Title: COBRA Magnet Status


1
COBRA Magnet Status
  • W.Ootani
  • MEG Experiment Review Meeting, Jul. 2004

2
COBRA Excitation at pE5
  • Apr.13 COBRA installation
  • Apr.13-15 Cryostat evacuation
  • Apr.16-19 Cooling
  • Apr.21-26 Excitation
  • Excitation test (Superconducting Magnet(SC) and
    Compensation Coils(NC))
  • Fringing field measurements and test of active
    shielding in pM3
  • PMT test for Timing counter inside COBRA
  • PMT test for LXe calorimeter near COBRA
  • Apr.29 Beam is back

3
COBRA Installation in pE5
  • COBRA placed at almost right place on beam line
    without platform.

4
Excitation at pE5
  • Only 4days for cooling thanks to LN2 pre-cooling.
  • Both SC and NC successfully tested at full
    operating current. (The first time to fully test
    NC.)
  • COBRA provided perfectly stabilized field
    (?B/Blt0.05) for PMT tests.

5
Fringing Field Measurements
Fringing field measured at pE5
Gauss
4.2
6.8
9.1
6.7
18.5
83.8
50.5
9.0
33.5
433.7
440.3
31.2
7.5
73.3
20.4
56.3
69.7
19.8
7.8
11.6
11.3
6
Fringing Field Measurements
Fringing field measured outside area
Gauss
0.5
1.6
1.6
1.6
8.4
6.1
4.0
pE5
2.1
3.3
4.8
7
Fringing Field Measurements
Requirement
Measured
µE1 lt 20mG
Neighboring area
0.5G
pE3 µLan lt 1G µCap lt 1G
2-4G
ECRIT lt ?G
1-2G
pE5
pM32 GPS lt 20mG
1.8G
pM33 LTF lt 20mG
0.3G
pM3 beam line Kicker lt ?G Septum lt ?G
3.3G
4.8G
8
Fringing Field Measurements
  • Fringing field was measured as predicted
    (unfortunately).
  • The problems are being fixed for most places.
  • Fringing field was successfully compensated in
    µSR facilities at pM3 using compensating coils.
    Control system has to be implemented.
  • Fringing field at pE3 seems possible to be
    reduced lt 1G by passive shielding.
  • Detector at ECRIT did not work when COBRA was ON.
  • Effect on kicker and septum in pM3 beam line has
    to be checked.

9
Possible Solution in pE3
  • Installation of active shielding in the detector
    (µLAN, µCAP) is difficult because of limited
    space and cost(?).
  • Passive shielding
  • Shielding box built with 5mm-thick soft iron
    plates (5m-D, 4m-W, 3m-H)
  • No front wall for minimizing influence on beam
    optics
  • Roof might not be necessary. (For good
    accessibility)

Without roof
With roof
Beam
Beam
10
Summary
  • COBRA magnet was installed in pE5 and totally
    tested.
  • PMT tests were carried out by using COBRA field.
  • ?B/Blt0.05
  • Stray field around LXe detector region is
    successfully canceled.
  • Fringing field was measured in the neighboring
    beam line and problems are being fixed.
  • It was found that active shielding is able to
    compensate COBRA field very well.
  • Calibration of field mapping machine will be made
    this year.
  • System alignment
  • Calibration of Hall sensors
  • Investigate possibility to use NMR
  • Field map reconstruction
  • Final field measurement is supposed to be carried
    out during shutdown period in 2006 after beam
    line commissioning is finished.

11
Schedule
Feb. 2004
Jul. 2004