Title: Projects supporting WFD implementation
1Projects supporting WFD implementation
- Training regional staff of MoEW on WFD (2005)
- Ecological Survey of the Surface Waters in
Hungary www.eu-wfd.info/ecosurv (2004-2005) - Promoting the implementation of Water Framework
Directive Phase II. (2006-2007) see details next
slide
2EU Transition Facility support
Promoting the implementation of Water Framework
Directive Phase II. Objectives to develop / set
up (1) an economic-analytical system and method
for the selection of the most cost-effective PoM,
(2) a Pilot River Basin Management Plan
(Upper-Tisza), (3) a PP strategy, (4) four water
information centres. www.vkiprojekt.hu EN
summary
3Support system
to facilitate harmonised planning at every level
- Uniform principles (importance and approach of
problems) - Common criteria
- Clear aspects for decisions
- Uniform economic methods
- Centralised operation, continuous development
Freedom in the application
Excel macroprogram For professional planners,
not user friend. Catalogue of 63 measures!!!
4Corporate image of WFD
5RBM planning started
Draft RBMP time table and workprogramme published
December 2006 nationwide consultation first half
of 2007 Completed version end 2007
A Víz Keretirányelv 14. cikke és a 221/2004 (VII.
21.) Kormányrendelet 19.-a szerinti társadalmi
részvétel és konzultáció dokumentuma. Írásbeli
vélemények küldhetôk a Vízügyi Központ és
Közgyûjtemények postacímére (1410 Budapest Pf.
56.), illetve elektronikus formában
az vgt.utemterv_at_ovf.hu címre 2007. június 30-ig
beérkezôleg. 2006. december 22.
6RBM planning schedule
7Approaching deadlines
December 2008 draft RBM plan to be followed by a
6 month consultation December 2009 final RBM
plan 2012 PoM operational
8Levels of RBM planning
(1) Danube 34,730 km2
(4) Balaton 5,775 km2
(2) Tisza 46,380 km2
(3) Drava 6,145 km2
9Levels of RBM planning
42 planning sub-units
(1) Danube 16
(4) Balaton 2
(2) Tisza 21
(3) Drava 3
Boundary of EW directorates
10 RBM Planning responsible orgs.
EEOP HUF 2.5 billion Beneficiaries 12 EW
directorates CWED
Country CWED
Danube
Balaton
Tisza
Drava
11Reassessment of WBs
Compared to report
108?185
12SWMIs uploaded 22 Dec 2007 Consultation extended
till 31 July 2008 Invited stakeholders meeting 22
September
13Regrouping of SWMIs
- issues to be addressed by the PoM of the RBMP,
- issues addressed by the measures of other EU
directives and Hungarian national acts / decrees
and to be considered in the RBMP, - issues not related to the WFD and not to be
addressed in the RBMP.
14Example of local SWMIs
15Amendement of gov. min. decrees
- Infringement (formal letter)
- Other reasons as well
- GW directive,
- lessons of pilot projects,
- results of PP
16Amendement of gov. min. decrees
- More precise definitions
- Replacing 17 planning units with 42 sub-units
- Harmonisation with GW directives
- Setting up new / reshuffling existing water
management committees - .
17Conclusion
- Unprecedented exercise
- Costly but unavoidable
- Hungary is gladly challenged with the
implementation and succeeded to meet the
requirements so far - Make better use of project results
- Open process (PP regular fine-tuning)
18Conclusion
European river basin national local
levels need to co-operate for reaching good
water status by 2015
19Thank you for your attention