Projects supporting WFD implementation - PowerPoint PPT Presentation

1 / 19
About This Presentation
Title:

Projects supporting WFD implementation

Description:

(1) an economic-analytical system and method for the selection of the most cost-effective PoM, ... Draft RBMP time table and workprogramme published December 2006 ... – PowerPoint PPT presentation

Number of Views:26
Avg rating:3.0/5.0
Slides: 20
Provided by: Czmo8
Category:

less

Transcript and Presenter's Notes

Title: Projects supporting WFD implementation


1
Projects supporting WFD implementation
  • Training regional staff of MoEW on WFD (2005)
  • Ecological Survey of the Surface Waters in
    Hungary www.eu-wfd.info/ecosurv (2004-2005)
  • Promoting the implementation of Water Framework
    Directive Phase II. (2006-2007) see details next
    slide

2
EU Transition Facility support
Promoting the implementation of Water Framework
Directive Phase II. Objectives to develop / set
up (1) an economic-analytical system and method
for the selection of the most cost-effective PoM,
(2) a Pilot River Basin Management Plan
(Upper-Tisza), (3) a PP strategy, (4) four water
information centres. www.vkiprojekt.hu EN
summary
3
Support system
to facilitate harmonised planning at every level
  • Uniform principles (importance and approach of
    problems)
  • Common criteria
  • Clear aspects for decisions
  • Uniform economic methods
  • Centralised operation, continuous development

Freedom in the application
Excel macroprogram For professional planners,
not user friend. Catalogue of 63 measures!!!
4
Corporate image of WFD
5
RBM planning started
Draft RBMP time table and workprogramme published
December 2006 nationwide consultation first half
of 2007 Completed version end 2007
A Víz Keretirányelv 14. cikke és a 221/2004 (VII.
21.) Kormányrendelet 19.-a szerinti társadalmi
részvétel és konzultáció dokumentuma. Írásbeli
vélemények küldhetôk a Vízügyi Központ és
Közgyûjtemények postacímére (1410 Budapest Pf.
56.), illetve elektronikus formában
az vgt.utemterv_at_ovf.hu címre 2007. június 30-ig
beérkezôleg. 2006. december 22.
6
RBM planning schedule
7
Approaching deadlines
December 2008 draft RBM plan to be followed by a
6 month consultation December 2009 final RBM
plan 2012 PoM operational
8
Levels of RBM planning
(1) Danube 34,730 km2
(4) Balaton 5,775 km2
(2) Tisza 46,380 km2
(3) Drava 6,145 km2
9
Levels of RBM planning
42 planning sub-units
(1) Danube 16
(4) Balaton 2
(2) Tisza 21
(3) Drava 3
Boundary of EW directorates
10
RBM Planning responsible orgs.
EEOP HUF 2.5 billion Beneficiaries 12 EW
directorates CWED
Country CWED
Danube
Balaton
Tisza
Drava
11
Reassessment of WBs
Compared to report
108?185
12
SWMIs uploaded 22 Dec 2007 Consultation extended
till 31 July 2008 Invited stakeholders meeting 22
September
13
Regrouping of SWMIs
  • issues to be addressed by the PoM of the RBMP,
  • issues addressed by the measures of other EU
    directives and Hungarian national acts / decrees
    and to be considered in the RBMP,
  • issues not related to the WFD and not to be
    addressed in the RBMP.

14
Example of local SWMIs
15
Amendement of gov. min. decrees
  • Infringement (formal letter)
  • Other reasons as well
  • GW directive,
  • lessons of pilot projects,
  • results of PP

16
Amendement of gov. min. decrees
  • More precise definitions
  • Replacing 17 planning units with 42 sub-units
  • Harmonisation with GW directives
  • Setting up new / reshuffling existing water
    management committees
  • .

17
Conclusion
  • Unprecedented exercise
  • Costly but unavoidable
  • Hungary is gladly challenged with the
    implementation and succeeded to meet the
    requirements so far
  • Make better use of project results
  • Open process (PP regular fine-tuning)

18
Conclusion
European river basin national local
levels need to co-operate for reaching good
water status by 2015
19
Thank you for your attention