Title: Chapter 6: System Development


1
Chapter 6 System Development
  • Analyzing designing systems
  • Prototyping
  • IS project types

2
State of the Industry
  • There are many good ideas for implementing
    computer systems in business
  • Bringing in a project on time
  • within budget
  • as specified
  • is very difficult

3
Software Development Alternatives
  • Code-and-Fix
  • Waterfall
  • Prototyping
  • Spiral Model
  • Rapid Prototyping
  • Others like component assembly projects and CASE
    tool which involve a degree of reuse of
    previously developed project.

4
Waterfall Model
  • System feasibility Boehm (1988)
  • Software plans requirements
  • Product design
  • Detailed design
  • Code
  • Integration
  • Implementation
  • Operations Management

5
Prototyping (Evolutionary)
  • Develop system on a small scale
  • let user try the system
  • User identifies needed improvement
  • Especially good if benefits hard to identify
  • (better decision making)
  • also appropriate to compare alternatives

6
Spiral Model
  • The spiral model is a systems development
    lifecycle (SDLC) model used in information
    technology (IT). This model of development
    combines the features of the prototyping model
    and the waterfall model. The spiral model is
    favored for large, expensive, and complicated
    projects.
  • The steps in the spiral model can
    be generalized as follows
  • The new system requirements are defined in as
    much detail as possible.
  • A first prototype of the new system is
    constructed from the preliminary design.
  • A second prototype is evolved by a four
    procedure
  • - evaluating the first prototype in
    terms of its strengths, weaknesses, and risks
  • - defining the requirements of the
    second prototype
  • - planning and designing the second
    prototype
  • - constructing and testing the
    second prototype.
  • At the customer's option, the entire project can
    be aborted if the risk is too great.
  • The existing prototype is evaluated in the same
    manner as was the previous prototype, and, if
    necessary, another prototype is developed.
  • The preceding steps are iterated until the
    customer is satisfied.
  • The final system is constructed, based on the
    refined prototype.
  • The final system is thoroughly evaluated and
    tested.

7
The spiral Model loops
Cycle 1 Cycle 2
Risk analysis Risk analysis
Prototype Prototype
Operation concept Models
Requirements plan Software requirements
Life cycle plan Requirements validation
8
The spiral Model loops cont..
Cycle 3 Cycle 4
Risk analysis Risk analysis
Prototype Prototype
Models Models
Software product design Detail design
Validation verification Coding and unit testing
Integration test plan Integration user acceptance, and implementation
9
Quotes..
  • Some people make things happen, some watch things
    happen, while others wonder what has happened.
  • Those who do not read are no better off than
    those who cannot. 
  • Two things are infinite the universe and human
    stupidity and Im not sure about the universe.
    Albert Einstein 
  • Vision without action is a daydream. Action
    without vision is a nightmare. 
  • If I had nine hours to chop down a tree, Id
    spend the first six sharpening my ax. Abraham
    Lincoln 
  • Failures are divided into two classes those who
    thought and never did, and those who did and
    never thought.

10
Risks and Responses
  • Personnel best talent training
  • team building
  • Budget schedule multiple estimates
  • design to budget
  • requirements scrubbing
  • Wrong functions user surveys, prototype
  • User interface prototyping, scenarios

11
Risks and Responses
  • Excessive features requirements scrubbing
  • Many changes high change threshold
  • External component problems

  • compatibility analysis,

  • benchmarking
  • Real-time perform simulation, benchmarking
  • prototyping
  • Technical limits cost/benefit
  • prototyping

12
Rapid Prototyping
  • - Is a software development methodology that uses
    minimal planning in favor of rapid prototyping.
    The "planning" of software developed using RAD is
    interleaved with writing the software itself. The
    lack of extensive pre-planning generally allows
    software to be written much faster, and makes it
    easier to change requirements.
  • - It involves methods like iterative development
    and software prototyping.
  • - Four phases of RAD are
  • Requirements planning
  • User design
  • Construction
  • Cutover, testing training and installation

13
Other Systems Development Options
  • Component Assembly Model (CAM) has a close
    resemblance with the Rapid Application
    Development (RAD) model.
  • CAM uses a lot of previously made components.
  • CAM doesnt need to develop programs from
    scratch, but it will be putting together powerful
    components. All the developers has to do is to
    know what the customer wants, look for the
    components to answer the need and put together
    the components to create the program.
  • Component Assembly Projects
  • typically object oriented modules
  • Rapid Application Development
  • techniques for compressing the life cycle
  • - Computer Aided Software Engineering
  • - Joint Application Development

14
Software Development Standards
  • Standards are the key to effective quality
    management
  • They may be international, national,
    organizational or project standards
  • Product standards define characteristics that all
    components should exhibit e.g. a common
    programming style
  • Process standards define how the software process
    should be enacted (performed)

15
Importance of Standards
  • Encapsulation of best practice- avoids repetition
    of past mistakes
  • Framework for quality assurance process - it
    involves checking standard compliance
  • Provide continuity - new staff can understand the
    organization by understand the standards applied

16
PM International Standards
  • CMM, Capability Maturity Model from the Software
    Engineering Institute.
  • GAPPS, Global Alliance for Project Performance
    Standards- an open source standard describing
    COMPETENCIES for project and program managers.
  • A Guide to the Project Management Body of
    Knowledge.
  • HERMES method, Swiss general project management me
    thod, selected for use in Luxembourg and
    international organizations.
  • The ISO standards ISO 9000, a family of
    standards for quality management systems, and
    the ISO 100062003, for Quality management systems
    and guidelines for quality management in
    projects.
  • PRINCE2, PRojects IN Controlled Environments.
  • Team Software Process (TSP) from the Software
    Engineering Institute.
  • Total Cost Management, Framework, AACE
    International's Methodology for Integrated
    Portfolio, Program and Project Management)
  • V-Model, an original systems development method.
  • The Logical framework approach, which is popular
    in international development organizations.
  • IAPPM, The International Association of Project 
    Program Management, guide to Project Auditing and
    Rescuing Troubled Projects.

17
ISO 9001 of JORDAN
18
SEI
  • The SEI works with industry, academic
    institutions and the United States government to
    improve the performance and reliability of
    computer systems by managing pilot programs,
    conducting tests, offering courses and providing
    services for licensing and publication.
  • U.S Defence Dept. funded institute associated
    with Carnegie Mellon
  • Mission is to promote software technology
    transfer particularly to defence contractors
  • Maturity model proposed in mid-1980s, refined in
    early 1990s.
  • Work has been very influential in process
    improvement

19
Maturity model levels
  • There are five levels defined along the continuum
    of the CMM and, according to the SEI
  • Initial (chaotic, ad hoc, individual heroics) -
    the starting point for use of a new or
    undocumented repeat process.
  • Repeatable - the process is at least documented
    sufficiently such that repeating the same steps
    may be attempted.
  • Defined - the process is defined/confirmed as a
    standard business process, and decomposed
    to levels 0, 1 and 2 (the latter being Work
    Instructions).
  • Managed - the process is quantitatively managed
    in accordance with agreed-upon metrics.
  • Optimizing - process management includes
    deliberate process optimization/improvement.

20
The SEI process maturity model
21
Key process areas
22
SEI model problems (CMM)
  • It focuses on project management rather than
    product development.
  • It has no formal theoretical basis. 
  • It concentrate on process, but ignores people.
  • It ignores the use of technologies such as rapid
    prototyping.
  • It does not incorporate risk analysis as a key
    process area
  • It does not define its domain of applicability

23
Effect of CMM LevelMcConnell 1993
Level Cost (mill) Time (months) Quality (def/k) LOC/hr
1 33 40 9.0 1
2 15 32 3.0 3
3 7 25 1.0 5
4 3 19 0.3 8
5 1 16 0.1 12
24
Quote
  • "In times of universal deceit (deception, fraud),
    telling the truth will be a revolutionary act."
  • We are what we repeatedly do.
  • If the idiots hate you, it proves you're not one
    of them!

25
IS Project Types
  • maintenance
  • conversion
  • new systems development

26
Mcleod-Smith view IS project differently
  • System architecture project, strategic system
    plan for the organization.
  • End user projects.
  • Business re-engineering projects, new ways of
    doing business.
  • Technology implementation.
  • Package implementation.

27
Maintenance Projects
  • by far maintenance projects the most common type
    of IS
  • duration
  • training
  • categories
  • fixing errors
  • minor enhancements.
  • major enhancements, high level of design

28
Duration of Maintenance Projects
  • Impact on Organizations Master Plan biggest
    factor
  • if significant contribution to revenue, more
    likely to have established maintenance team
  • can contribute as revenue source (royalties) or
    as a production tool
  • if less revenue impact, MORE LIKELY TO HAVE
    PROJECT TEAM for maintenance

29
Training Maintenance Projects
  • some companies use maintenance as a training
    ground for new employees
  • exposure to maintenance can make an
    organizations operations much clearer

30
FIXING ERRORS
  • clear objective - complexity depends on
  • nature of the system, error, personnel
  • BEST CASE
  • small system, easily traced
  • can assign to someone familiar with it
  • WORST CASE
  • nobody familiar with system
  • very large complex system
  • system evolved from earlier versions

31
MINOR ENHANCEMENTS
  • adding, modifying, deleting data or reports
  • a degree of original design
  • constrained by original design
  • usually not under critical conditions
  • therefore, more likely to examine alternative
    approaches
  • more likely assigned to those with design
    capabilities, knowledge of the organization

32
MAJOR ENHANCEMENTS
  • design implementation scope high
  • wide-scale modification of existing module, or
    development of new module
  • can be a collection of minor enhancements with
    some common characteristic
  • need experienced personnel

33
MAJOR ENHANCEMENTS
  • EASIEST IF
  • personnel know system
  • clear connection to a corporate goal
  • straightforward processes
  • CASE tool used to develop
  • DIFFICULT WHEN
  • new personnel
  • hard to assess criticality of system
  • no design implementation standards

34
CONVERSION PROJECTS
  • change an existing system
  • (not necessarily computerized)
  • manual to computer-based
  • one computer platform to another

35
Convert Manual to Automated
  • closest to pure design development
  • major pitfalls
  • improper specification
  • failure to accommodate changes
  • need knowledge of existing system, desired
    system, how to make transition

36
Conversion Change Management
  • need senior management support
  • need to convince affected employees that the
    change will lead to better working environment
  • JOB REDEFINITION
  • MAY DISPLACE EMPLOYEES - need retraining

37
Convert to New Technologies
  • from one computer system to another
  • NEW JOB DESCRIPTIONS
  • example - text only to text image
  • keyboard only to scanning, working with objects
  • DATA RETRIEVAL changes
  • Conversion to new or emerging technologies much
    more involved

38
Convert to New Technologies
  • SIMPLEST
  • new hardware similar to old
  • new operating system similar to old
  • existing applications modular
  • vendor supplied routines for conversion
  • WORST
  • major change single task to multi-task
  • line-oriented to icon-oriented
  • keyboard to mouse

39
Language-Based Conversions
  • translate from one language to another
  • most from 3GL (COBOL) to 4GL
  • need experts in both old new languages
  • impact on data code structure
  • take full advantage of 4GL

40
Non-procedural Conversions
  • instead of sequential control, statements written
    as rules fired when all conditions satisfied
  • object-oriented approaches
  • objects control processing
  • need expertise in old new languages
  • more code reuse in object-oriented

41
Hardware-based Conversions
  • causes
  • convert to new platform for marketing purposes
  • bring in-house a formerly time-shared system
  • purchase new computing platform
  • most effort in converting low-level input
    output processing routines

42
Hardware-based Conversions
  • same vendor - little problem
  • IBM 32 bit words with 8 bit bytes
  • CDC 60 bit words with 6 bit bytes
  • code (even in same language) wont run same
  • vendors may supply different codes
  • BEST CASE - vendor specific I/O localized in
    routines supplied by vendor
  • USUALLY some adjustments required

43
New Systems Development
  • each type of system has different project
    management characteristics
  • transaction processing (TPS)
  • management control
  • decision support systems (DSS)
  • group support systems (GSS)
  • executive information systems
  • Enterprise Resource Planning (ERP)
  • Internet Commerce (IC)

44
Transaction Processing
  • high volumes of quantitative data, variety of
    input sources
  • drive standard reports, basis for other systems
  • complexity arises from volume
  • may involve complex calculations

45
Management Control
  • more specialized than transaction processing
  • monitor manpower allocations
  • monitor project activities progress
  • monitor production levels
  • monitor sales by region
  • compare expected with actual
  • if variance too great, trigger action

46
Decision Support Systems
  • explore decision alternatives
  • data from a variety of sources
  • may include models
  • Project Team needs expertise in models

47
Group Support Systems
  • allow multiple decision makers to work on
    decision problem
  • Process oriented, their primary function is to
    allow people to communicate
  • can be different time, place
  • Features of GSS includes
  • anonymity
  • brainstorming
  • consensus building

48
Executive Support Systems
  • access to data of all types both in house and
    external.
  • much more subjective data, long range, such
    periodic government reports.
  • INTERFACE critical
  • drill-down data tools for details about the
    summary data.
  • trend analysis - graphics statistics
  • exception reports

49
Enterprise Resource Planning
  • Design to serve all computing needs of an
    organization.
  • Generally implemented in modules.
  • Not trivial to implement
  • Vendors are willing to assist.

50
Internet Commerce
  • Rethinking the business and its key process
  • Developing affordable information technology
    infrastructure
  • Constructing specific internet products and
    services.

51
Recap
  • IS project management can involve a wide variety
    of tasks
  • Need to be able to get technical expertise as
    well as experience with old systems
  • Apply systems approach

52
Systems Development Approach
  • Based on a complete Life cycle analysis.
  • Project proposals are measured on cost, time,
    and performance
  • SDLC phases
  • Specification
  • Design
  • Code (acquisition)
  • Data conversion
  • Testing
  • implementation

53
Specification
  • User identifies need
  • Systems analyst plans solution
  • Feasibility study clear, concise statement of
    the problem
  • Statement of work specification of what is to be
    done
  • MOST PROJECTS DIE IN THE SPECIFICATION PHASE

54
Design
  • How software will meet requirements (vendors make
    a living telling clients that their system is
    exactly what the client needs)
  • OPTIONS make or buy
  • in-house or outsource
  • Request for Proposal specify for bidding
  • OUTPUT detailed list of user requirements and
    system requirements

55
Xerox
  • Halper (1994)
  • Early 1994 outsourced IS to EDS
  • had profit of 620 million on 14.6 billion
  • shed non-core business
  • reduced IS staff by 2,000

56
Code
  • If acquire, Selection of Builder
  • Cost.within the budget
  • Feasibilitybidder can do the project
  • Experiencebidders record on similar project
  • Reputation quality work of bidder
  • cost-benefit study

57
Data Conversion
  • Important in data warehousing, data mining
  • Useful for decision support, executive
    information systems

58
Testing
  • User evaluates system performance
  • transfer to user (installation)
  • TRAINING

59
Implementation
  • Install and check system
  • User Training is a key to success
  • Especially for enterprise-wide systems
  • User evaluates system performance and any problem
    detected will be fixed.

60
Summary
  • System analysis development has evolved a great
    distance
  • Many methodologies exist
  • Unimportant which
  • Helps a great deal to focus on one
  • Standards can increase development productivity
  • Many types of IS projects
  • Development of a system a sequence of functional
    tasks