alignment
system. Maybe later we can get more sophisticated
once the basics are under control. -
25Summary Outlook
- Calibration of Clinometers and Z- sensors done.
Keep on calibrating R- and PX. Finish soon ! - Software side of alignment gaining momentum.
- Jump into it full-time as soon as hardware done.
- Lots to do.
- Help commission alignment DAQ at CERN starting
early 2006.
26Loosely related news
Friday afternoon
Florida Tech