COBRA Magnet Status - PowerPoint PPT Presentation

About This Presentation
Title:

COBRA Magnet Status

Description:

No (fake) quench for 8 months before December since fixing the previous noise problem... External noise was observed again in the quench detector signal line. ... – PowerPoint PPT presentation

Number of Views:85
Avg rating:3.0/5.0
Slides: 6
Provided by: megIcepp
Category:
Tags: cobra | magnet | quench | status

less

Transcript and Presenter's Notes

Title: COBRA Magnet Status


1
COBRA Magnet Status
  • W. Ootani
  • MEG collaboration meeting, Feb. 8th, 2007

2
COBRA in Run 2006
  • COBRA was pretty stable except for two
    incidents...
  • Field stability 0.05(FWHM)

Monitored field
BTS OFF
BTS ON
  • We had two unexpected quenches during one week
    running.
  • Dec.16th, 2130 COBRA ON
  • Dec.19th, 1905 First quench (cooling water
    problem?)
  • Dec.21st, 1200 Second quench
  • Dec.22nd, 700 COBRA OFF

3
Quench Problem
  • We had two quenches during the beam time in last
    December.
  • No (fake) quench for 8 months before December
    since fixing the previous noise problem...
  • External noise was observed again in the quench
    detector signal line.
  • Much faster than the previous one
  • New noise source? inside the MEG system?
  • What measures can be taken?
  • Look for the noise source
  • Modify shielding and grounding scheme
  • Different method to detect quench? SQD?
  • A few good things to know...
  • Nothing was damaged by the quench.
  • Quick recovery (2.5hrs) thanks to newly
    installed TMP

4
(No Transcript)
5
Schedule
  • Feb.13 Refrigerator maintenance
  • Feb.23 COBRA will be cold.
  • - mid-Apr. Investigate quench problem
  • Look for noise source
  • Improve shielding and grounding
Write a Comment
User Comments (0)
About PowerShow.com