Title: Pathway to the SKA


1
Pathway to the SKA
Steve Rawlings (Oxford) for the European SKA
Consortium and the International
(globalPREPSKA, FP7 funded) SKA Project
www.skatelescope.org
2
Science Vision I
EoR neutral HI towards a z10 radiogalaxy first
detections possible with Pathfinders
Magnetism magnetic fields in clusters, galaxies
and the IGM. Breakthrough science in Phase-1
Cosmology 107 galaxies to z0.8 in Phase-1,
109 galaxies to z2 in Phase-2. Hence dark
energy w and neutrino mass
3
Science Vision II
Gravity via Pulsars detection of gravitational
waves via Pulsar Time Array, possibly in Phase 1
Deep Continuum surveys and gravitational lensing
Transients new classes of objects and new ways
of studying known objects, e.g. exoplanets
4
Phased Approach
  • Currently funded SKA RD (2007-2012) 140 M
  • Nature (array/IT-driven) allows phased
    implementation
  • Pathfinders ? Phase 1 ? Phase 2 ? Phase
    3
  • Fixed cost for construction
  • 300 M (Phase 1)
  • antennas/feeds/signal processing 200 M
  • infrastructure/software/computing/delivery/managem
    ent 100 M
  • 1500 M (Phase 12)
  • antennas/feeds/signal processing/computing 1000
    M
  • infra/software/computing/delivery/management 500
    M
  • SKAcost (SKA Memos 92, 93)
  • Expected operating costs 100 million /year

5
(No Transcript)
6
SKA timeline phased delivery of science
SKA-midlow Complete
Site Select
Reference Design selected
SKA Pathfinders Complete
Phase 1 complete
Preliminary SKA specs
External Engineering Review of design
Sites short-listed
Pathfinder science
Early Science SKA midlow
06 08 10 12 14 16 18 20
22 24
System Design
SKA mid low construction and commissioning
Concept Desn
Phase 1 construction and commissioning
Pathfinder Suite Construction
SKA-hi Construction
System design SKA-hi
Concept design for SKA-hi
Costed SKA lowmid designs complete
Review Hi-freq SKA Design
1 SKA 10 SKA 0.07-10 GHz 100
SKA 0.07-10 GHz sensitivity to galaxies
10m 100m
1000m Mapping speed
VLAx10-100 gtVLAx1000
gtVLAx106
Transformational science in each
phase
cf optical telescopes
7
Recent Technology Breakthroughs
USA 0.5-11 GHz feed for the ATA
eEVN data transferred by optical fibres for
real-time correlation
ZA 15 m fibreglassfoam dish (lt2mm r.m.s.)
The Netherlands LOFAR - first images with an
Aperture Array
The Netherlands APERTIF (DIGESTIF) - first
images with a Focal Plane Array
8
Developing the SKA Community
  • Build on SKADS Marie Curie Conferences and
    Training (MCCT) programme
  • Embed PhD students in exploitation of SKA
    pathfinders, simulation and design for SKA,
    where possible in collaboration with industry
  • Motivates Path2SKA, FP7 Marie Curie Initial
    Training Network (ITN) to be submitted Sep 2008
    to support gt30 European PhDs in collaboration
    with global project, e.g. via visits to
    pathfinders