2Construction finished!
- Construction was finished!
- Excitation test was done between Jun.21th and
Jul.7th.
Compensation coils
Superconducting coil in cryostat
Potentiometer
Support frame
3Construction finished!, contd
Power supply for SC
Instrument panel
Refrigerator
Power supply for NC
NC current adjustor
4Excitation test
- Purposes
- Excitations with up to 5 and 10 higher coil
current for the SC and NC, respectively. - Intentional quench tests.
- Quench propagation in the SC.
- Temperature rise.
- Voltage rise.
- Optimization of the protection heater
parameters. - Stress distribution in the superconducting
magnet. - Interaction between SC and NC.
- Safety circuit of the magnet control system.
- Stability and accuracy of power supply.
- Test of the device for the magnetic field
measurement. - Installation procedure.
- Driving system of Hall probe.
- Test measurement of the magnetic field.
- Fringe field in the photon detector region.
5Two Troubles in Excitation Test
- Cold spots on the inner wall of the cryostat.
- Dew condensation around the spots.
- Radiation shield is touching the cryostat wall.
- No problem in the magnet operation.
- But, it might be problem for the detectors
installed into the magnet or filed measurement
(Hall probe stability). - Protection heaters in the downstream end-coil
were broken. - Protection heater When a quench occurs somewhere
in the magnet, all coils are intentionally
quenched using protection heaters to avoid local
energy dump. - Quench without the protection heater might damage
the coil due to voltage and temperature rise in
the coil.
6Cold Spots
- Radiation shield is thermally connected to the
cryostat wall due to too much superinsulation
layers in narrow gap. - Dew condensation was observed around the cold
spots. - The magnet will be disassembled to fix this
problem.
7Quench Test Results
- Voltage rise in the quench triggered by the
protection heaters in all the coils except the
end coil with broken heater. - Coil current 300A
Voltage across the end coil with broken heater
rose up to 900V.
8Quench Test Results, contd
- Temperature rise in the quench triggered by the
protection heaters in all the coils except the
end coil with broken heater. - Coil current 300A
DT (central coil)
Temperature of the central coil rose up to 110K.
9Excitation w/o protection heater
- We were increasing coil current step by step and
carefully checking the temperature and voltage
rise in the intentional quench tests, but we had
to give up the excitation with full operating
current (360A) for the SC only for safety reason. - We reached 300A (83 of normal operating current)
for the SC and successfully done the quench test
at the coil current. - We found the SC magnet worked well under much
more severe conditions. (DV-900V, DT110K) - For the NC, I400A(111 of normal operating
current) reached.
10Strain
- No strange behavior up to coil current of 300A.
- Mechanical strength was already confirmed in the
previous excitation test of the central part of
the magnet last November.
11External Control System of Magnet
- External operation of the magnet using MIDAS
slow control system (MSCB) was tested in this
excitation test. - Control software based on LabVIEW.
MSCB modules
12Field Measurement Device
- Point-by-point precision of the field map
10Gauss - 3-axis Hall probe.
- Position accuracy a few hundred mm
- Ultrasonic motor with a rotary encoder
(4000pulses/rotation) - for R- and Z-motion and high-torque AC
servo-motor for q-motion - Timing belt will be used for the motion in all
directions - Probe position is measured by optical scale
sensors
13Field Measurement Device, contd
- Construction completed.
- Installed into the COBRA cryostat and tested
during the excitation test. - Test measurement of the COBRA field was done
with the Hall probe used in the Belle magnet.
Hall probe
14Field Measurement Device, contd
- Test measurement of the magnetic field was done
in the excitation test. - SC Coil only.
- Coil current 200A (Normal operating current
360A). - No calibration of Hall probe.
- Hall probe and driving system were roughly
aligned to the magnet cryostat.
Really graded!!
Good agreement with calculation!
15Fringe Field
- Fringe field around the photon detector region
was roughly measured. - ISC180A, INC180A (50 of full excitation)
- The fringe field in the full excitation can be
estimated by simply scaling.
- The compensation of the fringe field works very
well! - Fringe field is suppressed below 50 Gauss all
over the photon detector region as designed.
16Summary
- Construction of the COBRA magnet was finished.
- Excitation test was done between Jun.21th and
Jul.7th. - Two problems.
- Cold spots in the inner wall of the cryostat.
- Protection heaters in the downstream end-coil are
broken. - I300A (83 of normal operating current) reached
for the SC, but full excitation had to be given
up because the full excitation w/o protection
heater is dangerous. - I400A (111 of normal operating current) reached
for the NC. - Field measurement device was completed.
- Test measurement was done in the excitation test.
- Measured magnetic field shows good agreement with
calculation. - Precise field measurement will be done at PSI.
- Fringe field around the photon detector region
was measured. - Good suppression of the fringe field.
17Summary, contd
- We are now strongly confident in the performance
of the COBRA magnet. - Graded magnetic field and small fringe field as
designed. - Survived under much more severe conditions
(DV-900V, DT110K). - Good mechanical performance up to 300A (no
strange behavior in strain plots). - Two problems can be easily fixed after the test.
- More reliable and powerful protection heater
- Reduce the superinsulation layers.
18Schedule