Title: Chapter 16, Methodologies: Putting it all together


1
Chapter 16, Methodologies Putting it all
together
2
Outline
  • A Mountaineering Example
  • Project Context
  • Goals, Environment, Methods, Tools, Methodology
  • Methodology Issues
  • Planning, Design Reuse, Modeling, Process,
    ControlMonitoring, Redefinition
  • Methodology Spectrum
  • Royces Methodology based on the unified process
    (Separate Slides)
  • Extreme Programming (Separate Slides)
  • Methodological Heuristics

3
Key Decisions in an Expedition
  • A leader has to answer several key questions to
    create a successful expedition
  • What mountain should be climbed?
  • What process should be used?
  • What types of tools should be used?
  • Who should be member of the team?
  • Does the expedition need a leader?
  • Different answers to these questions lead to
    different styles
  • Fixed-rope Style
  • Alpine Style

4
Key Decisions in an Software Project
  • Project goals
  • Schedule
  • Cost
  • Project organization
  • Software life cycle Model
  • Tools
  • Methods
  • Team members

5
Project Context
  • Project environment
  • Defined by the client and by the current state of
    the development organization. The environment
    constrains the project manager.
  • Examples Participants background, problem type,
    location of the project.
  • Methods
  • Recipes that the project manager can select in
    the given environment.
  • Examples use case requirements elicitation or
    design pattern reuse.
  • Tools
  • Devices or programs that support specific
    activities.
  • Examples modeling tools, compilers, debuggers,
    change tracking tools.
  • Software engineering methodology
  • Collection of methods and tools for developing
    and managing a software system to achieve a
    specific project goal in a given project
    environment.
  • Specifies when methods or tools should be used,
    when not and what to do when unexpected events
    occur.

6
Project Environment
  • Participants expertise
  • Client type(Application Domain Knowledge,
    Decision Power)
  • End user access
  • Technological climate
  • Geographical distribution
  • Project duration vs rate of change

7
Client Type
  • Local King Client
  • Can make decisions
  • Deep knowledge of application domain
  • Usually collocated with the project.
  • Does not report to anybody else
  • Can answer developer questions
  • Can effectively collaborate with developers and
    project manager.
  • Proxy Client
  • Stands in for real client, who has no time or
    physical distance makes collaboration with the
    organization difficult.
  • Has sufficient knowledge of application domain
  • Cannot make major decisions.

Low
High
Domain Knowledge
Decision Power
Local King Client
Pseudo Client
High
  • Pseudo Client
  • Often member of the development organization
    (e.g. marketing)
  • The system is targeted at new market segment.
  • Can make decisions in a short time
  • Collaborates well with developers
  • Limited knowledge of application domain.
  • No Client
  • Many projects start without a client.
  • Example A visionary product is developed before
    a market segment is opened.

No Client
Proxy Client
Low
8
Local King Client
  • The local king client is a client who can answer
    developer questions and make decisions without
    having to ask anybody else.
  • The local king has deep knowledge of the
    application domain and is usually collocated with
    the project.
  • Local kings do not report to anybody else and can
    effectively collaborate with the developers and
    the project manager.

9
Proxy Client
  • Proxy clients are sent for the real client.
    Reasons
  • Real client has no time
  • Physical distance would make collaboration of
    real client with the organization difficult.
  • Proxy clients have sufficient knowledge of the
    application domain to answer clarification
    questions from the developers
  • Proxy clients do not have sufficient power of
    representation to make major decisions.

10
Pseudo Client
  • The pseudo client is a member of the development
    organization (e.g., the marketing department)
  • The pseudo client acts as a client, because the
    system is targeted at a new market segment, as
    opposed to a single individual or company.
  • Pseudo clients can make decisions within a short
    time and can collaborate well with the
    development organization
  • Pseudo clients have a limited knowledge of the
    application domain.
  • Often developers act as pseudo clients.

11
No Client
  • A project can start without a client, for
    example, when a visionary product is developed
    before a market segment is opened.
  • In most of these cases, however, the project
    selects a pseudo client, so that the stakes of
    the developers can be balanced against the stakes
    of the future user.

12
End User Access
  • Clients and end users usually do not have the
    same interests
  • Clients are interested in
  • an early delivery date
  • as much functionality as possible
  • low cost.
  • End users are interested in
  • a familiar user interface
  • an easy to learn user interface
  • A system that supports their specific task well
  • The project success may also depend on a
    usability test to be conducted by end users

13
Technological climate
  • Depending on the requirements expressed by the
    client, a project may be constrained in the
    technological components it has to use. Examples
  • A project improving a legacy system deals with
    well-known and mature technology. But the
    technology might be out of date
  • A project developing a first-of-a-kind prototype
    based on a technology enabler may have to deal
    with preliminary versions of components and
    immature technology.

14
Geographical Distribution
  • Single room projects All participants are
    located in a single room, they can get to know
    each other, much of the important coordination
    can occur informally.
  • There are situations when single-room projects
    are not possible or not desirable.
  • The organization may have resulted from the
    merger or acquisition of several individual
    companies with different skills.
  • The organization is a consortium or a temporary
    alliance of several subcontractors, located in
    different geographical locations.
  • Some part of the development organization may
    need to be collocated with the client.
  • Geographical distribution has advantages and
    disadvantages
  • Increases the availability of skill and lower
    cost labor
  • May take advantage of different time zones
  • Slows communication
  • Lowers awareness among teams
  • Leads to loss of information between sites

15
Methodology Issues
  • Methodologies provide guidance, general
    principles and strategies for selecting methods
    and tools in a given project environment.
  • The key questions for which methodologies
    typically provide guidance include
  • How much planning should be done in advance?
  • How much of the design should result from reusing
    past solutions?
  • How much of the system should be modeled before
    it is coded?
  • In how much detail should the process be defined?
  • How often should the work be controlled and
    monitored? When should the project goals be
    redefined?

16
How much Planning?
  • Two styles of navigation Gladwin 1964
  • European navigation
  • Current Location and Desired Location
  • Planned Route
  • Route Deviation and Route Correction
  • Polynesian navigation

17
European Navigation
Event Course deviation.
18
Polynesian Navigation
We need a new place for living. Lets go to
Auckland
Event Birds seen
19
Auckland Project Plan (European Navigation)
  • Project Goal Auckland
  • Desired Outcome Auckland is found
  • Team Captain and 50 sailors
  • Organization Flat hierarchy
  • Tools Compass, speed meter, map
  • Methods Determine planned course, write planned
    course before departure. Example Start Lima.
    Sail West, keep the compass constantly at 97
    degrees, stay at latitude 20 degrees)
  • Work breakdown structure
  • Task T1 (Check direction) Determine current
    direction of ship
  • Task T2 (Compute deviation) Determine deviation
    from desired course
  • Task T3 (Course Correction) Bring ship back on
    course
  • Process
  • T1 and T2 are executed hourly. If there is a
    deviation, T3 is executed to bring the ship back
    on the planned course.
  • Schedule With good wind 50 days, if doldrums are
    encountered, 85 days.

20
Auckland Project Plan (Polynesian Navigation)
  • Project Goal Auckland
  • Desired Outcome A new place for living is found
  • Team Captain and 50 sailors
  • Organization Flat hierarchy
  • Tools Use stars for navigation, measure water
    temperature with hand
  • Methods Set up a set of event-action rules. When
    an event occurs, determine the action to be
    executed in the given context.
  • Work breakdown structure
  • Task T1 (Determine direction) Set direction of
    ship to a certain course
  • Task T2 (Check Clouds) Look for non-moving
    clouds in the distance
  • Task T3 (Check Birds) Look for birds and
    determine their direction
  • Task T4 (Compute course) Determine new course
    for ship
  • Task T5 (Change course) Change direction to
    follow new course
  • Process
  • Start with T1. Tasks T2 and T3 are executed
    regularly. The result (cloud detected, birds
    detected, nothing happened) is interpreted in
    the current context. If the interpretation makes
    a new course more promising, execute task T4 and
    T5.
  • Schedule None

21
Situated action
  • Situated action Suchman 1990
  • Selection of action depends on the type of
    event, the situation and the skill of the
    developer. Also called context-dependent
    action.
  • Examples of navigation events Course
    deviation, Birds seen, Clouds seen.
  • European Navigation is context independent
  • Event Course deviation in the morning
  • Action Course correction towards planned route
  • Event Course deviation in the evening
  • Action Course correction towards planned route
  • Polynesian Navigation is context dependent
  • Event Birds seen, Context Morning
  • Action Sail opposite to the direction the
    birds are flying
  • Event Birds seen, Context Evening
  • Action Sail in the direction the birds are
    flying

22
Example Running a rapid
A quiet river
Unplanned event A Hydraulic!
Desired Location
Current Location
What can we do?
23
Change
  • Change
  • Something becomes clear (crystalizes)
  • Something new appears (technology enabler)
  • Something becomes important (change of
    requirements)

24
Project duration vs Rate of Change
  • Three Definitions
  • PT Project Time
  • TBC Time Between Any Type of Change
    (Requirements, Technology)
  • MTBC Mean Time Between Change

Phase 1
Phase 2
Phase 3
to
tn
t1
t2
25
Frequency of Change determines the Choice of the
Software Lifecycle Model
  • Mean Time between Change gtgt Project Time
  • Change is rare
  • Choose an activity-oriented model Waterfall
    model, V-Model
  • Mean Time between Change Project Time
  • Changes occur occasionally during the project
  • Choose an activity-oriented model with
    iterations Boehms spiral model, Unified Process
  • Mean Time between Change ltlt Project Time
  • Changes are normal (Change is constant)
  • Choose an entity-oriented model Issue-based
    model, Feature-driven model

26
Pros and Cons of Project Plans for Software
Projects
  • Plus
  • Very useful to kick off a software project (to
    establish the goals, organize the teams, and
    start with development)
  • Useful also controlling a software project if
    the outcome is predictable or when no major
    change occurs.
  • Con
  • Of limited value to control the project when the
    outcome is unpredictable or when unexpected
    (unusual) events occur in the project that
    change the project context.
  • Examples of unexpected events
  • Appearance of new technology which was unknown at
    project start.
  • A visionary scenario turns out to be not
    implementable
  • Company is merged with another one during the
    project

27
Methodology Issues
  • How much planning should be done in advance?
  • How much of the design should result from reusing
    past solutions?
  • How much of the system should be modeled before
    it is coded?
  • In how much detail should the process be defined?
  • How often should the work be controlled and
    monitored? When should the project goals be
    redefined?

28
How much Reuse?
  • Reuse can significantly reduce the development
    effort required to deliver a system.

29
(No Transcript)
30
How much Modeling?
  • Advantages of modeling
  • Modeling enables developers to deal with
    complexity
  • Modeling makes implicit knowledge about the
    system explicit
  • Modeling formalizes it so that a number of
    participants can share this knowledge.
  • If one is not careful, models can become as
    complex as the system being modeled.

31
Managerial Challenges of Modeling
  • Modeling presents several challenges to the
    manager
  • Formalizing knowledge is expensive.
  • It takes time and effort from developers, and
    requires validation and consensus so that every
    participants agrees on the same meanings.
  • Models introduce redundancy.
  • If changes are made to the system, the models
    must be updated as well. If several models depict
    the same aspects of the system, all must be
    updated. If one model becomes out of sync, it
    loses its value.
  • Models become complex.
  • As the model complexity becomes similar to the
    complexity of the system, the benefit of having a
    model is reduced significantly.

32
Where do we need Models?
  • Models support three different types of
    activities
  • Communication The model provides a common
    vocabulary. An informal model is often used to
    communicate an idea.
  • Analysis/Design Models enable developers to
    reason about the future system.
  • Archival Compact representation for storing the
    design and rationale of the system.
  • Models are beginning to support Model-Driven
    Architecture RJL
  • UML2.0/MDA includes Code Generation
  • Persistent database management from static
    information models
  • Behavioral control flow from state transition
    models
  • Concurrent distributed systems from Activity
    Diagrams
  • Use cases validated from Sequence Diagrams (event
    history traces)

33
The Future of Models? RJL - 05s523
  • Models are beginning to support Model-Driven
    Architecture
  • This implies complete consistent unambiguous
    specification
  • UML2.0/MDA anticipates Code Generation for
  • Persistent database management from static
    information models
  • Behavioral control flow from state transition
    models
  • Concurrent distributed systems from Activity
    Diagrams
  • Use cases validated from Sequence Diagrams (event
    history traces)
  • This is state-of-the art in specialized
    application domains
  • CCITTs SDL for Telecommunications apps
  • MicroSofts initiative for Domain-Specific
    Languages (SDL)
  • (Possibly in response to OMGs UML2/MDA)
  • For embedded software applications using
    ExecutableUML tools
  • Project Technology/Bridgeport/Steve Mellor
  • Kennedy-Carter, LTD/Alan Carter
  • PathFinder Solutions/Peter Fontaine

34
Models to support Communication
  • Most often used in the early phases of a project
    and during informal communications.
  • The model does not have to be consistent or
    complete
  • The notation does not even have to be correct
  • The model is used only to communicate an idea to
    another person.
  • If the idea is understood, the model has served
    its purpose.
  • UML is our preferred notation for models to
    support communication.
  • Other notations are acceptable, especially if the
    other person does not speak UML.
  • Example The customer or the future end users
    usually dont know UML.
  • Communication Media
  • Can be on a Whiteboard, on a slide or even on a
    napkin.
  • .

35
Napkin Design
36
Model for Bus Stops (used in Slide Presentation)
Street Segments
Bus Stop
Adresses, length
Schedule
Bus Route
Street
name
name
Bus
37
Models to support Analysis and Design
  • The model provides a representation that enables
    developers to reason about the system.
  • The model also forms the basis for coding, as
    CASE tools are able to convert models into source
    code templates
  • Used during analysis, design and implementation.
  • The model needs to be made consistent or complete
  • The notation should be correct so it the model
    can be entered into a CASE tool.
  • The model is used to communicate the idea to a
    tool.
  • UML is our preferred notation for models to
    models that support analysis and design. Other
    notations are not acceptable.
  • Models to support analysis and design are
    eventually entered into a CASE tool.

38
A UML Model for Bus Stops
next to

located on
Bus Stop
Street Segment
location
Addresses(left, right) length

Day
number


line id
Schedule
line id
Bus Route
Street
Time

name type
name
traverses
stops at
exactly 2

Intersection
Bus

id x,y
39
Input for User Interface Generator
40
Models to support Archival
41
Screen Snapshot of Graphical User Interface
42
UML can model more than Software Systems
  • UML has been designed to model software
    artifacts.
  • However, UML is a modeling language that can be
    used to model a variety of phenomena
  • projects and processes, even philosophical
    systems.
  • The models for projects and processes used in the
    book are models intended for communication.

43
Model of a Software Project



44
Model of a Software Process
Example V-Model
45
Models for Platos and Aristotles Views of
Reality
Aristotle
Plato
46
How do we Communicate a Complex Model?
  • To communicate a complex model we use navigation
    and reduction of complexity
  • Do not simply use a picture from the CASE tool
    and dump it in front of the user
  • The key is navigate through the model so the user
    can follow it.
  • Start with a simplified model and then decorate
    it incrementally
  • Start with key abstractions (use animation)
  • Then decorate the model with the additional
    classes
  • To reduce the complexity of the model even
    further
  • Show the use of inheritance (for taxonomies, and
    for design patterns)
  • If the model is still too complex, show the
    subclasses on a separate slide
  • Then show the use of any patterns used in the
    model
  • Make sure to use the name of the patterns

47
Example A More Complex Model of a Software
Project
48
Another attempt to navigate through the same model
49
Another attempt to navigate through the same model
50
(No Transcript)
51
How much Process?
  • Modeling a software life cycle similar to
    modeling a system.
  • The process allows to reason over it, devise
    and implement improvements
  • Participants can share process knowledge with
    the rest of the organization.
  • - Process knowledge is difficult to make explicit
    and maintain up-to-date
  • Trade-off faced by the project manager
  • From no modeling of the process to detailed
    process that may be tailored.
  • Well-known application domain or solution
    domain
  • Use a repeatable process model Paulk et al.,
    1995
  • Distributed organization
  • Use of a process model enables a high degree of
    standardization and a lower level of
    miscommunication.
  • Prototyping or concept exploration
  • Trying to control such a process is difficult or
    not useful, as it is usually not repeated. Best
    to follow an entity-based life cycle.
  • Colocated experienced developers
  • Follow an entity-based life cycle or use no
    process.

52
Pitfalls when repeating a process
  • When modeling a software life cycle process and
    reusing it in a different project, the project
    manager should make sure that the correct
    knowledge is being generalized and reused.
  • Example First ascent of K2
  • Mahdi had experienced one climb (Nanga Parbat)
    which started as a hierarchical, fixed rope
    expedition.
  • At the end he saw one climber (Buhl), refusing to
    listen to the expedition leader and going solo
    for the summit (in alpine style, so to speak).
  • He concluded that this was the way such
    expeditions were conducted.

53
How much Control and Monitoring?
  • If the project has a detailed plan the actual
    progress can be checked against the planned
    progress
  • On one end of the spectrum, a plan could be so
    detailed as to plan and monitor the progress of
    each participant on each day.
  • At the other end of the spectrum, a plan could
    include a single milestone indicating the
    delivery, leaving participants to plan their own
    work accordingly.
  • While both approaches are unreasonable, the
    project manager must choose a point somewhere in
    between that fits the project environment.
  • Control and monitoring is especially critical
    during an iterative process.
  • The change process needs to track changes, from
    request, to approval, assignment, and
    implementation. Metrics such as the amount of
    code that was scraped or reworked and the size of
    the change are critical to control the overall
    quality of the system.
  • In general, both planning and assessing the
    actual progress requires experience.
  • Two major problem areas
  • Projects with novices
  • Projects involving the development of innovative
    systems

54
Controlling Projects involving Novices
  • Projects involving novices are hard to control.
    Two reasons
  • Estimation of tasks is difficult
  • Novice project managers are poor judges of time
    estimates for tasks.
  • Project managers without technological experience
    are poor judges of time estimates for
    development tasks.
  • Novice participants are poor judges of their
    progress
  • Difficult issues are not recognized/communicated
    in a timely manner
  • Heuristics to deal with these problems
  • Select a hierarchical reporting organization with
    more experienced participants in the middle
    levels.
  • Define milestones as demonstration and
    scenario-based reviews (as opposed to documents)
    to force participants to confront difficult
    issues early.
  • Select peer-reviews, walkthrough, and peer
    programming techniques, to facilitate the
    transfer of knowledge from experts to novices
  • Create the possibility of informal communication
    channels

55
Controlling projects for innovative systems
  • The development of an innovative system makes it
    difficult to plan accurately as there is a lack
    of precedents.
  • To control an innovative development, a project
    manager can increase the frequency of milestones,
    while leaving their exact content flexible,
    providing more opportunities for project goals to
    be refined and redirected.
  • If the developers are experienced, a project
    manager can leverage off the knowledge of
    experienced developers by enabling them to
    provide estimates for tasks and revise the
    project plan or the process model accordingly.

56
If the Project Goal cannot be achieved
  • A project goal is too ambitious or the original
    goal is simply wrong. Continuing is not an
    option.
  • Option 1 Ask for more resources or a revised
    schedule.
  • Often not really an option, because there is no
    more money and the schedule is fixed.
  • Option 2 Admit the problem and turn the project
    into a successful failure
  • Do a thorough analysis to understand what went
    wrong.
  • Focus on the failure to determine lessons
    learned.
  • Try to recycle the work that has been achieved so
    far for another project.
  • Option 3 Revise the project goal
  • Turn the current project status into the goal.
  • Sometimes the revised project goal is actually
    as good or better than the originally envisioned
    goal (Polynesian navigation).

57
Methodologies
  • Separate Slide Set for Royces Methodology
  • Separate Slide Set For Extreme Programming

58
Methodology Dos and Do Nots
  • Try to train the client.
  • Train the developers about the process
  • Try to find a dedicated lab for all the
    developers
  • Think carefully about how to maintain the
    infrastructure
  • Use version control as an integration tool
  • Make sure to have resources to deal with
    iteration overlaps
  • Make sure to allow informal communication

59
Methodological Heuristics
  • Be prepared to change the system
  • Functional requirements can change during a
    project when the client becomes more experienced
  • Technological change can occur any time
  • Be prepared to change the organization
  • Move from hierarchical organization to
    participatory management when project
    participants are becoming capable of making
    decisions
  • Be prepared to change the process
  • Move from activity-oriented to entity-oriented
    during a project when beginners become
    experienced developers
  • Shorten client decision time
  • Train the client
  • Build trust
  • Learn the right lessons and nothing more.

60
Summary
  • Invest time to train the client.
  • Train the developers about the process
  • Try to find a dedicated lab for all the
    developers
  • Think carefully about how to maintain the
    infrastructure
  • Use version control as an integration tool
  • Make sure to have resources to deal with
    iteration overlaps
  • Make sure to allow informal communication